998 resultados para CAT project
Resumo:
The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.
Resumo:
Georgia’s ‘National Integrity Systems’ are the institutions, laws, procedures, practices and attitudes that encourage and support integrity in the exercise of power in modern Georgian society. Integrity systems function to ensure that power is exercised in a manner that is true to the values, purposes and duties for which that power is entrusted to, or held by, institutions and individual office-holders. This report presents the results of the Open Society Institute / Open Society – Georgia Foundation funded project Georgian National Integrity Systems Assessment (GNISA), conducted in 2005–2006 by Caucasus Institute for Peace, Democracy and Development, Transparency International Georgia, Georgian Young Lawyers Association, in close cooperation with Griffith University Institute for Ethics, Governance and Law (Australia), and Tiri Group (UK), into how different elements of integrity systems interact, which combinations of institutions and reforms make for a strong integrity system, and how Georgia’s integrity systems should evolve to ensure coherence, not chaos in the way public integrity is maintained. Nevertheless all participants of the research may not share some conclusions given in the GNISA report.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
Sing & Grow is an early intervention music therapy project presented to families with additional needs, or those at risk of experiencing disadvantage due to social and/or economic circumstances that may impact on their parenting experiences. The aim of the project is to provide short term music therapy programs to families in communities where access to such services may be limited. The program is strengths-based and focuses on building upon a parent’s capacity to relate to and respond to their child’s emotional and developmental needs.
Resumo:
Sing & Grow is a short term early intervention music therapy program for at risk families. Sing & Grow uses music to strengthen parent-child relationships by increasing positive parent-child interactions, assisting parents to bond with their children, and extending the repertoire of parents’ skills in relating to their child through interactive . Both the Australian and New Zealand governments are looking for evidence based research to highlight the effectiveness of funded programs in early childhood. As a government funded program, independent evaluation is a requirement of the delivery of the service. This paper explains the process involved in setting up and managing this large scale evaluation from engaging the evaluators and designing the project, to the data gathering stage. It describes the various challenges encountered and concludes that a highly collaborative and communicative partnership bet en researchers and clinicians is essential to ensure data can be gathered with minimal disturbance to clinical music therapy practice.
Resumo:
The construction of timelines of computer activity is a part of many digital investigations. These timelines of events are composed of traces of historical activity drawn from system logs and potentially from evidence of events found in the computer file system. A potential problem with the use of such information is that some of it may be inconsistent and contradictory thus compromising its value. This work introduces a software tool (CAT Detect) for the detection of inconsistency within timelines of computer activity. We examine the impact of deliberate tampering through experiments conducted with our prototype software tool. Based on the results of these experiments, we discuss techniques which can be employed to deal with such temporal inconsistencies.
Resumo:
There has recently been noted a rapid increase in research attention to projects that involve outside partners. Our knowledge of such inter-organizational projects, however, is limited. This paper reports large scale data from a repeated trend survey amongst 2000 SMEs in 2006 and 2009 that focused on inter-organizational project ventures. Our major findings indicate that the overall prevalence of inter-organizational project ventures remained significant and stable over time, even despite the economic crisis. Moreover, we find that these ventures predominantly solve repetitive rather than unique tasks and are embedded in prior relations between the partnering organizations. These findings provide empirical support for the recent claims that project management should pay more attention to inter-organizational forms of project organization, and suggest that the archetypical view of projects as being unique in every respect should be reconsidered. Both have important implications for project management, especially in the area of project-based learning.
Resumo:
Managing project-based learning is becoming an increasingly important part of project management. This article presents a comparative case study of 12 cases of knowledge transfer between temporary inter-organizational projects and permanent parent organizations. Our set-theoretic analysis of these data yields two major findings. First, a high level of absorptive capacity of the project owner is a necessary condition for successful project knowledge transfer, which implies that the responsibility for knowledge transfer seems to in the first place lie with the project parent organization, not with the project manager. Second, none of the factors are sufficient by themselves. This implies that successful project knowledge transfer is a complex process always involving configurations of multiple factors. We link these implications with the view of projects as complex temporary organizational forms in which successful project managers need to cope with complexity by simultaneously paying attention to both relational and organizational processes.
Resumo:
Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.
Resumo:
Project selection is a decision-making process that is not merely influenced by technical aspects but also by the people who involved in the process. Organisational culture is described as a set of values and norms that are shared by people within the organisation that affects the way they interact with each other and with stakeholders from outside the organisation. The aim of this paper is to emphasize the importance of organisational culture on improving the quality of decisions in the project selection process, in addition to the influence of technical aspects of a project. The discussion is based on an extensive literature review and, as such, represents the first part of a research agenda investigating the impact of organisational culture on the project selection process applicable specifically to road infrastructure contracts. Four existing models of organisational culture (Denison 1990; Cameron and Quinn 2006; Hofstede 2001; Glaser et al 1987) are discussed and reviewed in view of their use in the larger research project to investigate the impact of culture on identified critical elements of decision-making. An understating of the way organisational culture impacts on project selection will increase the likelihood in future of relevant government departments selecting projects that achieve their stated organisational goals.
Resumo:
Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the fi ndings of an empirical study that compares the level of agreement between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the agreement level between project managers and stakeholders. While the overall agreement level between project manager and stakeholders is medium, results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.
Resumo:
Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO