A Serial Scheme for Minimizing the Duration of Resource-Constrained Projects within Microsoft Project
Data(s) |
2011
|
---|---|
Formato |
application/pdf |
Identificador |
http://boris.unibe.ch/39383/1/06118045.pdf Trautmann, Norbert; Brandinu, Gianluca (2011). A Serial Scheme for Minimizing the Duration of Resource-Constrained Projects within Microsoft Project. In: Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 893-897). IEEE 10.1109/IEEM.2011.6118045 <http://dx.doi.org/10.1109/IEEM.2011.6118045> doi:10.7892/boris.39383 info:doi:10.1109/IEEM.2011.6118045 |
Idioma(s) |
eng |
Publicador |
IEEE |
Relação |
http://boris.unibe.ch/39383/ |
Direitos |
info:eu-repo/semantics/restrictedAccess |
Fonte |
Trautmann, Norbert; Brandinu, Gianluca (2011). A Serial Scheme for Minimizing the Duration of Resource-Constrained Projects within Microsoft Project. In: Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 893-897). IEEE 10.1109/IEEM.2011.6118045 <http://dx.doi.org/10.1109/IEEM.2011.6118045> |
Palavras-Chave | #650 Management & public relations |
Tipo |
info:eu-repo/semantics/conferenceObject info:eu-repo/semantics/publishedVersion PeerReviewed |