920 resultados para Project Management Office (PMO)
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics
Resumo:
Mode of access: Internet.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
Tutkimus keskittyy hankintatoimen kehittämiseen osana laitosprojektien toteutusta. Työ pohjautuu empiiriseltä taustaltaan Pöyry Oyj:n projektiliiketoimintaan ja työn tarkastelunäkökulmaksi onvalittu projektihallinnosta vastaavan yrityksen näkökulma. Tutkimus on hyvin käytännönläheinen ¿ se lähtee hankinnan ja sen seurannan ongelmista ja pyrkii tarjoamaan niihin uudenlaisia ratkaisuja. Pohjimmiltaan tutkimus kuuluu teollisuustalouden piiriin, vaikka tietojärjestelmätieteellä on vahva tukirooli. Työn tavoitteet ja tulokset liittyvät teollisuustaloudelle ominaisesti yrityksen toiminnan kehittämiseen, käytetyt välineet ja ratkaisut puolestaan hyödyntävät tietojärjestelmätieteen antamia mahdollisuuksia. Tutkimuksessa on käytetty konstruktiivista tutkimusotetta, jonka mukaisesti on luotu innovatiivisia konstruktioita ratkaisemaan aitoja reaalimaailman ongelmia ja tätä kautta tuotettu kontribuutioita teollisuustaloudelle. Tavoitteena oli järjestää hankintatoimi ja sen seuranta suurissa laitosprojekteissa tehokkaammin. Tätä varten uudistettiin ensin projektihallinnon ja hankintatoimen toimintaohjeet vastaamaan paremmin nykyajan vaatimuksia. Toimintaohjeiden perusteella ryhdyttiin toteuttamaan hankintaohjelmistoa, joka pystyisi kattamaan kaikki toimintaohjeissa kuvatut piirteet. Lopulta hankintaohjelmisto toi mukanaan uusia piirteitä projektihallintoon ja hankintatoimeen ja nämä sisällytettiin toimintaohjeisiin. Tähän kehitystyöhön ryhdyttiin, jotta laitosprojektien projektihallinto ja hankintatoimi toimisivat paremmin, eli pienemmin kustannuksin tuottaen projekteissa tarvittavat tulokset nopeammin, tarkemmin ja laadukkaammin. Tutkimuksella on kolmenlaisia tuloksia: hankintatoimen parannetut metodit, hankintaohjelmiston pohjana olevat toiminta- ja laskentamallit sekä implementaationa hankintasovellus. Uudistetut projekti- ja hankintaohjeet kuvaavat hankintatoiminnan parannettuja metodeja. Hankintaohjelmistoasuunnitellessa ja kehitettäessä tehdyt kuvaukset sisältävät uusia malleja niin hankintaprosessille kuin hankinnan seuraamiseksi suurissa laitosprojekteissa. Itse ohjelmisto on tuloksena implementaatio, joka perustuu parannettuihin hankintametodeihin ja uusiin toiminta- ja laskentamalleihin. Uudistetut projekti- ja hankintaohjeet ovat olleet käytössä Pöyry Oyj:ssä vuodesta 1991. Vuosien varrella nämä toimintaohjeet ovat auttaneet ja tukeneet satojen laitosprojektientoteutusta ja ylläpitäneet Pöyry Oyj:n kilpailukykyä kansainvälisenä projektitalona. Hankintasovellus puolestaan on ollut käytössä useissa projekteissa ja sen on havaittu pienentävän hankintatoimen suoria työkustannuksia laitosprojekteissa. Sovelluksen katsotaan myös tuovan epäsuoria kustannussäästöjä parempien hankintapäätösten muodossa, mutta näiden säästöjen suuruutta ei pystytä luotettavasti arvioimaan.
Resumo:
The main aim of this study was to develop the project management framework model which would serve as the new model to follow for upcoming projects at the Lappeenranta cement plant. The other goal was to execute the SNCR (selective non catalytic reduction) project successfully so that the nitrogen oxides emissions are below the stated emission limit when the new emission limit comes into effect beginning in July, 2008. Nitrogen oxides, project management aspects, SNCR and the invested system are explained in the theory part. In the practical part of the study, the SNCR project in the Lappeenranta cement plant was executed and the findings were documented. In order to reach the aim of this study, a framework of project management was made. The framework is based on the executed SNCR project, previous projects in the cement plant and on the available literature relating to the subject matter. The developed project turned out to be successful.
Resumo:
Project management has evolved in recent decades. Project portfolio management, together with multi project management, is an emerging area in the project management field in practice, and correspondingly in academic research and forums. In multi project management, projects cannot be handled isolated from each other, as they often have interdependencies that have to be taken into account. If the interdependencies between projects are evaluated during the selection process, the success rate of the project portfolio is increased. Interdependencies can be human resources, technological, and/or market based. Despite of the fact that interdependency as a phenomenon has roots in the 1960s and is related to famous management theories, it has not been much studied, although in practice most companies use it to great extent. There exists some research on interdependency, but prior publications have not emphasized the phenomenon per se, because a practical orientation practitioner techniques prevails in the literature. This research applies the method triangulation, electronic surveys and multiple case study. The research concentrates on small to large companies in Estonia and Finland, mainly in construction, engineering, ICT, and machinery industries. The literature review reveals that interdependencies are deeply involved in R&D and innovation. Survey analysis shows that companies are aware of interdependency issues in general, but they i have lack of detailed knowledge to use it thoroughly. Empirical evidence also indicates that interdependency techniques influence the success rate and other efficiency aspects to different extents. There are a lot of similarities in interdependency related managerial issues in companies of varying sizes and countries in Northern Europe. Differences found in the study are for instance the fact that smaller companies face more difficulties in implementing and evaluating interdependency procedures. Country differences between Estonia and Finland stem from working solutions to manage interdependencies on a daily basis.historical and cultural reasons, such as the special features of a transition country compared to a mature country. An overview of the dominant problems, best practices, and commonly used techniques associated with interdependency is provided in the study. Empirical findings show that many interdependency techniques are not used in practice. A multiple case study was performed in the study to find out how interdependencies are managed in real life on a daily basis. The results show that interdependencies are mostly managed in an informal manner. A description of managing the interdependencies and implementation procedures is given. Interdependency procedures are hard to implement, especially in smaller companies. Companies have difficulties in implementing interdependency procedures and evaluating them. The study contains detailed results on how companies have implemented working solutions to manage interdependencies on a daily basis
Resumo:
This thesis discusses adaption of new project management tool at ABB Oy Motors and Generators business unit, Synchronous Machines profit centre. Thesis studies project modeling in general and buries in the Gate Model used at ABB Synchronous Machines. It is essential to understand Gate Model because this new project management tool, called Project Master Document, is created on the base of the existing project model. Thesis also analyzes goals and structure of Project Master Document in order to ease implementation of this new tool. Project Master Document aims to improved customer order fulfillment by clearing order handover interface. Office process, especially responsibilities and target dates, become also clearer after Master Document implementation. The document is built to be frame for whole order fulfillment process including check points for each gate of project model and updated memos from all project meetings. Furthermore, project progress will be clearly stated by status markings and visualized with colors.
Resumo:
In R&D organizations multiple projects are executed concurrently. Problems arises in managing shared resources since they are needed by multiple projects simultaneously. The objective of this thesis was to study how the project and resource management could be developed in a public sector R&D organization. The qualitative research was carried out in the Magnetic Measurements section at CERN where the section measures magnets for particle accelerators and builds state of the art measurement devices for various needs. Hence, the R&D and measurement projects are very time consuming and very complex. Based on the previous research and the requirements from the organization the best alter- native for resource management was to build a project management information system. A centralized database was constructed and on top of it was built an application for interacting and visualizing the project data. The application allows handling project data, which works as a basis for resource planning before and during the projects are executed. It is one way to standardize the work-flow of projects, which strengthens the project process. Additionally, it was noted that the inner customer’s database, the measurement system and the new application needed to be integrated. Further integration ensures that the project data is received efficiently from customers and available not only within the application but also during the concrete work. The research results introduced a new integrated application, which centralizes the project information flow with better visibility.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2