35 resultados para Audiovisual projects management

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to investigate the knowledge of school teachers about the emergency management of dental trauma, after an educational poster campaign. A total of 1000 questionnaires were sent to 100 schools in the area where the poster had been distributed. This was compared to another 100 schools (1000 questionnaires) in an area, Where the poster had not been distributed. The questionnaire surveyed demographic data, basic knowledge of emergency management of tooth fracture, luxation and avulsion injuries. A total of 511 questionnaires were returned (25.5%) and analyzed. Results showed differences between the two assessed areas. Teachers, who worked in the area with poster distribution, had better knowledge in handling tooth injuries. For the management of tooth fractures the portion of teachers, who knew the correct handling procedure, was 78.9% (area with poster campaign) vs 72.1% (area with no poster campaign), for the management of tooth luxation it was 87% vs 84% and for the management of tooth avulsion it was 71% vs 54%. In the area with the poster campaign 49% (n = 90 out of 185) of the teachers stated to have gained some knowledge about this topic beforehand. Out of these, 75 teachers (75/90 = 83%), had gained their information from the educational poster. Out of the 75 teachers, who had seen a poster on this topic, 68 (68/75 = 91%) would have managed such an emergency correctly. The present study shows the positive effect of educational poster campaigns. It therefore should encourage professionals in this field to embark on similar projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

When project managers determine schedules for resource-constrained projects, they commonly use commercial project management software packages. Which resource-allocation methods are implemented in these packages is proprietary information. The resource-allocation problem is in general computationally difficult to solve to optimality. Hence, the question arises if and how various project management software packages differ in quality with respect to their resource-allocation capabilities. None of the few existing papers on this subject uses a sizeable data set and recent versions of common software packages. We experimentally analyze the resource-allocation capabilities of Acos Plus.1, AdeptTracker Professional, CS Project Professional, Microsoft Office Project 2007, Primavera P6, Sciforma PS8, and Turbo Project Professional. Our analysis is based on 1560 instances of the precedence- and resource-constrained project scheduling problem RCPSP. The experiment shows that using the resource-allocation feature of these packages may lead to a project duration increase of almost 115% above the best known feasible schedule. The increase gets larger with increasing resource scarcity and with increasing number of activities. We investigate the impact of different complexity scenarios and priority rules on the project duration obtained by the software packages. We provide a decision table to support managers in selecting a software package and a priority rule.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Individual learning is central to the success of the transition phase in software mainte-nance offshoring projects. However, little is known on how learning activities, such as on-the-job training and formal presentations, are effectively combined during the tran-sition phase. In this study, we present and test propositions derived from cognitive load theory. The results of a multiple-case study suggest that learning effectiveness was highest when learning tasks such as authentic maintenance requests were used. Con-sistent with cognitive load theory, learning tasks were most effective when they imposed moderate cognitive load. Our data indicate that cognitive load was influenced by the expertise of the onsite coordinator, by intrinsic task complexity, by the degree of specifi-cation of tasks, and by supportive information. Cultural and semantic distances may in-fluence learning by inhibiting supportive information, specification, and the assignment of learning tasks.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The execution of a project requires resources that are generally scarce. Classical approaches to resource allocation assume that the usage of these resources by an individual project activity is constant during the execution of that activity; in practice, however, the project manager may vary resource usage over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and various work-content-related constraints are met. We formulate this problem for the first time as a mixed-integer linear program. Our computational results for a standard test set from the literature indicate that this model outperforms the state-of-the-art solution methods for this problem.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The benefits companies achieve by implementing an ERP system vary considerably. Many companies need to adapt their ERP integration solution in the post-implementation stage. But after the completion of such a usually very complex integration project, benefits do not emerge by all means. A misfit between the organization and the IS, especially the aspect of cross-functional team collaboration, could explain these divergences. Using an initial theoretical framework, we conducted a single case study to explore the team-oriented perceptions in a post-implementation ERP integration project. To analyze the benefits and the influences in greater depth we disentangled the integration benefits into their particular parts (process, system and information quality). Our findings show that post-implementation ERP integration changes are not always perceived as beneficiary by the involved teams and that cross-functional collaboration has an important influence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The increasing practice of offshore outsourcing software maintenance has posed the challenge of effectively transferring knowledge to individual software engineers of the vendor. In this theoretical paper, we discuss the implications of two learning theories, the model of work-based learning (MWBL) and cognitive load theory (CLT), for knowledge transfer during the transition phase. Taken together, the theories suggest that learning mechanisms need to be aligned with the type of knowledge (tacit versus explicit), task characteristics (complexity and recurrence), and the recipients’ expertise. The MWBL proposes that learning mechanisms need to include conceptual and practical activities based on the relative importance of explicit and tacit knowledge. CLT explains how effective portfolios of learning mechanisms change over time. While jobshadowing, completion tasks, and supportive information may prevail at the outset of transition, they may be replaced by the work on conventional tasks towards the end of transition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The global World Overview of Conservation Approaches and Technologies (WOCAT) initiative has developed standardised tools and methods to compile and evaluate knowledge available about SLM. This knowledge is now combined and enriched with audiovisual information in order to give a voice to land users, reach a broad range of stakeholders, and assist in scaling up SLM to reverse trends of degradation, desertification, and drought. Five video products, adapted to the needs of different target groups, are created and embedded in already existing platforms for knowledge sharing of SLM such as the WOCAT database and Google Earth application. A pilot project was carried out in Kenya and Tajikistan to verify ideas and tools while at the same time assessing the usefulness of the suggested products on the ground. Video has the potential to bridge the gap between different actor groups and enable communication and sharing on different levels and scales: locally, regionally, and globally. Furthermore, it is an innovative tool to link local and scientific knowledge, raise awareness, and support advocacy for SLM. Keywords: Sustainable Land Management (SLM), knowledge sharing, audiovisual messages, video, World Overview of Conservation Approaches and Technologies (WOCAT)