944 resultados para Personal Satisfaction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project focused group work is significant in developing social and personal skills as well as extending the ability to identify, formulate and solve engineering problems. As a result of increasing undergraduate class sizes, along with the requirement for many students to work part-time, group projects, peer and collaborative learning are seen as a fundamental part of engineering education. Group formation, connection to learning objectives and fairness of assessment has been widely reported as major issues that leave students dissatisfied with group project based units. Several strategies were trialled including a study of formation of groups by different methods across two engineering disciplines over the past 2 years. Other strategies involved a more structured approach to assessment practices of civil and electrical engineering disciplines design units. A confidential online teamwork management tool was used to collect and collate student self and peer assessment ratings and used for both formative feedback as well as assessment purposes. Student satisfaction and overall academic results in these subjects have improved since the introduction of these interventions. Both student and staff feedback highlight this approach as enhancing student engagement and satisfaction, improved student understanding of group roles, reducing number of dysfunctional groups whilst requiring less commitment of academic resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian tourism tertiary education sector operates in a competitive and dynamic environment, which necessitates a market orientation to be successful. Academic staff and management in the sector must regularly assess the perceptions of prospective and current students and monitor the satisfaction levels of current students. This study is concerned with the setting and monitoring of satisfaction levels of current students, reporting the results of three longitudinal investigations of student satisfaction in a postgraduate unit. The study also addresses a limitation of a university’s generic teaching evaluation instrument. Importance-Performance Analysis (IPA) has been recommended as a simple but effective tool for overcoming the deficiencies of many student evaluation studies, which have generally measured only attribute performance at the end of a semester. IPA was used to compare student expectations of the unit at the beginning of a semester with their perceptions of performance 10 weeks later. The first stage documented key benchmarks for which amendments to the unit based on student feedback could be evaluated during subsequent teaching periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study investigated personal and social processes of adjustment at different stages of illness for individuals with brain tumour. A purposive sample of 18 participants with mixed tumour types (9 benign and 9 malignant) and 15 family caregivers was recruited from a neurosurgical practice and a brain tumour support service. In-depth semi-structured interviews focused on participants’ perceptions of their adjustment, including personal appraisals, coping and social support since their brain tumour diagnosis. Interview transcripts were analysed thematically using open, axial and selective coding techniques. The primary theme that emerged from the analysis entailed “key sense making appraisals”, which was closely related to the following secondary themes: (1) Interactions with those in the healthcare system, (2) reactions and support from the personal support network, and (3) a diversity of coping efforts. Adjustment to brain tumour involved a series of appraisals about the illness that were influenced by interactions with those in the healthcare system, reactions and support from people in their support network, and personal coping efforts. Overall, the findings indicate that adjustment to brain tumour is highly individualistic; however, some common personal and social processes are evident in how people make sense of and adapt to the illness over time. A preliminary framework of adjustment based on the present findings and its clinical relevance are discussed. In particular, it is important for health professionals to seek to understand and support individuals’ sense-making processes following diagnosis of brain tumour.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study explored youth caregiving for a parent with multiple sclerosis (MS) from multiple perspectives, and examined associations between caregiving and child negative (behavioural emotional difficulties, somatisation) and positive (life satisfaction, positive affect, prosocial behaviour) adjustment outcomes overtime. A total of 88 families participated; 85 parents with MS, 55 partners and 130 children completed questionnaires at Time 1. Child caregiving was assessed by the Youth Activities of Caregiving Scale (YACS). Child and parent questionnaire data were collected at Time 1 and child data were collected 12 months later (Time 2). Factor analysis of the child and parent YACS data replicated the four factors (instrumental, social-emotional, personal-intimate, domestic-household care), all of which were psychometrically sound. The YACS factors were related to parental illness and caregiving context variables that reflected increased caregiving demands. The Time 1 instrumental and social-emotional care domains were associated with poorer Time 2 adjustment, whereas personal-intimate was related to better adjustment and domestic-household care was unrelated to adjustment. Children and their parents exhibited highest agreement on personal-intimate, instrumental and total caregiving, and least on domestic-household and social-emotional care. Findings delineate the key dimensions of young caregiving in MS and the differential links between caregiving activities and youth adjustment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As governments around the world adopt a marketing orientation, the importance of consumer satisfaction to the effectiveness of the organization is being recognized. While some investigation of satisfaction with a government agencies' service has occurred, there is little examination of satisfaction with a government agency that acts as a third-party on the behalf of consumers to gain marketplace redress. Given the number of third-party complaints is increasing as a result of internet access to complaint channels, this research is a timely investigation. This study reports the findings of a survey of 454 complainants to an Australian Government agency: the Office of Fair Trading (OFT). The findings show that satisfaction with the service was subjectively experienced, based around individual expectations of the redress and satisfaction levels were higher when the redress sought was financial compared with non-financial forms of redress such as apology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Comparison are required to understand transport benefits of Transit Oriented Developments (TODs). Mode shares of TOD users need to be understood. Accurate travel demand models for TODs are needed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an environment where economic, political and technological change is the rule, a fundamental business strategy should be the defence of traditional markets and thoughtful entry into new markets, with an aim to increase market penetration and stimulate profit. The success of such a strategy will depend on the success of firms to do more and better for customers than their competitors. In other words, the firm’s primary competitive advantage will come from changes they implement to please their customers. In the construction industry, complexity of technical knowledge and construction processes have traditionally encouraged clients to play a largely passive role in the management of their project. However, today’s clients not only want to know about internal efficiency of their projects but also need to know how they and their contractors compare and compete against their competitors. Given the vulnerability of construction activities in the face of regional financial crisis, constructors need to be proactive in the search to improve their internal firm and project processes to ensure profitability and market responsiveness. In this context, reengineering is a radical design that emphasises customer satisfaction rather than cost reduction This paper discusses the crucial role of the client-project interface and how project networks could facilitate and improve information dissemination and sharing, collaborative efforts, decision-making and improved project climate. An intra-project network model is presented, and project managers’ roles and competencies in forming and coordinating project workgroups is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes and analyses the procurement processes employed in delivering the Sydney Olympic Stadium – arguably the most significant stadia project in the region today. This current high profile project is discussed in terms of a case study into the procurement processes used. Interviews, personal site visits and questionnaires were used to obtain information on the procurement processes used and comments on their application to the project. The alternative procurement process used on this project—Design and Construction within a Build, Own, Operate and Transfer (BOOT) project—is likely to impact on the construction industry as a whole. Already other projects and sectors are following this lead. Based on a series of on-site interviews and questionnaires, a series of benefits and drawbacks to this procurement strategy are provided.The Olympic Stadium project has also been further analysed during construction through a Degree of Interaction framework to determine anticipated project success. This analysis investigates project interaction and user satisfaction to provide a comparable rating. A series of questionnaires were used to collect data to calculate the Degree of Interaction and User Satisfaction ratings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transit Oriented Developments (TODs) are often designed to promote the use of sustainable modes of transport and reduce car usage. This paper investigates the effect of personal and transit characteristics on travel choices of TOD users. Binary logistic regression models were developed to determine the probability of choosing sustainable modes of transport including walking, cycling and public transport. Kelvin Grove Urban Village (KGUV) located in Brisbane, Australia was chosen as case study TOD. The modal splits for employees, students, shoppers and residents showed that 47% of employees, 84% of students, 71% of shoppers and 56% of residents used sustainable modes of transport.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The project is working towards building an understanding of the personal interests and experiences of children with the aim of designing appropriate, usable and, most importantly, inspirational educational technology. kidprobe, an adaptation of the technology probe concept, has been used as a lightweight method of gaining contextual information about children's interactions with 'fun' technology. kidprobe has produced design inspiration which focuses primarily on the social and emotional connections children made. The use of kidprobe has generated some important ideas for improving the use of probes with children. It is an important first step in understanding how to effectively adapt probing techniques to inspire the design of technology for children.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While there have been improvements in Australian engineering education since the 1990s, there are still strong concerns that more progress needs to be made, particularly in the areas of developing graduate competencies and in outcomes-based curricula. This paper comments on the findings from a two-day Australian Learning and Teaching Council funded forum that sought to establish a shared understanding with the thee stakeholders (students, academics and industry) about how to achieve a design-based engineering curriculum. This paper reports on the findings from the first day’s activities, and reveals that there is a shared desire for design and project-based curricula that would encourage the development of the “three-dimensional” graduate: one who has technical, personal, and professional and systems-thinking/design-based competence. In addition, the data also reveal industry willingness to engage in the engineering curriculum to enhance authentic learning experiences.