772 resultados para Optimization. Semiarid. Management. Performance Indicators
Resumo:
Regarding canal management modernization, water savings and water delivery quality, the study presents two automatic canal control approaches of the PI (Proportional and Integral) type: the distant and the local downstream control modes. The two PI controllers are defined, tuned and tested using an hydraulic unsteady flow simulation model, particularly suitable for canal control studies. The PI control parameters are tuned using optimization tools. The simulations are done for a Portuguese prototype canal and the PI controllers are analyzed and compared considering a demand-oriented-canal operation. The paper presents and analyzes the two control modes answers for five different offtake types – gate controlled weir, gate controlled orifice, weir with or without adjustable height and automatic flow adjustable offtake. The simulation results are compared using water volumes performance indicators (considering the demanded, supplied and the effectives water volumes) and a time indicator, defined taking into account the time during which the demand discharges are effective discharges. Regarding water savings, the simulation results for the five offtake types prove that the local downstream control gives the best results (no water operational losses) and that the distant downstream control presents worse results in connection with the automatic flow adjustable offtakes. Considering the water volumes and time performance indicators, the best results are obtained for the automatic flow adjustable offtakes and the worse for the gate controlled orifices, followed by the weir with adjustable height.
Resumo:
This thesis introduce a new innovation methodology called IDEAS(R)EVOLUTION that was developed according to an on-going experimental research project started in 2007. This new approach to innovation has initial based on Design thinking for innovation theory and practice. The concept of design thinking for innovation has received much attention in recent years. This innovation approach has climbed from the design and designers knowledge field towards other knowledge areas, mainly business management and marketing. Human centered approach, radical collaboration, creativity and breakthrough thinking are the main founding principles of Design thinking that were adapted by those knowledge areas due to their assertively and fitness to the business context and market complexity evolution. Also Open innovation, User-centered innovation and later on Living Labs models emerge as answers to the market and consumers pressure and desire for new products, new services or new business models. Innovation became the principal business management focus and strategic orientation. All this changes had an impact also in the marketing theory. It is possible now to have better strategies, communications plans and continuous dialogue systems with the target audience, incorporating their insights and promoting them to the main dissemination ambassadors of our innovations in the market. Drawing upon data from five case studies, the empirical findings in this dissertation suggest that companies need to shift from Design thinking for innovation approach to an holistic, multidimensional and integrated innovation system. The innovation context it is complex, companies need deeper systems then the success formulas that “commercial “Design thinking for innovation “preaches”. They need to learn how to change their organization culture, how to empower their workforce and collaborators, how to incorporate external stakeholders in their innovation processes, hoe to measure and create key performance indicators throughout the innovation process to give them better decision making data, how to integrate meaning and purpose in their innovation philosophy. Finally they need to understand that the strategic innovation effort it is not a “one shot” story it is about creating a continuous flow of interaction and dialogue with their clients within a “value creation chain“ mindset; RESUMO: Metodologia de co-criação de um produto/marca cruzando Marketing, Design Thinking, Criativity and Management - IDEAS(R)EVOLUTION. Esta dissertação apresenta uma nova metodologia de inovação chamada IDEAS(R)EVOLUTION, que foi desenvolvida segundo um projecto de investigação experimental contínuo que teve o seu início em 2007. Esta nova abordagem baseou-se, inicialmente, na teoria e na práctica do Design thinking para a inovação. Actualmente o conceito do Design Thinking para a inovação “saiu” do dominio da area de conhecimento do Design e dos Designers, tendo despertado muito interesse noutras áreas como a Gestão e o Marketing. Uma abordagem centrada na Pessoa, a colaboração radical, a criatividade e o pensamento disruptivo são principios fundadores do movimento do Design thinking que têm sido adaptados por essas novas áreas de conhecimento devido assertividade e adaptabilidade ao contexto dos negócios e à evolução e complexidade do Mercado. Também os modelos de Inovação Aberta, a inovação centrada no utilizador e mais tarde os Living Labs, emergem como possiveis soluções para o Mercado e para a pressão e desejo dos consumidores para novos productos, serviços ou modelos de negócio. A inovação passou a ser o principal foco e orientação estratégica na Gestão. Todas estas mudanças também tiveram impacto na teoria do Marketing. Hoje é possivel criar melhores estratégias, planos de comunicação e sistemas continuos de diálogo com o público alvo, incorporando os seus insights e promovendo os consumidores como embaixadores na disseminação da inovação das empresas no Mercado Os resultados empiricos desta tese, construídos com a informação obtida nos cinco casos realizados, sugerem que as empresas precisam de se re-orientar do paradigma do Design thinking para a inovação, para um sistema de inovação mais holistico, multidimensional e integrado. O contexto da Inovação é complexo, por isso as empresas precisam de sistemas mais profundos e não apenas de “fórmulas comerciais” como o Design thinking para a inovação advoga. As Empresas precisam de aprender como mudar a sua cultura organizacional, como capacitar sua força de trabalho e colaboradores, como incorporar os públicos externos no processo de inovação, como medir o processo de inovação criando indicadores chave de performance e obter dados para um tomada de decisão mais informada, como integrar significado e propósito na sua filosofia de inovação. Por fim, precisam de perceber que uma estratégia de inovação não passa por ter “sucesso uma vez”, mas sim por criar um fluxo contínuo de interação e diálogo com os seus clientes com uma mentalidade de “cadeia de criação de valor”
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.
Resumo:
This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.
Resumo:
This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.
Resumo:
Business Process Management (BPM) in recent years has become a highest priority area for most organizations. Since this concept is multidisciplinary, success in this endeavour requires considering different factors. A number of studies have been conducted to identify these factors; however, most are limited to the introduction of high-level factors or to the identification of the means of success within only a specific context. This paper presents a holistic framework of success factors as well as the associated means for achieving success. This framework introduces nine factors, namely culture, leadership, communication, Information Technology, strategic alignment, people, project management, performance measurement and methodology. Each of these factors are characterized further by defining some sub-constructs and under each sub construct the means for achieving success are also introduced. This framework including means for achieving success can be useful for BPM project stakeholders in adequately planning the initiative and checking the progress during the implementation.
Resumo:
This paper describes the development of an innovative online website for international graduate students studying at universities in Australia. In 2008, the Queensland University of Technology (QUT) in Australia identified as a key goal the development of its profile as a research intensive university. One of the performance indicators in realising this goal was to increase the proportion of international graduate students from 20% to 50% over a five-year period. To support these students, the University Research Students Centre (RSC) decided to develop an innovative interactive website called the ‘Doorway to Research’ to help prepare students for their arrival in Australia, by providing access to information and support between the period of their acceptance to their graduate programs and their arrival into the country.
Resumo:
To maintain or achieve competitiveness and profitability, a manufacturing firm or enterprise must respond to a range of challenges, including rapid improvements in technology; declining employment and output; globalisation of markets and environmental requirements. In addition, substantial changes in government policy have had important impacts in many countries, as have the increasing levels of global trade. Manufacturing enterprises need to have a clear understanding of what their customers want and why customers purchase their products rather than purchase from their competitors. They need to fully understand the aims of the business in terms of its customers, market segments, product attributes, geographical markets and performance. Continuous Improvement (CI) methods have become widely adopted and regarded as providing an important component of increased company competitiveness. This article examines the extent to which continuous improvement activities have contributed to the different areas of business performance.
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.