945 resultados para Prioritized fuzzy constraint satisfaction
Resumo:
This paper introduces a model to facilitate delegation, including ad-hoc delegation, in cross security domain activities. Specifically, this paper proposes a novel delegation constraint management model to manage and track delegation constraints across security domains. An algorithm to trace the authority of delegation constraints is introduced as well as an algorithm to form a delegation constraint set and detect/prevent potential conflicts. The algorithms and the management model are built upon a set of formal definitions of delegation constraints.
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
As governments around the world adopt a marketing orientation, the importance of consumer satisfaction to the effectiveness of the organization is being recognized. While some investigation of satisfaction with a government agencies' service has occurred, there is little examination of satisfaction with a government agency that acts as a third-party on the behalf of consumers to gain marketplace redress. Given the number of third-party complaints is increasing as a result of internet access to complaint channels, this research is a timely investigation. This study reports the findings of a survey of 454 complainants to an Australian Government agency: the Office of Fair Trading (OFT). The findings show that satisfaction with the service was subjectively experienced, based around individual expectations of the redress and satisfaction levels were higher when the redress sought was financial compared with non-financial forms of redress such as apology.
Resumo:
Evaluation, selection and finally decision making are all among important issues, which engineers face in long run of projects. Engineers implement mathematical and nonmathematical methods to make accurate and correct decisions, whenever needed. As extensive as these methods are, effects of any selected method on outputs achieved and decisions made are still suspicious. This is more controversial and challengeable, where evaluation is made among non-quantitative alternatives. In civil engineering and construction management problems, criteria include both quantitative and qualitative ones, such as aesthetic, construction duration, building and operation costs, and environmental considerations. As the result, decision making frequently takes place among non-quantitative alternatives. It should be noted that traditional comparison methods, including clear-cut and inflexible mathematics, have always been criticized. This paper demonstrates a brief review of traditional methods of evaluating alternatives. It also offers a new decision making method using, fuzzy calculations. The main focus of this research is some engineering issues, which have flexible nature and vague borders. Suggested method provides analyzability of evaluation for decision makers. It is also capable to overcome multi criteria and multi-referees problems. In order to ease calculations, a program named DeMA is introduced.
Resumo:
In an environment where economic, political and technological change is the rule, a fundamental business strategy should be the defence of traditional markets and thoughtful entry into new markets, with an aim to increase market penetration and stimulate profit. The success of such a strategy will depend on the success of firms to do more and better for customers than their competitors. In other words, the firm’s primary competitive advantage will come from changes they implement to please their customers. In the construction industry, complexity of technical knowledge and construction processes have traditionally encouraged clients to play a largely passive role in the management of their project. However, today’s clients not only want to know about internal efficiency of their projects but also need to know how they and their contractors compare and compete against their competitors. Given the vulnerability of construction activities in the face of regional financial crisis, constructors need to be proactive in the search to improve their internal firm and project processes to ensure profitability and market responsiveness. In this context, reengineering is a radical design that emphasises customer satisfaction rather than cost reduction This paper discusses the crucial role of the client-project interface and how project networks could facilitate and improve information dissemination and sharing, collaborative efforts, decision-making and improved project climate. An intra-project network model is presented, and project managers’ roles and competencies in forming and coordinating project workgroups is discussed.
Resumo:
Magneto-rheological (MR) fluid damper is a semi-active control device that has recently received more attention by the vibration control community. But inherent nonlinear hysteresis character of magneto-rheological fluid dampers is one of the challenging aspects for utilizing this device to achieve high system performance. So the development of accurate model is necessary to take the advantage their unique characteristics. Research by others [3] has shown that a system of nonlinear differential equations can successfully be used to describe the hysteresis behavior of the MR damper. The focus of this paper is to develop an alternative method for modeling a damper in the form of centre average fuzzy interference system, where back propagation learning rules are used to adjust the weight of network. The inputs for the model are used from the experimental data. The resulting fuzzy interference system is satisfactorily represents the behavior of the MR fluid damper with reduced computational requirements. Use of the neuro-fuzzy model increases the feasibility of real time simulation.
Resumo:
This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.
Resumo:
Intelligent agents are an advanced technology utilized in Web Intelligence. When searching information from a distributed Web environment, information is retrieved by multi-agents on the client site and fused on the broker site. The current information fusion techniques rely on cooperation of agents to provide statistics. Such techniques are computationally expensive and unrealistic in the real world. In this paper, we introduce a model that uses a world ontology constructed from the Dewey Decimal Classification to acquire user profiles. By search using specific and exhaustive user profiles, information fusion techniques no longer rely on the statistics provided by agents. The model has been successfully evaluated using the large INEX data set simulating the distributed Web environment.
Resumo:
This paper presents an approach to predict the operating conditions of machine based on classification and regression trees (CART) and adaptive neuro-fuzzy inference system (ANFIS) in association with direct prediction strategy for multi-step ahead prediction of time series techniques. In this study, the number of available observations and the number of predicted steps are initially determined by using false nearest neighbor method and auto mutual information technique, respectively. These values are subsequently utilized as inputs for prediction models to forecast the future values of the machines’ operating conditions. The performance of the proposed approach is then evaluated by using real trending data of low methane compressor. A comparative study of the predicted results obtained from CART and ANFIS models is also carried out to appraise the prediction capability of these models. The results show that the ANFIS prediction model can track the change in machine conditions and has the potential for using as a tool to machine fault prognosis.
Resumo:
This paper presents a fault diagnosis method based on adaptive neuro-fuzzy inference system (ANFIS) in combination with decision trees. Classification and regression tree (CART) which is one of the decision tree methods is used as a feature selection procedure to select pertinent features from data set. The crisp rules obtained from the decision tree are then converted to fuzzy if-then rules that are employed to identify the structure of ANFIS classifier. The hybrid of back-propagation and least squares algorithm are utilized to tune the parameters of the membership functions. In order to evaluate the proposed algorithm, the data sets obtained from vibration signals and current signals of the induction motors are used. The results indicate that the CART–ANFIS model has potential for fault diagnosis of induction motors.