974 resultados para Material management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research report illustrates and examines new operation models for decreasing fixed costs and transforming them into variable costs in the field of paper industry. The report illustrates two cases – a new operation model for material logistics in maintenance and an examination of forklift truck fleet outsourcing solutions. Conventional material logistics in maintenance operation is illustrated and some problems related to conventional operation are identified. A new operation model that solves some of these problems is presented including descriptions of procurement and service contracts and sources of added value. Forklift truck fleet outsourcing solutions are examined by illustrating the responsibilities of a host company and a service provider both before and after outsourcing. The customer buys outsourcing services in order to improve its investment productivity. The mechanism of how these services affect the customer company’s investment productivity is illustrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Operation of pulp and paper mills generates waste including wastewater treatment sludge and deinking sludge. Both sludge types are generated in large amounts and are mainly disposed of in landfills in the Leningrad Region resulting in environmental degradation. The thesis was aimed at seeking new sustainable ways of sludge utilization. Two paper mills operating in the Leningrad Region and landfilling their sludge were identified: “SCA Hygiene Products Russia” and “Knauf”. The former generates 150 t/day of deinking sludge, the latter – 145 t/day of secondary sludge. Chemical analyses of deinking sludge were performed to assess applicability of sludge in construction materials production processes. Higher heating value on dry basis of both sludge types was determined to evaluate energy potential of sludge generated in the Leningrad Region. Total energy output from sludge incineration was calculated. Deinking sludge could be utilized in the production process of “LSR-Cement” or “Slantsy Cement Plant Cesla” factories, and “Pobeda” and “Nikolsky” brick mills without exceeding current sludge management costs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this thesis is to build a viral marketing management framework for a Finnish medium sized gaming company. This is achieved by first finding and building a theoretical five step management process framework based on literature, analyzing current model and giving recommendations for the case company to develop its own management process. In addition, viral marketing research is still in early stage resulting this study to propose its own take on the definition in the theory part. Empirical part is based on qualitative interviews, campaign material and secondary sources and is aimed to find out and analyze the case company’s current viral marketing state and to give recommendations to it. The final outcome of the study is a general, theoretical management framework for viral marketing campaigns and specified recommendations for the case company.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Strikes provide a current, fresh but also a seldom-addressed issue to study from economic sciences perspective. This study provides to filling this research gap by trying to identify attitudes towards strikes that can be found inside organizations. The research problem this study then sets out to answer is: “What kinds of attitudes exist inside organizations towards industrial actions and how attitudes vary between labour, management and human resources?” This study has been planned with a view to test how qualitative attitudinal research, as a method, is suited to studying a phenomenon such as strike. At the heart of this research approach lies an assumption linked to rhetoric social psychology, that attitude is a phenomenon that can be identified in argumentation. For this research 10 semi-structured interviews in 4 organizations were conducted utilizing statements and pictures as stimulants for discussion. The material was transcribed and analysed following the two levels, categorical and interpretive, demanded by the chosen method. Altogether five attitudes were discovered; three of them negative, one indifferent and one positive by nature. The negative attitudes of unfairness, failure and personification towards strikes represented the side of strikes that was perhaps the most anticipated, portraying the contradictions between employees and employer. The attitude of ordinariness, which portrayed indifference, and the positive attitude of change however, were more unanticipated findings. They reflect shared understanding and trust between conflict parties. The utilization of qualitative attitudinal approach to study strikes was deemed successful. The results of this study support prior literature on workplace conflicts for example in regards of the definition of conflict and typologies conflicts. In addition the multifaceted nature of strikes can be perceived as one statement supported by this study. It arises in the nature of the attitudes, the diversity of discussion themes during the interviews as well as in the extent of possible theories to apply.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Liiketoiminnan organisoiminen projekteiksi on erittäin yleistä nykyisin. Suuri osa projekteista erityisesti IT-alalla epäonnistuu kuitenkin saavuttamaan tavoitteensa. Projektin menestys on tyypillisesti mitattu budjetin, aikataulun, laadun ja sidosryhmien tyytyväisyyden perusteella. Tämän Pro Gradu -tutkielman tarkoituksena on etsiä tyypillisimpiä syitä projektien epäonnistumiseen ja löytää projektien seurannan ja mittaamisen avulla keinoja näiden epäonnistumisten ehkäisemiseen. Tutkimusmenetelmänä on laadullinen tapaustutkimus. Empiirinen aineisto on kerätty haastattelujen, eri materiaalien analysoinnin ja havainnoinnin avulla. Teoriaosuus tarjoaa kattavan yhteenvedon projektiliiketoiminnan ja yksittäisten projektien johtamiseen sekä projektien seurantaan ja mittaamiseen aikaisemman kirjallisuuden perusteella. Empiirisessä osiossa suoritetaan analyysi Case -yrityksen projektien seurantaan ja valittuihin projekteihin. Analyysien, haastattelujen ja havainnoinnin pohjalta tehdään johtopäätökset tyypillisimmistä, ongelmia projekteissa aiheuttavista tekijöistä sekä näiden esiintymisestä projektin elinkaaren eri vaiheissa. Mahdolliset ongelmia ehkäisevät keinot esitetään myös. Ehdotuksia kehityskohteiksi esitetään lopuksi teorian ja empirian pohjalta.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aker Arctic Technology Inc. (AACR) on kansainvälisesti tunnettu jäänmurtajien ja muiden arktisten alueiden laivojen suunnitteluun ja tekniseen konsultointiin erikoistuneena yhtiönä. Työn tavoitteena on luoda uusi arktisille alueille suunnattu liiketoimintakonsepti, jossa liiketoimintamallia kehitetään asiakastarpeen mukaan vastaamaan ja luomaan kysyntää palvelulle. Fyysisen kehitystyön tuloksena voidaan tarjota globaalisti ainutlaatuista teknistä testaustoimintaa ja säilytetään mallikoelaitoksen etumatka kilpailijoihin rakenteiden, tasanteiden ja alusten jäissä toimivuuden osalta. Tämän diplomityön teoreettisessa osuudessa kuvataan uusien ja jo olemassa olevien liiketoimintamallien kehittämiseen tarvittavaa johdon strategista välinettä Business Model Canvasia (BMC) ja muita analyysityökaluja. Työn teoreettisessa osuudessa käytettiin tieteellistä kirjallista aineistoa, julkaisuja sekä koti- että ulkomailta. Työn tutkimuksellisessa osuudessa havainnoitiin kuuden kuukauden ajan yrityksen sisällä toiminnassa tapahtuvaa liiketoimintaa. Havainnoinnin kautta kerättiin analyysien tiedot, joiden perusteella yhdessä yrityksen edustajien kanssa saatiin aikaan BMC. Uusi liiketoimintakonseptin todettiin olevan tarpeellinen arktisten offshore-palveluiden lisääntyvässä tarpeessa. Konseptin myötä saadaan nykyinen yrityksen palveluiden kompleksisuus pois ja samalla kyetään aggressiivisemmin markkinoimaan uusia tuotteita asiakkaille. Konseptin suurimpana vahvuutena on omat mallinnustilat, jonka monikäyttöisyys antaa liiketoiminnalle tarvittavan kilpailuedun.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this work was to describe and compare sourcing practices and challenges in different geographies, to discuss possible options to advance sustainability of global sourcing, and to provide examples to answer why sourcing driven by sustainability principles is so challenging to implement. The focus was on comparison between Europe & Asia & South-America from the perspective of sustainability adoption. By analyzing sourcing practices of the case company it was possible to describe main differences and challenges of each continent, available sourcing options, supplier relationships and ways to foster positive chance. In this qualitative case study gathered theoretical material was compared to extensive sourcing practices of case company in a vast supplier network. Sourcing specialist were interviewed and information provided by them analyzed in order to see how different research results and theories are reflecting reality and to find answers to proposed research questions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study explored strategies that Brock University undergraduate students value the most for managing anxiety in academia. Although previous literature indicates services and techniques such as academic advising, physical activity, and educator engagement help students, few if any have ranked students’ perceived value of anxiety-management strategies. The researcher recruited 54 undergraduate student participants (primarily from the Department of Community Health Sciences) through online invitation. Participants completed an online survey to rate their previous experience with anxiety-management strategies discussed in the literature. Survey findings identified the 4 most valuable resources students used to manage anxiety in academia: (a) educators who post academic material posted online (e.g., on Sakai) early in the term, (b) physical activity, (c) socialization, and (d) breaking large assignments into smaller portions. Conversely, student participants found disability services, counseling, and medication to be the least valuable resources. Results suggest higher-education facilities should ensure that the most valuable services are readily available to students seeking them. The study contributes to the field by identifying a broad set of strategies that students find highly valuable in their management of academic related anxiety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Management Council for Responsible Labour Relations was a group of industry representatives who sought to improve the public image of management in labour disputes. They hoped to accomplish this by improving communication with the media, as well as by educating the general public about labour issues from management’s perspective. The Council had representatives from Inco, Gulf, Algoma, Westinghouse, Kimberly Clark, Ford, Stelco, Massey Ferguson, Alcan, Shell, Northern Electric, Bank of Montreal, Canada Packers and Dupont.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thesis entitled Inventory Management In Public Sector Electrical Industry In Kerala. Investigations were carried out on inventory management in public sector electrical industry in Kerala and suggest methods to improve their efficiency. Various aspects of inventory management, its scope and need in industry are detailed. The objectives of the present study concentrates to get an overall view of the system of inventory management, assess the positions and levels of inventory. It analyzes the inventory management policies and practices, the organizational set-up for materials by the electrical undertakings. The study examines the liquidity of the electrical undertakings as well as techniques of inventory management in the electrical industry in Kerala. Hypotheses state that the existing organizational systems and practices are inadequate to ensure efficient management of inventories in electrical industry. Introduction of scientific inventory techniques has a favourable effect on the workings of inventory departments. The financial performance of the public sector electrical undertakings is not at all satisfactory on account of the high raw material costs, heavy borrowings and huge interest burdens. The scope of this study is limited to the assessment of savings, in inventories of electrical products due to inventory management. The methodology of the study is to project the cost reduction of the inventory department on the basis of data collected and to validate this projection with the aid of analysis and survey. The limitations of the study is that the data obtained relate to the period 1989-90 and earlier and the current position is not available and uniform norms cannot be applied to evaluate different inventory management organisation.