Selecting an electrical power source at the scoping level for a mining project
Data(s) |
01/01/2012
|
---|---|
Resumo |
The electrical power source is a critical component of the scoping level study as the source affects both the project economics and timeline. This paper proposes a systematic approach to selecting an electrical power source for a new mine. Orvana Minerals Copperwood project is used as a case study. The Copperwood results show that the proposed scoping level approach is consistent with the subsequent much more detailed feasibility study. |
Formato |
application/pdf |
Identificador |
http://digitalcommons.mtu.edu/etds/542 http://digitalcommons.mtu.edu/cgi/viewcontent.cgi?article=1541&context=etds |
Publicador |
Digital Commons @ Michigan Tech |
Fonte |
Dissertations, Master's Theses and Master's Reports - Open |
Palavras-Chave | #Engineering #Mining Engineering |
Tipo |
text |