18 resultados para Michigan Memorial Phoenix Project


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Public participation is an important component of Michigan’s Part 632 Nonferrous Mining law and is identified by researchers as important to decision-making processes. The Kennecott Eagle Project, which is located near Marquette, Michigan, is the first mine permitted under Michigan’s new mining regulation, and this research examines how public participation is structured in regulations, how the permitting process occurred during the permitting of the Eagle Project, and how participants in the permitting process perceived their participation. To understand these issues, this research implemented a review of existing mining policy and public participation policy literature, examination of documents related to the Kennecott Eagle Project and completion of semi-structured, ethnographic interviews with participants in the decision-making process. Interviewees identified issues with the structure of participation, the technical nature of the permitting process, concerns about the Michigan Department of Environmental Quality’s (DEQ) handling of mine permitting, and trust among participants. This research found that the permitting of the Kennecott Eagle Mine progressed as structured by regulation and collected technical input on the mine permit application, but did not meet the expectations of some participants who opposed the project. Findings from this research indicated that current mining regulation in Michigan is resilient to public opposition, there is need for more transparency from the Michigan DEQ during the permitting process, and current participatory structures limit the opportunities for some stakeholder groups to influence decision-making.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This document describes the process by which the Michigan Technological University Community may submit proposals to contribute content to Digital Commons @ Michigan Tech.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This document explains the process by which members of the Michigan Technological University Community may contribute content to Digital Commons @ Michigan Tech.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This document may be used as a template for creating project plans, the process by which members of the Michigan Technological University community may contribute content to Digital Commons @ Michigan Tech.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research evaluated an Intelligent Compaction (IC) unit on the M-189 highway reconstruction project at Iron River, Michigan. The results from the IC unit were compared to several traditional compaction measurement devices including Nuclear Density Gauge (NDG), Geogauge, Light Weight Deflectometer (LWD), Dynamic Cone Penetrometer (DCP), and Modified Clegg Hammer (MCH). The research collected point measurements data on a test section in which 30 test locations on the final Class II sand base layer and the 22A gravel layer. These point measurements were compared with the IC measurements (ICMVs) on a point-to-point basis through a linear regression analysis. Poor correlations were obtained among different measurements points using simple regression analysis. When comparing the ICMV to the compaction measurements points. Factors attributing to the weak correlation include soil heterogeneity, variation in IC roller operation parameters, in-place moisture content, the narrow range of the compaction devices measurement ranges and support conditions of the support layers. After incorporating some of the affecting factors into a multiple regression analysis, the strength of correlation significantly improved, especially on the stiffer gravel layer. Measurements were also studied from an overall distribution perspective in terms of average, measurement range, standard deviation, and coefficient of variance. Based on data analysis, on-site project observation and literature review, conclusions were made on how IC performed in regards to compaction control on the M-189 reconstruction project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Environmental Health (EH) program of Peace Corps (PC) Panama and a non-governmental organization (NGO) Waterlines have been assisting rural communities in Panama gain access to improved water sources through the practice of community management (CM) model and participatory development. Unfortunately, there is little information available on how a water system is functioning once the construction is complete and the volunteer leaves the community. This is a concern when the recent literature suggests that most communities are not able to indefinitely maintain a rural water system (RWS) without some form of external assistance (Sara and Katz, 1997; Newman et al, 2002; Lockwood, 2002, 2003, 2004; IRC, 2003; Schweitzer, 2009). Recognizing this concern, the EH program director encouraged the author to complete a postproject assessment of the past EH water projects. In order to carry out the investigation, an easy to use monitoring and evaluation tool was developed based on literature review and the author’s three years of field experience in rural Panama. The study methodology consists of benchmark scoring systems to rate the following ten indicators: watershed, source capture, transmission line, storage tank, distribution system, system reliability, willingness to pay, accounting/transparency, maintenance, and active water committee members. The assessment of 28 communities across the country revealed that the current state of physical infrastructure, as well as the financial, managerial and technical capabilities of water committees varied significantly depending on the community. While some communities are enjoying continued service and their water committee completing all of its responsibilities, others have seen their water systems fall apart and be abandoned. Overall, the higher score were more prevalent for all ten indicators. However, even the communities with the highest scores requested some form of additional assistance. The conclusion from the assessment suggests that the EH program should incorporate an institutional support mechanism (ISM) to its sector policy in order to systematically provide follow-up support to rural communities in Panama. A full-time circuit rider with flexible funding would be able to provide additional technical support, training and encouragement to those communities in need.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The electrical power source is a critical component of the scoping level study as the source affects both the project economics and timeline. This paper proposes a systematic approach to selecting an electrical power source for a new mine. Orvana Minerals Copperwood project is used as a case study. The Copperwood results show that the proposed scoping level approach is consistent with the subsequent much more detailed feasibility study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Indoor air pollution from combustion of solid fuels is the fifth leading contributor to disease burden in low-income countries. This, and potential to reduce environmental impacts, has resulted in emphasis on use of improved stoves. However, many efforts have failed to meet expectations and effective coverage remains limited. A disconnect exists between technologies, delivery methods, and long-term adoption. The purpose of this research is to develop a framework to increase long-term success of improved stove projects. The framework integrates sustainability factors into the project life-cycle. It is represented as a matrix and checklist which encourages consideration of social, economic, and environmental issues in projects. A case study was conducted in which an improved stove project in Honduras was evaluated using the framework. Results indicated areas of strength and weakness in project execution and highlighted potential improvements for future projects. The framework is also useful as a guide during project planning.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project-based education and portfolio assessments are at the forefront of educational research. This research follows the implementation of a project-based unit in a high school physics class. Students played the role of an engineering firm who designed, built and tested file folder bridges. The purpose was to determine if projectbased learning could improve student attitude toward science and related careers like engineering. Teams of students presented their work in a portfolio for a final assessment of the process of designing, building and testing their bridges.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this research is to investigate the consequences of sharing or using information generated in one phase of the project to subsequent life cycle phases. Sometimes the assumptions supporting the information change, and at other times the context within which the information was created changes in a way that causes the information to become invalid. Often these inconsistencies are not discovered till the damage has occurred. This study builds on previous research that proposed a framework based on the metaphor of ‘ecosystems’ to model such inconsistencies in the 'supply chain' of life cycle information (Brokaw and Mukherjee, 2012). The outcome of such inconsistencies often results in litigation. Therefore, this paper studies a set of legal cases that resulted from inconsistencies in life cycle information, within the ecosystems framework. For each project, the errant information type, creator and user of the information and their relationship, time of creation and usage of the information in the life cycle of the project are investigated to assess the causes of failure of precise and accurate information flow as well as the impact of such failures in later stages of the project. The analysis shows that the misleading information is mostly due to lack of collaboration. Besides, in all the studied cases, lack of compliance checking, imprecise data and insufficient clarifications hinder accurate and smooth flow of information. The paper presents findings regarding the bottleneck of the information flow process during the design, construction and post construction phases. It also highlights the role of collaboration as well as information integration and management during the project life cycle and presents a baseline for improvement in information supply chain through the life cycle of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Työmies translation project involves the translation of that newspaper’s accounts of significant events from Michigan’s 1913-1914 Copper Strike. Työmies was a Finnish-language newspaper, published in Hancock, Michigan, whose socialist-unionist perspective on the strike differed markedly from that of the local English-language newspapers. This project is the first time significant portions of Työmies have been translated into English. In June of 2013, the presenter printed the translation of the Työmies account of the strike’s first day on a hand-operated Chandler & Price platen press. Thus, the presentation describes this unique project: the translation itself, the presenter’s search for necessary type and equipment, and the printing of the broadsides. The presentation will include a history of Työmies and the Strike, with an emphasis on ways in which human culture and language is reflected in the material culture of printing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis represents the overview of hydrographic surveying and different types of modern and traditional surveying equipment, and data acquisition using the traditional single beam sonar system and a modern fully autonomous underwater vehicle, IVER3. During the thesis, the data sets were collected using the vehicles of the Great Lake Research Center at Michigan Technological University. This thesis also presents how to process and edit the bathymetric data on SonarWiz5. Moreover, the three dimensional models were created after importing the data sets in the same coordinate system. In these interpolated surfaces, the details and excavations can be easily seen on the surface models. In this study, the profiles are plotted on the surface models to compare the sensors and details on the seabed. It is shown that single beam sonar might miss some details, such as pipeline and quick elevation changes on the seabed when we compare to the side scan sonar of IVER3 because the single side scan sonar can acquire better resolution. However, sometimes using single beam sonar can save your project time and money because the single beam sonar is cheaper than side scan sonars and the processing might be easier than the side scan data.