993 resultados para cover design
Resumo:
"SCS-TP-106"--cover.
Resumo:
"In cooperation with the Minnesota Agricultural Experiment Station and the St. Anthony Falls Hydraulic Laboratory."
Resumo:
Cover title.
Resumo:
Cover title.
Resumo:
NAVSHIPS 900, 185A
Resumo:
"0123-2833-MTDC"--Cover.
Resumo:
Chiefly tables.
Resumo:
Cover title.
Resumo:
A grants program supported by Build Illinois, and the National Endowment for the Arts.
Resumo:
"Study was conducted in cooperation with the U.S. Department of Transportation, Federal Highway Administration."
Resumo:
The Illinois State Employees' Group Insurance Program provides medical, dental, vision and life insurance coverage to Illinois state employees, retirees and their dependents.
Resumo:
Cover title.
Resumo:
This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.
Resumo:
"Contract no. DOT-OS-90040"--P. 2 of cover.
Resumo:
"November 1989."