932 resultados para Project Performance
Resumo:
The effects of farm equipment on the structural behavior of flexible and rigid pavements were investigated in this study. The project quantified the difference in pavement behavior caused by heavy farm equipment as compared to a typical 5-axle, 80 kip semi-truck. This research was conducted on full scale pavement test sections designed and constructed at the Minnesota Road Research facility (MnROAD). The testing was conducted in the spring and fall seasons to capture responses when the pavement is at its weakest state and when agricultural vehicles operate at a higher frequency, respectively. The flexible pavement sections were heavily instrumented with strain gauges and earth pressure cells to measure essential pavement responses under heavy agricultural vehicles, whereas the rigid pavement sections were instrumented with strain gauges and linear variable differential transducers (LVDTs). The full scale testing data collected in this study were used to validate and calibrate analytical models used to predict relative damage to pavements. The developed procedure uses various inputs (including axle weight, tire footprint, pavement structure, material characteristics, and climatic information) to determine the critical pavement responses (strains and deflections). An analysis was performed to determine the damage caused by various types of vehicles to the roadway when there is a need to move large amounts agricultural product.
Resumo:
The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa. Several methods and technologies identified as potentially suitable for Iowa were selected from an extensive analysis of existing literature provided with Iowa Highway Research Board (IHRB) Project TR-632. Using the selected methods, demonstration sections were constructed in Hamilton County on a heavily traveled two-mile section of granular surfaced road that required frequent maintenance during previous thawing periods. Construction procedures and costs of the demonstration sections were documented, and subsequent maintenance requirements were tabulated through two seasonal freeze-thaw periods. Extensive laboratory and field tests were performed prior to construction, as well as before and after the two seasonal freeze-thaw periods, to monitor the performance of the demonstration sections. A weather station was installed at the project site and temperature sensors were embedded in the subgrade to monitor ground temperatures up to a depth of 5 ft and determine the duration and depths of ground freezing and thawing. An economic analysis was performed using the documented construction and maintenance costs, and the estimated cumulative costs per square yard were projected over a 20-year timeframe to determine break-even periods relative to the cost of continuing current maintenance practices. Overall, the sections with biaxial geogrid or macadam base courses had the best observed freeze-thaw performance in this study. These two stabilization methods have larger initial costs and longer break-even periods than aggregate columns, but counties should also weigh the benefits of improved ride quality and savings that these solutions can provide as excellent foundations for future paving or surface upgrades.
Resumo:
Resum en anglès del projecte de recerca L'empresa xarxa a Catalunya. TIC, productivitat, competitivitat, salaris i beneficis a l'empresa catalana té com a objectiu principal constatar que la consolidació d'un nou model estratègic, organitzatiu i d'activitat empresarial, vinculat amb la inversió i l'ús de les TIC (o empresa xarxa), modifica substancialment els patrons de comportament dels resultats empresarials, en especial la productivitat, la competitivitat, les retribucions dels treballadors i el benefici. La contrastació empírica de les hipòtesis de treball l'hem feta per mitjà de les dades d'una enquesta a una mostra representativa de 2.038 empreses catalanes. Amb la perspectiva de l'impacte de la inversió i l'ús de les TIC no s'aprecia una relació directa entre els processos d'innovació digital i els resultats de l'activitat de l'empresa catalana. En aquest sentit, hem hagut de segmentar el teixit productiu català per a buscar les organitzacions en què el procés de coinnovació tecnològica digital i organitzativa és més present i en què la intensitat de l'ús del coneixement és un recurs molt freqüent per a poder copsar impactes rellevants en els principals resultats empresarials. Això és així perquè l'economia catalana, avui, presenta una estructura productiva dual.
Resumo:
Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.
Resumo:
Of the approximately 25,000 bridges in Iowa, 28% are classified as structurally deficient, functionally obsolete, or both. The state of Iowa thus follows the national trend of an aging infrastructure in dire need of repair or replacement with a relatively limited funding base. Therefore, there is a need to develop new materials with properties that may lead to longer life spans and reduced life-cycle costs. In addition, new methods for determining the condition of structures are needed to monitor the structures effectively and identify when the useful life of the structure has expired or other maintenance is needed. High-performance steel (HPS) has emerged as a material with enhanced weldability, weathering capabilities, and fracture toughness compared to conventional structural steels. In 2004, the Iowa Department of Transportation opened Iowa's first HPS girder bridge, the East 12th Street Bridge over I-235 in Des Moines, Iowa. The objective of this project was to evaluate HPS as a viable option for use in Iowa bridges with a continuous structural health monitoring (SHM) system. The scope of the project included documenting the construction of the East 12th Street Bridge and concurrently developing a remote, continuous SHM system using fiber-optic sensing technology to evaluate the structural performance of the bridge. The SHM system included bridge evaluation parameters, similar to design parameters used by bridge engineers, for evaluating the structure. Through the successful completion of this project, a baseline of bridge performance was established that can be used for continued long-term monitoring of the structure. In general, the structural performance of the HPS bridge exceeded the design parameters and is performing well. Although some problems were encountered with the SHM system, the system functions well and recommendations for improving the system have been made.
Resumo:
The Mechanistic-Empirical Pavement Design Guide (MEPDG) was developed under National Cooperative Highway Research Program (NCHRP) Project 1-37A as a novel mechanistic-empirical procedure for the analysis and design of pavements. The MEPDG was subsequently supported by AASHTO’s DARWin-ME and most recently marketed as AASHTOWare Pavement ME Design software as of February 2013. Although the core design process and computational engine have remained the same over the years, some enhancements to the pavement performance prediction models have been implemented along with other documented changes as the MEPDG transitioned to AASHTOWare Pavement ME Design software. Preliminary studies were carried out to determine possible differences between AASHTOWare Pavement ME Design, MEPDG (version 1.1), and DARWin-ME (version 1.1) performance predictions for new jointed plain concrete pavement (JPCP), new hot mix asphalt (HMA), and HMA over JPCP systems. Differences were indeed observed between the pavement performance predictions produced by these different software versions. Further investigation was needed to verify these differences and to evaluate whether identified local calibration factors from the latest MEPDG (version 1.1) were acceptable for use with the latest version (version 2.1.24) of AASHTOWare Pavement ME Design at the time this research was conducted. Therefore, the primary objective of this research was to examine AASHTOWare Pavement ME Design performance predictions using previously identified MEPDG calibration factors (through InTrans Project 11-401) and, if needed, refine the local calibration coefficients of AASHTOWare Pavement ME Design pavement performance predictions for Iowa pavement systems using linear and nonlinear optimization procedures. A total of 130 representative sections across Iowa consisting of JPCP, new HMA, and HMA over JPCP sections were used. The local calibration results of AASHTOWare Pavement ME Design are presented and compared with national and locally calibrated MEPDG models.
Bond Contribution to Whitetopping Performance on Low Volume Roads, Construction Report, HR-341, 1993
Resumo:
This research was initiated in 1991 as a part of a whitetopping project to study the effectiveness of various techniques to enhance bond strength between a new Portland cement concrete (PCC) overlay and an existing asphalt cement concrete (ACC) pavement surface. A 1,676 m (5,500 ft) section of county road R16 in Dallas County, Iowa was divided into 12 test sections. The various techniques used to enhance bond were power brooming, power brooming with air blast, milling, cement and water grout, and emulsion tack coat. As a part of these bonding techniques, two pavement thicknesses were placed; two different concrete proportions were used; and two sections were planed to a uniform cross-slope.
Resumo:
This project was undertaken to study the relationships between the performance of locally available asphalts and their physicochemical properties under Iowa conditions with the ultimate objective of development of a locally and performance-based asphalt specification for durable pavements. Physical and physicochemical tests were performed on three sets of asphalt samples including: (a) twelve samples from local asphalt suppliers and their TFOT residues, (b) six core samples of known service records, and (c) a total of 79 asphalts from 10 pavement projects including original, lab aged and recovered asphalts from field mixes, as well as from lab aged mixes. Tests included standard rheological tests, HP-GPC and TMA. Some specific viscoelastic tests (at 5 deg C) were run on b samples and on some a samples. DSC and X-ray diffraction studies were performed on a and b samples. Furthermore, NMR techniques were applied to some a, b and c samples. Efforts were made to identify physicochemical properties which are correlated to physical properties known to affect field performance. The significant physicochemical parameters were used as a basis for an improved performance-based trial specification for Iowa to ensure more durable pavements.
Resumo:
The Iowa road system has approximately 13,000 miles of Portland Cement Concrete Pavements, many of which are reaching the stage where major rehabilitation is required. Age, greater than anticipated traffic, heavier loads and deterioration related to coarse aggregate in the original pavement are some of the reasons that these pavements have reached this level of distress. One method utilized to rehabilitate distressed or underdesigned PCC pavements is the thin bonded Portland Cement Concrete overlay. Since the introduction of thin bonded overlays on highway pavements in 1973, the concrete paving industry has made progress in reducing the construction costs of this rehabilitation technique. With the advent of the shotblast machine, surface preparation costs have decreased from over $4.00 per square yard to most recently $1.42 per square yard. Other construction costs, including placement, grouting and sawing, have also declined. With each project, knowledge and efficiency have improved.
Resumo:
This article summarizes the main achievementsof the Multi-Element Transmit andReceive Antennas (METRA) Project, an ISTresearch and technological development project carried out between January 2000 and June 2001 by Universitat Politècnica de Catalunya, the Center for Personkommunikation of Aalborg University, Nokia Networks, Nokia Mobile Phones, and Vodafone Group Research and Development.The main objective of METRA was the performanceevaluation of multi-antenna terminals incombination with adaptive antennas at the basestation in UMTS communication systems. 1 AMIMO channel sounder was developed that providedrealistic multi-antenna channel measurements.Using these measured data, stochasticchannel models were developed and properly validated.These models were also evaluated inorder to estimate their corresponding channelcapacity. Different MIMO configurations andprocessing schemes were developed for both theFDD and TDD modes of UTRA, and their linkperformance was assessed. Performance evaluationwas completed by system simulations thatillustrated the benefits of MIMO configurationsto the network operator. Implementation cost vs.performance improvement was also covered bythe project, including the base station and terminalmanufacturer and network operator viewpoints.Finally, significant standards contributionswere generated by the project and presented to the pertinent 3GPP working groups.
Resumo:
Under the circumstances of the increasing market pressure, enterprises try to improve their competitive position by development efforts, and a business development project is one tool for that. There are not many answers to the question of how the development projects launched to improve the business performance in SMEs have succeeded. Theacademic interest in the business development project success has mainly focused on projects implemented in larger organisations rather than in SMEs. The previous studies on the business success of SMEs have mainly focused on new business ventures rather than on existing SMEs. However, nowadays a large number of business development projects are undertaken in existing SMEs, where they can pose a great challenge. This study focuses on business development success in SMEs thathave already established their business. The objective of the present study is to gain a deep understanding on business development project success in the SME-context and to identify the dimensions and factors affecting the project success. Further, the aim is to clarify how the business development projects implemented in SMEs have affected their performance. The empirical evidence is based on multiple case study. This study builds a framework for a generic theory of business development success in the SME-context, based on literature from the areas ofproject and change management, entrepreneurship and small business management, as well as performance measurement, and on empirical evidence from SMES. The framework consists of five success dimensions: entrepreneurial, project preparation, change management, project management and project success. The framework provides a systematic way for analysing the business development project and its impact on the performance and on the performing company. This case evidence indicates that successful business development projects have a balanced, high performance concerning all the dimensions. Good performance in one dimension is not enoughfor the project success, but it gives a good ground for the other dimensions. The other way round, poor performance in one success dimension affects the others, leading to poor performance of the project. In the SME-context the business development project success seems to be dependent on several interrelated dimensions and factors. Success in one area leads to success in other areas, and so creates an upward success spiral. Failure in one area seems to lead to failure in other areas, creating a downward failure spiral. The study indicates that the internal business development projects have affected the SMEs' performance widely also on areas and functions not initially targeted. The implications cover all thesuccess categories: the project efficiency, the impact on the customer, the business success and the future potentiality. With successful cases, the success tends to spread out to areas and functions not mentioned as the project goals, andwith unsuccessful cases the failure seems to spread out widely to the SMEs' other functions. This study also indicates that the most important key factors for successful business development project implementation are the strength of intention, business ability, knowledge, motivation and participation of the employees, as well as adequate and well-timed training provided to the employees.
Resumo:
Tutkielman tavoitteena on määritellä projektikontrolloinnin ja - riskijohtamisen roolit ja toiminnot saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tämä on kvalitatiivinen tutkielma, jossa käytetään voimakkaasti kuvailevia metodeita. Materiaali tutkimuksen empiiriseen osaan kerättiin kyselykaavakkeen avulla. Kyselykaavakkeiden tulokset käsiteltiin Microsoft Office Access- ohjelmalla ja analysoitiin Microsoft Office Excel- ohjelmalla ja Pivot table- työkalun avulla. Tutkimustulokset osoittavat, että asianmukaisessa projektikontrollointi- ja riskijohtamismetodien käytössä ja käyttötiheydessä esiintyy puutteita saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tehostamalla ja keskittymällä enemmän projektikontrollointi- ja riskijohtamismetodeihin ja prosesseihin sekä projektien että yritysten suorituskyky paranisi.
Resumo:
El principal objectiu d'aquest treball és implementar i exposar una descripció teòrica per a diferents esquemes de Physical Layer Network Coding. Utilitzant un esquema bàsic com a punt de partida, el projecte presenta la construcció i l'anàlisis de diferents esquemes de comunicació on la complexitat va augmentant a mesura que anem avançant en el projecte. El treball està estructurat en diferents parts: primer, es presenta una introducció a Physical Layer Network Coding i a Lattice Network Codes. A continuació, s'introdueixen les eines matemàtiques necessàries per entendre el CF System. Després, s'analitza i implementa el primer esquema bàsic. A partir del qual, implementem una versió vectorial del CF System i una versió codificada amb un Hamming q-ari. Finalment, s'estudien i implementen diferents estratègies per millorar la matriu de coeficients A.
Resumo:
The aim of this study is to present an Activity-Based Costing spreadsheet tool for analyzing the logistics costs. The tool can be used both by customer-companies and logistics service providers. The study discusses the influence of different activity models on costs. Additionally this paper discusses about the logistical performance across the total supply chain This study is carried out using ananalytical research approach and literature material has been used for supplementing the concerned research approach. Cost structure analysis was based on the theory of activity-based management. This study was outlined to spare part logistics in machine-shop industry. The outlines of logistics services and logisticalperformance discussed in this report are based on the new logistics business concept (LMS-concept), which has been presented earlier in the Valssi-project. Oneof the aims of this study is to increase awareness of different activity modelson logistics costs. The report paints an overall picture about the business environment and requirements for the new logistics concept.
Resumo:
The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.