932 resultados para Construction Engineering
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
Financial innovations have emerged globally to close the gap between the rising global demand for infrastructures and the availability of financing sources offered by traditional financing mechanisms such as fuel taxation, tax-exempt bonds, and federal and state funds. The key to sustainable innovative financing mechanisms is effective policymaking. This paper discusses the theoretical framework of a research study whose objective is to structurally and systemically assess financial innovations in global infrastructures. The research aims to create analysis frameworks, taxonomies and constructs, and simulation models pertaining to the dynamics of the innovation process to be used in policy analysis. Structural assessment of innovative financing focuses on the typologies and loci of innovations and evaluates the performance of different types of innovative financing mechanisms. Systemic analysis of innovative financing explores the determinants of the innovation process using the System of Innovation approach. The final deliverables of the research include propositions pertaining to the constituents of System of Innovation for infrastructure finance which include the players, institutions, activities, and networks. These static constructs are used to develop a hybrid Agent-Based/System Dynamics simulation model to derive propositions regarding the emergent dynamics of the system. The initial outcomes of the research study are presented in this paper and include: (a) an archetype for mapping innovative financing mechanisms, (b) a System of Systems-based analysis framework to identify the dimensions of Systems of Innovation analyses, and (c) initial observations regarding the players, institutions, activities, and networks of the System of Innovation in the context of the U.S. transportation infrastructure financing.
Resumo:
Trenchless methods have been considered to be a viable solution for pipeline projects in urban areas. Their applicability in pipeline projects is expected to increase with the rapid advancements in technology and emerging concerns regarding social costs related to trenching methods. Selecting appropriate project delivery system (PDS) is a key to the success of trenchless projects. To ensure success of the project, the selected project delivery should be tailored to trenchless project specific characteristics and owner needs, since the effectiveness of project delivery systems differs based on different project characteristics and owners requirements. Since different trenchless methods have specific characteristics such rate of installation, lengths of installation, and accuracy, the same project delivery systems may not be equally effective for different methods. The intent of this paper is to evaluate the appropriateness of different PDS for different trenchless methods. PDS are examined through a structured decision-making process called Fuzzy Delivery System Selection Model (FDSSM). The process of incorporating the impacts of: (a) the characteristics of trenchless projects and (b) owners’ needs in the FDSSM is performed by collecting data using questionnaires deployed to professionals involved in the trenchless industry in order to determine the importance of delivery systems selection attributes for different trenchless methods, and then analyzing this data. The sensitivity of PDS rankings with respect to trenchless methods is considered in order to evaluate whether similar project delivery systems are equally effective in different trenchless methods. The effectiveness of PDS with respect to attributes is defined as follows: a project delivery system is most effective with respect to an attribute (e.g., ability to control growth in costs ) if there is no project delivery system that is more effective than that PDS. The results of this study may assist trenchless project owners to select the appropriate PDS for the trenchless method selected.
Resumo:
Infrastructure systems are drivers of the economy in the nation. A dollar spent on infrastructure development yields roughly double the initial spending in ultimate economic output in the short term; and over a twenty-year period, and generalized ‘public investment’ produces an aggregated $3.21 of economic activity per $1.00 spent [1]. Thus, formulation of policies pertaining to infrastructure investment and development is of significance affecting the social and economic wellbeing of the nation. The aim of this policy brief is to evaluate innovative financing in infrastructure systems from two different perspectives: (1) through consideration of the current condition of infrastructure in the U.S., the current trends in public spending, and the emerging innovative financing tools; (2) through evaluation of the roles and interactions of different agencies in the creation and the diffusion of innovative financing tools. Then using the example of transportation financing, the policy brief provides an assessment of policy landscapes which could lead to the closure of infrastructure financing gap in the U.S and proposes strategies for citizen involvement to gain public support of innovative financing.
Resumo:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
The hypothesis that the same educational objective, raised as cooperative or collaborative learning in university teaching does not affect students’ perceptions of the learning model, leads this study. It analyses the reflections of two students groups of engineering that shared the same educational goals implemented through two different methodological active learning strategies: Simulation as cooperative learning strategy and Problem-based Learning as a collaborative one. The different number of participants per group (eighty-five and sixty-five, respectively) as well as the use of two active learning strategies, either collaborative or cooperative, did not show differences in the results from a qualitative perspective.
Resumo:
Final Report
Resumo:
O presente trabalho, no âmbito de projeto final de curso de metrado em Engenharia da Construção, teve como objetivo o estudo do comportamento de estruturas de suporte de terras flexíveis multi-apoiadas (com diferentes tipos de apoio) para dois tipos solos homogéneos. Recorreu-se às teorias clássicas, como a de Rankine, desenvolvidas para estruturas de suporte de terras rígidas. Às teorias semi-empíricas de Terzaghi & Peck que culminaram nos diagramas de Terzaghi & Peck. Apesar de os digramas de Terzaghi & Peck serem diagramas de pressões de terras a usar em estruturas de suporte de terras flexíveis, apresentam algumas limitações importantes, como a sua aplicação apenas em solos heterogéneos, com presença ou não de níveis freáticos, e sem fornecer distribuição das pressões de terras na zona passiva (zona enterrada). Como na atualidade os modelos de elementos finitos permitem simular de modo muito mais rigoroso os problemas da engenharia. O presente trabalho esteve focado em analisar um caso prático em diferentes solos e com diferentes tipos de apoios. Será estudado mediante os métodos analíticos usando as teorias clássicas e posteriormente métodos numéricos (com diferentes programas de cálculo). Finalmente serão comparados os resultados obtidos mediante os diferentes métodos usados. As estruturas foram inicialmente pré-dimensionadas usando os métodos clássicos. Assim foram usados os diagramas de pressões de terras de Terzaghi & Peck para a zona ativa (zona em escavação) e a teoria de Rankine para conhecer as pressões de terras na zona enterrada da cortina (parede moldada) e recorrendo ao software Ftool para a obtenção dos parâmetros de dimensionamento de estruturas de suporte de terras objeto de estudo. Posteriormente utilizaram-se os programas de cálculo automático CYPE 2015 k, e o programa de cálculo de elementos finitos PLAXIS Introductory 2010. Estes programas permitem simular o faseamento construtivo do muro. Para estudar a influência de algúns parâmetros no comportamento da Resumo IV cortina o estudo foi realizado com dois solos distintos, um solo argiloso mole e um solo arenoso denso. Assim como para dois tipos de apoios distintos, ancoragens ativas e escoras passivas. Foram analisados diferentes parâmetros na estrutura de suporte; pressões horizontais das terras, deslocamentos horizontais, esforço axial, transverso e momento fletor.
Resumo:
Part 14: Interoperability and Integration
Resumo:
Este trabajo tiene como propósito determinar los factores de motivación en los trabajadores de la industria de la construcción en Colombia, tomando como muestra una población de empleados de la ciudad de Pasto, Colombia. Inicialmente se revisaron artículos científicos de diversos países que estudian los efectos de factores motivadores, desmotivadores, características intrínsecas y extrínsecas, relacionados con el rendimiento laboral. De esta forma se identificaron los factores que conforman la base del instrumento “Study Of Motivators And Demotivators Affecting The Performance Of Employees In The Construction Industry–Questionare” entregado a 190 empleados. Los resultados fueron clasificados, mediante un software estadístico SPSS.
Resumo:
With an increasing level of collaboration amongst researchers, software developers and industry practitioners in the past three decades, building information modelling (BIM) is now recognized as an emerging technological and procedural shift within the architect, engineering and construction (AEC) industry. BIM is not only considered as a way to make a profound impact on the professions of AEC, but is also regarded as an approach to assist the industry to develop new ways of thinking and practice. Despite the widespread development and recognition of BIM, a succinct and systematic review of the existing BIM research and achievement is scarce. It is also necessary to take stock on existing applications and have a fresh look at where BIM should be heading and how it can benefit from the advances being made. This paper first presents a review of BIM research and achievement in AEC industry. A number of suggestions are then made for future research in BIM. This paper maintains that the value of BIM during design and construction phases is well documented over the last decade, and new research needs to expand the level of development and analysis from design/build stage to postconstruction and facility asset management. New research in BIM could also move beyond the traditional building type to managing the broader range of facilities and built assets and providing preventative maintenance schedules for sustainable and intelligent buildings