991 resultados para cooperative level crossings
Resumo:
The early stages of the building design process are when the most far reaching decisions are made regarding the configuration of the proposed project. This paper examines methods of providing decision support to building designers across multiple disciplines during the early stage of design. The level of detail supported is at the massing study stage where the basic envelope of the project is being defined. The block outlines on the building envelope are sliced into floors. Within a floor the only spatial divisions supported are the “user” space and the building core. The building core includes vertical transportation systems, emergency egress and vertical duct runs. The current focus of the project described in the paper is multi-storey mixed use office/residential buildings with car parking. This is a common type of building in redevelopment projects within and adjacent to the central business districts of major Australian cities. The key design parameters for system selection across the major systems in multi-storey building projects - architectural, structural, HVAC, vertical transportation, electrical distribution, fire protection, hydraulics and cost – are examined. These have been identified through literature research and discussions with building designers from various disciplines. This information is being encoded in decision support tools. The decision support tools communicate through a shared database to ensure that the relevant information is shared across all of the disciplines. An internal data model has been developed to support the very early design phase and the high level system descriptions required. A mapping to IFC 2x2 has also been defined to ensure that this early information is available at later stages of the design process.
Resumo:
Supply chain management and knowledge management have emerged as two distinct business philosophies in the last decade. Both are making rapid inroads into the construction industry. The premise of this paper is that knowledge management would make it possible for all the trading partners in a supply chain to reap benefits. Current research in knowledge management in the construction industry is generally targeting those big organisations that are main contractors. This has restricted the scope of knowledge management, and limits the benefits to a few, rather than the whole industry. If the construction industry as a whole is to prosper and improve its productivity, strategies for knowledge management strategy at the industry level must be established. This paper argues the case for extending the scope of knowledge management across the full extent of the supply chain, and attempts to identify the benefits that may arise out of sharing knowledge across the supply chain.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
The Guide contains the distilled findings from a major, two-year research project to explore those factors considered by industry practitioners to be critical to the successful adoption of ICT, both within their firms and between their firms and their trading partners. In the context of this project Critical Success Factors (CSFs) have been defined as, “Those things that absolutely, positively must be attended to in order to maximise the likelihood of a successful outcome for the stakeholder, defined in the stakeholder’s terms.” The guide includes: o Perceived benefits of ICT use across the head contractors’ sector o Types and levels of ICT used across the sector o Self-assessment tool o CSFs for high-level ICT users, including o Best Practice Profiles o Action Statements The material contained in this Guide has been generated following a number of principles: o For a given situation there is not a single ‘right answer’, but a number of solutions that have to be evaluated using a range of relevant factors. o Since there are as many solutions as there are ‘solvers’, factors for evaluation will ‘emerge’ from collective wisdom.
Resumo:
The Guide contains the distilled findings from a major, two-year research project to explore those factors considered by industry practitioners to be critical to the successful adoption of ICT, both within their firms and between their firms and their trading partners. In the context of this project Critical Success Factors (CSFs) have been defined as, “Those things that absolutely, positively must be attended to in order to maximise the likelihood of a successful outcome for the stakeholder, defined in the stakeholder’s terms.” The guide includes: o Perceived benefits of ICT use across the consultants’ sector o Types and levels of ICT used across the sector o Self-assessment tool o CSFs for medium- and high-level ICT users, including o Best Practice Profiles o Action Statements o Barriers to ICT use for low-level users o Action Statements The material contained in this Guide has been generated following a number of principles: o For a given situation there is not a single ‘right answer’, but a number of solutions that have to be evaluated using a range of relevant factors. o As there are as many solutions as there are ‘solvers’, factors for evaluation will ‘emerge’ from collective wisdom.
Resumo:
The Guide contains the distilled findings from a major, two-year research project to explore those factors considered by industry practitioners to be critical to the successful adoption of ICT, both within their firms and between their firms and their trading partners. In the context of this project Critical Success Factors (CSFs) have been defined as, “Those things that absolutely, positively must be attended to in order to maximise the likelihood of a successful outcome for the stakeholder, defined in the stakeholder’s terms.” The guide includes: o Perceived benefits of ICT use across the head contractors’ sector o Types and levels of ICT used across the sector o Self-assessment tool o CSFs for medium- and high-level ICT users, including o Best Practice Profiles o Action Statements The material contained in this Guide has been generated following a number of principles: o For a given situation there is not a single ‘right answer’, but a number of solutions that have to be evaluated using a range of relevant factors. o Since there are as many solutions as there are ‘solvers’, factors for evaluation will ‘emerge’ from collective wisdom.
Resumo:
The Guide contains the distilled findings from a major, two-year research project to explore those factors considered by industry practitioners to be critical to the successful adoption of ICT, both within their firms and between their firms and their trading partners. In the context of this project Critical Success Factors (CSFs) have been defined as, “Those things that absolutely, positively must be attended to in order to maximise the likelihood of a successful outcome for the stakeholder, defined in the stakeholder’s terms.” The guide includes: o Perceived benefits of ICT use across the subcontractors’ sector o Types and levels of ICT used across the sector o Self-assessment tool o CSFs for medium- and high-level ICT users, including o Best Practice Profiles o Action Statements o Barriers to ICT use for low-level users o Action Statements The material contained in this Guide has been generated following a number of principles: o For a given situation there is not a single ‘right answer’, but a number of solutions that have to be evaluated using a range of relevant factors. o As there are as many solutions as there are ‘solvers’, factors for evaluation will ‘emerge’ from collective wisdom.
Resumo:
The Cooperative Research Centre for Construction Innovation1 (hereafter called Construction Innovation) supports the notion of the establishment of a Sustainability Charter for Australia and is interested in working collaboratively to achieve this outcome. A number of challenges need to be addressed to develop this Charter. This submission outlines these challenges and possible responses to them by a Sustainability Commission.
Resumo:
Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.
Resumo:
This thesis is a documented energy audit and long term study of energy and water reduction in a ghee factory. Global production of ghee exceeds 4 million tonnes annually. The factory in this study refines dairy products by non-traditional centrifugal separation and produces 99.9% pure, canned, crystallised Anhydrous Milk Fat (Ghee). Ghee is traditionally made by batch processing methods. The traditional method is less efficient, than centrifugal separation. An in depth systematic investigation was conducted of each item of major equipment including; ammonia refrigeration, a steam boiler, canning equipment, pumps, heat exchangers and compressed air were all fine-tuned. Continuous monitoring of electrical usage showed that not every initiative worked, others had pay back periods of less than a year. In 1994-95 energy consumption was 6,582GJ and in 2003-04 it was 5,552GJ down 16% for a similar output. A significant reduction in water usage was achieved by reducing the airflow in the refrigeration evaporative condensers to match the refrigeration load. Water usage has fallen 68% from18ML in 1994-95 to 5.78ML in 2003-04. The methods reported in this thesis could be applied to other industries, which have similar equipment, and other ghee manufacturers.
Resumo:
This paper discusses the issues with sharing information between different disciplines in collaborative projects. The focus is on the information itself rather than the wider issues of collaboration. A range of projects carried out by the Cooperative Research Centre for Construction Innovation (CRC CI) in Australia is used to illustrate the issues.
Resumo:
There has been increased research interest in Co-operative Vehicle Infrastructure Systems (CVIS) from the eld of Intelligent Transport Systems (ITS). However most of the research have focused on the engineering aspects and overlooked their relevance to the drivers' behaviour. This paper argues that the priority for cooperative systems is the need to improve drivers decision making and reduce drivers' crash risk exposure to improve road safety. Therefore any engineering solutions need to be considered in conjuction with traffic psychology theories on driver behaviour. This paper explores the advantages and limitations of existing systems and emphasizes various theoretical issues that arise in articulating cooperative systems' capabilities and drivers' behaviour.
Resumo:
Image annotation is a significant step towards semantic based image retrieval. Ontology is a popular approach for semantic representation and has been intensively studied for multimedia analysis. However, relations among concepts are seldom used to extract higher-level semantics. Moreover, the ontology inference is often crisp. This paper aims to enable sophisticated semantic querying of images, and thus contributes to 1) an ontology framework to contain both visual and contextual knowledge, and 2) a probabilistic inference approach to reason the high-level concepts based on different sources of information. The experiment on a natural scene database from LabelMe database shows encouraging results.
Resumo:
To date, automatic recognition of semantic information such as salient objects and mid-level concepts from images is a challenging task. Since real-world objects tend to exist in a context within their environment, the computer vision researchers have increasingly incorporated contextual information for improving object recognition. In this paper, we present a method to build a visual contextual ontology from salient objects descriptions for image annotation. The ontologies include not only partOf/kindOf relations, but also spatial and co-occurrence relations. A two-step image annotation algorithm is also proposed based on ontology relations and probabilistic inference. Different from most of the existing work, we specially exploit how to combine representation of ontology, contextual knowledge and probabilistic inference. The experiments show that image annotation results are improved in the LabelMe dataset.
Resumo:
Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal