883 resultados para Project performance Infrastructure


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature has emphasized that absorptive capacity (AC) leads to performance, but in projects its influences still unclear. Additionally, the project success is not well understood by the literature, and AC can be an important mechanism to explain it. Therefore, the purpose of this study is to investigate the effect of absorptive capacity on project performance in the construction industry of São Paulo State. We study this influence through potential and realized absorptive capacity proposed by Zahra and George (2002). For achieving this goal, we use a combination of qualitative and quantitative research. The qualitative research is based on 15 interviews with project managers in different sectors to understand the main constructs and support the next quantitative phase. The content analysis was the technique used to analyze those interviews. In quantitative phase through a survey questionnaire, we collected 157 responses in the construction sector with project managers. The confirmatory factor analysis and hierarchical linear regression were the techniques used to assess the data. Our findings suggest that the realized absorptive capacity has a positive influence on performance, but potential absorptive capacity and the interactions effect have no influence on performance. Moreover, the planning and monitoring have a positive impact on budget and schedule, and customer satisfaction while risk coping capacity has a positive impact on business success. In academics terms, this research enables a better understanding of the importance of absorptive capacity in the construction industry and it confirms that knowledge application in processes and routines enhances performance. For management, the absorptive capacity enables the improvements of internal capabilities reflected in the increased project management efficiency. Indeed, when a company manages project practices efficiently it enhances business and project performance; however, it needs initially to improve its internal abilities to enrich processes and routines through relevant knowledge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conflict resolution is a key issue to manage when dealing with diverse stakeholders. By analysing in depth the most relevant and implicit aspects of the construct "conflict", this study focuses on examining how the five main strategies in solving common disagreements are adopted by considering different conflict sources. Hypotheses are tested using data collected from both the academic and business world. Perceptions of project managers and team members allows the authors not only to find significant differences by role played or type of organization, but to narrow the design of future approaches to investigate the relation between conflict and project performance. More specifically, the research indicates that project managers adopt confronting and compromising styles in most cases as first options, highlighting the influence of responsibility degree factor in how issues are undertaken within a project team.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

WI docs. no.: Ed.6/2:C 3f/1978

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investigation of the performance of engineering project organizations is critical for understanding and eliminating inefficiencies in today’s dynamic global markets. The existing theoretical frameworks consider project organizations as monolithic systems and attribute the performance of project organizations to the characteristics of the constituents. However, project organizations consist of complex interdependent networks of agents, information, and resources whose interactions give rise to emergent properties that affect the overall performance of project organizations. Yet, our understanding of the emergent properties in project organizations and their impact on project performance is rather limited. This limitation is one of the major barriers towards creation of integrated theories of performance assessment in project organizations. The objective of this paper is to investigate the emergent properties that affect the ability of project organization to cope with uncertainty. Based on the theories of complex systems, we propose and test a novel framework in which the likelihood of performance variations in project organizations could be investigated based on the environment of uncertainty (i.e., static complexity, dynamic complexity, and external source of disruption) as well as the emergent properties (i.e., absorptive capacity, adaptive capacity, and restorative capacity) of project organizations. The existence and significance of different dimensions of the environment of uncertainty and emergent properties in the proposed framework are tested based on the analysis of the information collected from interviews with senior project managers in the construction industry. The outcomes of this study provide a novel theoretical lens for proactive bottom-up investigation of performance in project organizations at the interface of emergent properties and uncertainty

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Liiketoiminnan organisoiminen projekteiksi on erittäin yleistä nykyisin. Suuri osa projekteista erityisesti IT-alalla epäonnistuu kuitenkin saavuttamaan tavoitteensa. Projektin menestys on tyypillisesti mitattu budjetin, aikataulun, laadun ja sidosryhmien tyytyväisyyden perusteella. Tämän Pro Gradu -tutkielman tarkoituksena on etsiä tyypillisimpiä syitä projektien epäonnistumiseen ja löytää projektien seurannan ja mittaamisen avulla keinoja näiden epäonnistumisten ehkäisemiseen. Tutkimusmenetelmänä on laadullinen tapaustutkimus. Empiirinen aineisto on kerätty haastattelujen, eri materiaalien analysoinnin ja havainnoinnin avulla. Teoriaosuus tarjoaa kattavan yhteenvedon projektiliiketoiminnan ja yksittäisten projektien johtamiseen sekä projektien seurantaan ja mittaamiseen aikaisemman kirjallisuuden perusteella. Empiirisessä osiossa suoritetaan analyysi Case -yrityksen projektien seurantaan ja valittuihin projekteihin. Analyysien, haastattelujen ja havainnoinnin pohjalta tehdään johtopäätökset tyypillisimmistä, ongelmia projekteissa aiheuttavista tekijöistä sekä näiden esiintymisestä projektin elinkaaren eri vaiheissa. Mahdolliset ongelmia ehkäisevät keinot esitetään myös. Ehdotuksia kehityskohteiksi esitetään lopuksi teorian ja empirian pohjalta.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This research studied the project performance measurement from the perspective of strategic management. The objective was to find a generic model for project performance measurement that emphasizes strategy and decision making. Research followed the guidelines of a constructive research methodology. As a result, the study suggests a model that measures projects with multiple meters during and after projects. Measurement after the project is suggested to be linked to the strategic performance measures of a company. The measurement should be conducted with centralized project portfolio management e.g. using the project management office in the organization. Metrics, after the project, measure the project’s actual benefit realization. During the project, the metrics are universal and they measure the accomplished objectives relation to costs, schedule and internal resource usage. Outcomes of these measures should be forecasted by using qualitative or stochastic methods. Solid theoretical background for the model was found from the literature that covers the subjects of performance measurement, projects and uncertainty. The study states that the model can be implemented in companies. This statement is supported by empirical evidence from a single case study. The gathering of empiric evidence about the actual usefulness of the model in companies is left to be done by the evaluative research in the future.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Con la creciente popularidad de las soluciones de IT como factor clave para aumentar la competitividad y la creación de valor para las empresas, la necesidad de invertir en proyectos de IT se incrementa considerablemente. La limitación de los recursos como un obstáculo para invertir ha obligado a las empresas a buscar metodologías para seleccionar y priorizar proyectos, asegurándose de que las decisiones que se toman son aquellas que van alineadas con las estrategias corporativas para asegurar la creación de valor y la maximización de los beneficios. Esta tesis proporciona los fundamentos para la implementación del Portafolio de dirección de Proyectos de IT (IT PPM) como una metodología eficaz para la gestión de proyectos basados en IT, y una herramienta para proporcionar criterios claros para los directores ejecutivos para la toma de decisiones. El documento proporciona la información acerca de cómo implementar el IT PPM en siete pasos, el análisis de los procesos y las funciones necesarias para su ejecución exitosa. Además, proporciona diferentes métodos y criterios para la selección y priorización de proyectos. Después de la parte teórica donde se describe el IT PPM, la tesis aporta un análisis del estudio de caso de una empresa farmacéutica. La empresa ya cuenta con un departamento de gestión de proyectos, pero se encontró la necesidad de implementar el IT PPM debido a su amplia cobertura de procesos End-to-End en Proyectos de IT, y la manera de asegurar la maximización de los beneficios. Con la investigación teórica y el análisis del estudio de caso, la tesis concluye con una definición práctica de un modelo aproximado IT PPM como una recomendación para su implementación en el Departamento de Gestión de Proyectos.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the last decades, the increasing significance of “projectivization” (Lundin & Steinthórsson, 2003) has stimulated considerable interest in project-based organizations as new economic actors able to introduce a new logic of organizing work and weakening boundaries in favour of networks of collaborations. In these contexts, work is often delegated to project teams. Deciding whom to put on a project team is one of the biggest challenges faced by a project manager; in particular which characteristics rely on to compose and match effective teams. We address this issue, focusing on the individual flexibility (Raudsepp, 1990), as team composition variable that affects project team performance. Thus, the research question investigated is: Is it better to compose project teams with flexible team members or not flexible project team members to achieve higher levels of project performance? The temporary nature of PBOs involves that after achieving the purpose for which team members are enrolled, they are disbanded but their relationships remain, allowing them to be involved in future projects (Starkey, Barnatt & Tempest, 2000). Pre-existing relationships together with the current relationships create a network of relationships that yields some implications for project teams as well as for team members. We address this issue, exploring the following research question: To what extent is the individual flexibility influenced by the network structure? The conceptual framework is used to articulate the research questions investigated with respect to the Television drama serials production. Their project-team organizing combined with their capacity to dissolve and recreate over time make it an interesting field to develop. We contribute to the organizational literature, providing a clear operationalization of individual flexibility construct and its role on affecting project performance. Second, we contribute to the organizational network literature addressing the effects yielded by the network structure-structural holes and network closure- on the individual flexibility.