975 resultados para Post-Disaster Housing Reconstruction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A range of authors from the risk management, crisis management, and crisis communications literature have proposed different models as a means of understanding components of crisis. A generic component of these sources has focused on preparedness practices before disturbance events and response practices during events. This paper provides a critical analysis of three key explanatory models of how crises escalate highlighting the strengths and limitations of each approach. The paper introduces an optimised conceptual model utilising components from the previous work under the four phases of pre-event, response, recovery, and post-event. Within these four phases, a ten step process is introduced that can enhance understanding of the progression of distinct stages of disturbance for different types of events. This crisis evolution framework is examined as a means to provide clarity and applicability to a range of infrastructure failure contexts and provide a path for further empirical investigation in this area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Jakarta, Indonesia’s chronic housing shortage poses multiple challenges for contemporary policy-makers. While it may be in the city’s interest to increase the availability of housing, there is limited land to do so. Market pressures, in tandem with government’s desire for housing availability, demand consideration of even marginal lands, such as those within floodplains, for development. Increasingly, planning for a flood resilient Jakarta is complicated by a number of factors, including: the city is highly urbanized and land use data is limited; flood management is technically complex, creating potential barriers to engagement for both decision-makers and the public; inherent uncertainty exists throughout modelling efforts, central to management; and risk and liability for infrastructure investments is unclear. These obstacles require localized watershed-level participatory planning to address risks of flooding where possible and reduce the likelihood that informal settlements occur in areas of extreme risk. This paper presents a preliminary scoping study for determination of an effective participatory planning method to encourage more resilient development. First, the scoping study provides background relevant to the challenges faced in planning for contemporary Jakarta. Second, the study examines the current use of decision-support tools, such as Geographic Information Systems (GIS), in planning for Jakarta. Existing capacity in the use of GIS allows for consideration of the use of an emerging method of community consultation - Multi-Criteria Decision-Making (MCDM) support systems infused with geospatial information - to aid in engagement with the public and improve decision-making outcomes. While these methods have been used in Australia to promote stakeholder engagement in urban intensification, the planned research will be an early introduction of the method to Indonesia. As a consequence of this intervention, it is expected that planning activities will result in a more resilient city, capable of engaging with disaster risk management in a more effective manner.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Early on Christmas morning 1974 Tropical Cyclone Tracy, a Category 4 storm, devastated the Northern Territory city of Darwin leaving only 6% of the city’s housing habitable. The extent of the disaster was largely the result of unregulated and poorly constructed buildings, predominantly housing. While the engineering and reconstruction process demonstrated a very successful response and adaptation to an existing and future risk, the impact of the cyclone of the local community and its Indigenous population in particular, had not been well recorded. NCCARF therefore commissioned a report on the Indigenous experience of Cyclone Tracy to document how Indigenous people were impacted by, responded to, and recovered from Cyclone Tracy in comparison to non-Indigenous groups. The report also considers the research literature on disasters and Indigenous people in the Northern Territory, with a specific focus on cyclones, and considers the socio-political context of Indigenous communities in Darwin prior to Cyclone Tracy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The introduction of Building Information Modelling (BIM) to the design, construction and operation of buildings is changing the way that the building construction industry works. BIM involves the development of a full 3D virtual model of a building which not only contains the 3D information necessary to show the building as it will appear, but also contains significant additional data about each component in the building. BIM represents both physical and virtual objects in a building. This includes the rooms and spaces within and around the building. The additional data stored on each part of the building can support building maintenance opera- tions and, more importantly from the perspective of this paper, support the generation and running of simula- tions of the operation of the building and behaviour of people within it under both normal and emergency scenarios. The initial discussion is around the use of BIM to support the design of resilient buildings which references the various codes and standards that define current best practice. The remainder of the discussion uses various recent events as the basis for discussion on how BIM could have been used to support rapid recovery and re- building.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Emergency sheltering is a temporary source of safety and support for people affected by disasters. People access emergency sheltering just prior to or soon after a disaster; therefore they are often scared, stressed, and/or experiencing loss/grief. The gathering of people in shelters also increases several environmental health risks. Therefore ensuring emergency shelters contain adequate facilities (permanent or temporary) and are well managed is essential in providing immediate support to disaster-affected communities and providing a level of assurance that the agencies involved are capable of supporting them through the recovery process. This paper will be presented by representatives of Australian Red Cross and Environmental Health Australia (Queensland), which both have an interest in emergency sheltering in Queensland. The paper will cover the development, content and application of the ‘Preferred Sheltering Practices for Emergency Sheltering in Australia’ and the roles of various organisations in relation to emergency sheltering. The importance of or- ganisational collaboration will also be discussed, with a focus on the experience of the two organisations fol- lowing the 2011 floods in Queensland and how they are collaborating to improve future operations in evacu- ation centres, which are a common form of emergency sheltering in Queensland. The organisations are con- tinuing to work together with the ultimate goal of improving services to disaster-affected communities and supporting such communities to start the recovery process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Jericho kimberlite (173.1. ±. 1.3. Ma) is a small (~. 130. ×. 70. m), multi-vent system that preserves products from deep (>. 1. km?) portions of kimberlite vents. Pit mapping, drill core examination, petrographic study, image analysis of olivine crystals (grain size distributions and shape studies), and compositional and mineralogical studies, are used to reconstruct processes from near-surface magma ascent to kimberlite emplacement and alteration. The Jericho kimberlite formed by multiple eruptions through an Archean granodiorite batholith that was overlain by mid-Devonian limestones ~. 1. km in thickness. Kimberlite magma ascended through granodiorite basement by dyke propagation but ascended through limestone, at least in part, by locally brecciating the host rocks. After the first explosive breakthrough to surface, vent deepening and widening occurred by the erosive forces of the waxing phase of the eruption, by gravitationally induced failures as portions of the vent margins slid into the vent and, in the deeper portions of the vent (>. 1. km), by scaling, as thin slabs burst from the walls into the vent. At currently exposed levels, coherent kimberlite (CK) dykes (<. 40. cm thick) are found to the north and south of the vent complex and represent the earliest preserved in-situ products of Jericho magmatism. Timing of CK emplacement on the eastern side of the vent complex is unclear; some thick CK (15-20. m) may have been emplaced after the central vent was formed. Explosive eruptive products are preserved in four partially overlapping vents that are roughly aligned along strike with the coherent kimberlite dyke. The volcaniclastic kimberlite (VK) facies are massive and poorly sorted, with matrix- to clast-supported textures. The VK facies fragmented by dry, volatile-driven processes and were emplaced by eruption column collapse back into the volcanic vents. The first explosive products, poorly preserved because of partial destruction by later eruptions, are found in the central-east vent and were formed by eruption column collapse after the vent was largely cleared of country rock debris. The next active vent was either the north or south vent. Collapse of the eruption column, linked to a vent widening episode, resulted in coeval avalanching of pipe margin walls into the north vent, forming interstratified lenses of country rock-rich boulder breccias in finer-grained volcaniclastic kimberlite. South vent kimberlite has similar characteristics to kimberlite of the north vent and likely formed by similar processes. The final eruptive phase formed olivine-rich and moderately sorted deposits of the central vent. Better sorting is attributed to recycling of kimberlite debris by multiple eruptions through the unconsolidated volcaniclastic pile and associated collapse events. Post-emplacement alteration varies in intensity, but in all cases, has overprinted the primary groundmass and matrix, in CK and VK, respectively. Erosion has since removed all limestone cover.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One could argue that the nature of our housing stock is a key determining factor in the ability of our citizens to manage risk, be resilient to various natural and human events, and to recover from these events. Recent research has been examining current challenges posed by our housing stock and exploring potential solutions from a range of perspectives. The aim of this paper is to discuss key findings from recent built environment research in Australia to initiate cross-sectorial discussion and debate about the implications and opportunities for other sectors such as emergency management and insurance. Three recent building research projects are discussed: - Heat waves The impact of heat waves on houses and occupants, and proposed changes to building regulations, air conditioning standards and building design, to reduce risks associated with heat waves. - Net zero energy homes Exploration of the potential benefits of a strategic optimization of building quality, energy and water efficiency, and household or community level distributed energy and water services for disaster management and recovery. - Building information Mapping of the flow of information about residential buildings, and the potential for national or regional building files (in a similar manner to personal medical records) to assist all parties to make more informed decisions that impact on housing sustainability and community resilience. The paper discusses how sustainability, environmental performance and resilience are inter-related, and can be supported by building files. It concludes with a call for increased cross-sectorial collaboration to explore opportunities for a whole-of-systems approach to our built environment that addresses a range of economic and environmental challenges as well as disaster and emergency management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tämä väitöskirja koostuu asuntomarkkinoiden taloustieteellistä analyysia esittelevästä johdantoluvusta ja kolmesta tutkimuksesta, joissa analysoidaan asuntomarkkinoihin vaikuttavia politiikkatoimenpiteitä. Luvussa 2 tutkitaan Suomen kiinteistöverojärjestelmän vaikutusta asuntorakentamiseen. Vuonna 2001 tehtiin uudistus, jonka myötä kunnat voivat verottaa rakentamatonta asuintonttia korkeammalla veroasteella kuin rakennettua tonttia. Maanomistajan rakentamispäätöksen teoreettisen mallin mukaan rakentamattoman tontin korotettu kiinteistöveron pitäisi nopeuttaa rakentamista, mutta toisaalta myös rakentamiseen investoitu rahamäärä saattaa muuttua. Asuintonttien kiinteistöverojen yleinen taso ei vaikuta maanomistajan käyttäytymiseen, sillä tontin verotusarvo ei riipu rakentamispäätöksestä. Vain rakentamattoman ja rakennetun tontin veroasteiden erolla on merkitystä. Empiiriset tulokset ovat sopusoinnussa teorian kanssa. Tulosten mukaan prosenttiyksikön nousu rakentamattoman ja rakennetun tontin veroasteiden erossa lisää omakotialoitusten määrää viidellä prosentilla lyhyellä aikavälillä. Luvussa 3 analysoidaan vuokrasääntelystä vuokralaisille aiheutuvia hyötyjä ja haittoja. Vuokrasäännellyissä asunnoissa asuvat kotitaloudet hyötyvät vuokrasääntelystä alhaisen vuokran muodossa. Heille saattaa kuitenkin koitua myös haittaa siitä, että toiveita vastaavan asunnon löytäminen on vuokrasääntelytilanteessa vaikeaa, koska vapaille asunnoille on suuri määrä ottajia. Vapaarahoitteisen vuokra-asuntokannan vuokrien sääntely purettiin Suomessa asteittain vuosina 1992–1995. Tutkimuksen empiiriset tulokset viittaavat siihen, että vuokrasääntelyn aiheuttamista suurista eroista halutun ja todellisen asuntokulutuksen välillä koituvat hyvinvointitappiot kumosivat merkittävän osan matalien vuokrien hyödyistä vuokralaisille. Luvussa 4 tutkitaan Suomen asumistukijärjestelmän kannustinvaikutuksia. Asumistuen määrää rajoittavat asunnon pinta-alalle ja neliövuokralle asetetut ylärajat. Neliövuokrarajoite voidaan tulkita asumisen laatua rajoittavana tekijänä. Tutkimuksen teoreettisessa osassa osoitetaan, että asumistukijärjestelmä luo vahvat kannustimet muuttaa asuntoihin, joissa pinta-ala- ja laaturajoitteet purevat. Empiiristen tulosten mukaan asumistukeen oikeutetut kotitaloudet eivät näytä reagoivan kannusteisiin. Tukeen oikeutettujen kotitalouksien asumisvalinnat suhteessa pinta-ala ja laaturajoitteisiin vastaavat muiden kotitalouksien valintoja ja asunnonvaihdon mahdollistama potentiaalinen asumistuen lisäys ei nosta muuttotodennäköisyyttä. Muuttamiseen liittyvät kustannukset ja vajavaiset tiedot tukijärjestelmästä saattavat selittää heikkoa reagointia asumistuen luomiin kannustimiin. Toinen mahdollinen selitys on asumistuen vajaakäyttö. Tutkimuksen mukaan vain 70–80 prosenttia asumistukeen oikeutetuista kotitalouksista nostaa tukea. Asumistuen hyödyntämisen todennäköisyys riippuu koulutustasosta, tuen määrästä ja tulo-odotuksista.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper by Carl Grodach demonstrates the careful unravelling of complexity, diversity, contestation and contradictions involved in the reconstruction of symbolic urban spaces after violent conflict, and the allied processes of cultural reinterpretation, political reconfiguration and material revaluation which accompany it. The paper analyses the reconstruction and redevelopment of the 16th-century historic centre of Mostar, Bosnia-Herzegovina, following the Bosnian Wars of 1992–1995. Reconstruction efforts centre around Stari Most, the 16th-century Ottoman bridge destroyed by Bosnian Croat military in 1993. In Mostar, both international and local organizations are in the process of reinterpreting Bosnia’s legacy of Ottoman city spaces. This research and analysis illuminates how such spaces can be central to contemporary projects to redefine group identities and conceptions of place. It provides insight into the ways various groups are attempting to reshape outside perceptions of the city—and Bosnia’s ethnic conflict—to articulate a new definition of local identity and ethnic relations and to remake a stable tourist economy through Mostar’s urban spaces.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The risk is obvious for soft tissue complications after operative treatment of the Achilles tendon, calcaneal bone or after ankle arthroplasty. Such complications after malleolar fractures are, however, seldom seen. The reason behind these complications is that the soft tissue in this region is tight and does not allow much tension to the wound area after surgery. Furthermore the area of operation may be damaged by swelling after the injury, or can be affected by peripheral vascular disease. While complications in this area are unavoidable, they can be diminished. This study attempts to highlight the possible predisposing factors leading to complications in these operations and on the other hand, to determine the solutions to solve soft tissue problems in this region. The study consists of five papers. The first article is a reprint on the soft tissue reconstruction of 25 patients after their complicated Achilles tendon surgeries were analysed. The second study reviews a series of 126 patients after having undergone an operative treatment of calcaneal bone fractures and analyses the complications and possible reasons behind them. The third part analyses a series of corrections of 35 soft tissue complications after calcaneal fracture operations. The fourth part reviews a series of 7 patients who had undergone complicated ankle arthroplasties. The last article presents a series of post operative lateral defects of the ankle treated with a less frequently used distally based peroneus brevis muscle flap and analyses the results. What can be conducted from these studies is that in general, the results after the correction of even severe soft tissue complications in the ankle region are good. For the small defects around the Achilles tendon, the local flaps are useful, but the larger defects are best treated with a free flap. We found that a long delay from trauma to surgery and a long operating time were predisposing factors that lead to soft tissue complications after operatively treated calcaneal bone fractures. The more severe the injury, the greater the risk for wound complication. Surprisingly, the long-term results after infected calcaneal osteosyntheses were acceptable and the calcaneal bone seems to tolerate chronic infections very well if the soft tissue is reconstructed successfully. Behind the complicated ankle arthroplasties, unexpectedly high number of cases experiencing arteriosclerosis of the lower extremity was found. These complications lead to ankle fusion but can be solved with a free flap if the vascularity is intact or can be reconstructed. For this reason a vascular examination of the lower extremity arteries of the patients going to ankle arthroplasty is strongly recommended. Moreover postoperative lateral malleolar wound infections which typically create lateral ankle defects can successfully be treated with a peroneus brevis muscle flap covered with a free skin graft.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper uses original survey data of the Great East Japan earthquake disaster victims to examine their decision to apply for the temporary housing as well as the timing of application. We assess the effects of victims’ attachment to their locality as well as variation in victims’ information seeking behavior. We additionally consider various factors such as income, age, employment and family structure that are generally considered to affect the decision to choose temporary housing as victims’ solution for their displacement. Empirical results indicate that, ceteris paribus, as the degree of attachment increases, victims are more likely to apply for the temporary housing but attachment does not affect the timing of application. On the other hand, the victims who actively seek information and are able to collect higher quality information are less likely to apply for the temporary housing and if they do apply then they apply relatively later.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper we propose a postprocessing technique for a spectrogram diffusion based harmonic/percussion decom- position algorithm. The proposed technique removes har- monic instrument leakages in the percussion enhanced out- puts of the baseline algorithm. The technique uses median filtering and an adaptive detection of percussive segments in subbands followed by piecewise signal reconstruction using envelope properties to ensure that percussion is enhanced while harmonic leakages are suppressed. A new binary mask is created for the percussion signal which upon applying on the original signal improves harmonic versus percussion separation. We compare our algorithm with two recent techniques and show that on a database of polyphonic Indian music, the postprocessing algorithm improves the harmonic versus percussion decomposition significantly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Camera motion estimation is one of the most significant steps for structure-from-motion (SFM) with a monocular camera. The normalized 8-point, the 7-point, and the 5-point algorithms are normally adopted to perform the estimation, each of which has distinct performance characteristics. Given unique needs and challenges associated to civil infrastructure SFM scenarios, selection of the proper algorithm directly impacts the structure reconstruction results. In this paper, a comparison study of the aforementioned algorithms is conducted to identify the most suitable algorithm, in terms of accuracy and reliability, for reconstructing civil infrastructure. The free variables tested are baseline, depth, and motion. A concrete girder bridge was selected as the "test-bed" to reconstruct using an off-the-shelf camera capturing imagery from all possible positions that maximally the bridge's features and geometry. The feature points in the images were extracted and matched via the SURF descriptor. Finally, camera motions are estimated based on the corresponding image points by applying the aforementioned algorithms, and the results evaluated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

National Key Technology R&D Program of China [2008BAK50B05]; Chinese Academy of Sciences [KZCX-YW-Q06, KZCX2-YW-Q03-06]