19 resultados para project management, construction projects, Brunei

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Confirming the Brazilian tendency in the field, the multifamily vertical condominium habitats in Natal are defined as buildings with three or more floors which have been an increasingly used solution. In the mentioned project, the connection between the projectarchitects and the user/ buyers are spread out, by which the first people conceive the realestate property as a creation for the market and not the individual client in specific. Such situation along with technical and financial limitations of the project lead to the adoption of standard solutions to be utilized by clients with different profiles. Besides that, there are various legal and urban parameters by the City Director Plan showing elements of great influence in the final solution adopted by the mentioned edifices. Moving to this subject in general, this project is focused on the case study of the Ed. Ville de Montpellier, having as a base of Post Occupancy Evaluation (POE), considered an efficient tool to analyze and keep up with the progress of the construction of the building, including technical approvals, the application of surveys with the local residents and the creation of informal interviews. The data shows that with time some items that initially motivated the acquisition of the realestate property (with a social common area) move to being less valued, and that the residents quickly alter the pre constructed space, thus seeking to alter the property in a more personal and conforming manner. The possibility of a new emphasis for projects on the mentioned space should also be in discussion, the created project calls for the attention of projected conceptual aspects and interdependence within project and construction which permits the indication of some recommendations for the projection of multifamily residential buildings within the studied realm

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Until the early 90s, the simulation of fluid flow in oil reservoir basically used the numerical technique of finite differences. Since then, there was a big development in simulation technology based on streamlines, so that nowadays it is being used in several cases and it can represent the physical mechanisms that influence the fluid flow, such as compressibility, capillarity and gravitational segregation. Streamline-based flow simulation is a tool that can help enough in waterflood project management, because it provides important information not available through traditional simulation of finite differences and shows, in a direct way, the influence between injector well and producer well. This work presents the application of a methodology published in literature for optimizing water injection projects in modeling of a Brazilian Potiguar Basin reservoir that has a large number of wells. This methodology considers changes of injection well rates over time, based on information available through streamline simulation. This methodology reduces injection rates in wells of lower efficiency and increases injection rates in more efficient wells. In the proposed model, the methodology was effective. The optimized alternatives presented higher oil recovery associated with a lower water injection volume. This shows better efficiency and, consequently, reduction in costs. Considering the wide use of the water injection in oil fields, the positive outcome of the modeling is important, because it shows a case study of increasing of oil recovery achieved simply through better distribution of water injection rates

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The process of urbanization in recent decades has generated considerable seriousness of problems relating to the use and occupation physical environment of cities. The concentration of population, economic activities and technological standards have reinforced an existing urban environment highly degraded as a consequence of the development style that leads to the predatory use of natural resources. In this context, cities as centers of production and consumption, have the most serious problems of environmental degradation. This study investigated the impacts of the municipal building projects to large-scale vertical in the town of Vila de Ponta Negra, Natal-RN, given the proximity to the Environmental Protection Area (ZPA-6) and considering its environmental importance , scenic, landscape and tourism for the city of Natal-RN. The fragility of the licensing process and the failure of the assumptions in the analysis, objective and subjective, for the granting of environmental permits for the building construction projects, specifically those set out in the surroundings of the Environmental Protection Area (ZPA-6) and fundamental importance of landscape and tourism for the city of Natal, has aroused the concern of local people in and of itself the Government, faced with the probable impacts that will affect greatly the Vila de Ponta Negra. The methodology used to achieve the intended objectives will be the literature review, questionnaire to the surrounding population and the Government, as well as findings on the spot, through the photographic record. The beneficiaries of the license, if the entrepreneurs, have been affected because of the granting of licensing act of investing large amount of capital in the works. Additionally, with distrust of the population, since they are to discredit the public system of environmental management have guessed by the probability of imbalance to the environment and structural damage to the Vila de Ponta Negra, where such failure to support energy, lack of regular supply of water , lack of sanitation and access roads sufficient for the flow of motor vehicles in these areas, among other factors. Thus, this work will contribute to the diagnosis and solutions to the problem in question, so that the Government will effectively fulfill its social management of ecologically balanced environment of continuing urban development in Natal, Brazil

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this dissertation is to formulate guidelines for the improvement of maturity models, or the development of new ones, aiming at its application to project departments. The maturity of project management has become critical for organizations that develop projects and want to stand out in the market they serve. For this purpose, maturity models provide paths in order to guarantee that the institutionalization of project management is achieved in the best possible way. Generally, these models assess the organization, define its current situation in managing projects and propose steps to be performed in the search of more advanced levels of maturity. With the objective of contributing to the improvement of maturity models for specific cases, a bibliographical research was conducted for the preparation of a comparative analysis matrix and performed a case study for application of two maturity models (MMGP and PMMM levels 2 and 3), selected based on criteria found in the literature, in an engineering department of an oil company. The case study supported the realization of a comparative analysis of models, from which guidelines were formulated for improvement. The results showed that thedepartment is evaluated in a medium stage of maturity, recording significant progress in some dimensions assessed. They also found that the results of applying the two models are presented as complementary, although the model is highlighted by the greater depth of MMGP diagnostic, considering many variables in their levels of maturity than model PMMM (levels 2 and 3).Finally, directions have been formulated that contribute to the improvement of maturity models, taking in account the organizational environment in which this work was developed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paperwork attempts to measure the project management maturity in the State Department of Taxation in Rio Grande do Norte. Project management has shown to be a critical component to any organization success, as the projects are directly related to a set of activities resulting into organizational innovations such as products, services and processes; and its improvement is directly aligned with the strategic management. Methodologically, this paperwork uses both a quantitative and qualitative approach that will be applied to the coordinators, sub-coordinators, and directors of the Regional Offices of the State Department of Taxation. In the theoretical reference it is about the public management and analyzes the strategic management in contemporary public administration. Presents the maturity in project management is by discussing the main models: CMM, Capability Maturity Model; PMMM, Project Management Maturity Model; OPM3, Organization Project Maturity Model and the Prado-MMGP, Modelo de Maturidade em Gerenciamento de Projetos. From this analysis, considering attributes as an aid in taking strategic positioning, access to the model, possibility of benchmarking and continuous improvement, the Prado-MMGP model was the most appropriate for this research process. It has been proved that the State Department of Taxation shows a very low project management maturity level. Regarding the acceptance of the maturity dimensions by the State Department, it is still in an early developmental stage, as one of the dimensions showed a poor performance while the rest showed a regular one. In contrast with similar organizations, the maturity results have shown to be below the national average. The maturity assessment enables in the institution the implementation of a plan for institutional growth with the creation of sector strategic and project management

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aimed to analyse the factors that can contribute to the support of residents in the process of management of environmental tourism projects. The importance of reflecting on the municipal planning, including the management of stakeholders, is justified by changes in economic and social values of local communities, the concern with their space and quality of life. Thus, the support of the dwellers to the management process of an attractive allows motivate and prioritize the opinion of this community, strengthening social groups and integrating them into projects and local actions. The study was described as descriptive, exploratory and quantitative. As the analysis model. They were used the research variables done by Nunkoo and Ramkissoon (2012), as a way to assess the support of local dwellers on the development of Revitalization project of Monumento Natural Vale dos Dinossauros, in the management of environmental tourist destination, in Sousa/PB. Results show the relationship among the dimensions, confidence in government agencies, benefits and costs occasioned by tourism development in the attractive as influencers support elements of the deweller. Thus, it is intended to corroborate to the inclusion of stakeholdersin the planning process in the development of tourism in this location in order to involve them in decision making about planning and management of tourism in the city, with a view to sustainable local development

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays the search for growth makes organizations seeking competitive advantages, project management shares this goal, through techniques that assist in the search for an improved management of the various fields of knowledge through a design methodology. The world is driven by projects and the search for ways to better manage activities such as time, cost and term towards the success of a particular project is something constant. A major contribution that IT can make to the health sector is the support for the management area. IT can integrate processes, optimize the interconnection between the various sectors, make hospitals have access to inside information of good quality, as well as support in the healthcare area, sharing pictures, uniting the various aspects of nursing and nursing service. The major challenge faced by the SESAP Information Technology sector at present is in project management in IT , which does not exist makes investments in the area are increasingly difficult due to this deficiency in management develop their own systems without cost additional to the State. This study seeks to build and strengthen the Project Management within the Department of Health through the implementation of a project office that will manage the final result of this work methodology based on PMBOK, and still show the functionality applied to development the state Hospital Management System that will later be installed on all Regional Health Units and proposing measures for the sustainability and development of the sector amid the difficulties of the current public service. Such action will result in a savings of more than R$ 107,000.00 (one hundred seven thousand) regarding spending private software currently used by the assignment of invested by the State of Rio Grande do Norte user licenses, representing more than 5 % of the total budget of the State Department of Public Health of the State

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Given the growth demand for air transport allied to the need of adequacy of the infrastructure of the airports the need arises for the elaboration and Project Deployment enhancements to to the administrative management with efficiency and effectiveness of processes. The present dissertation aims to develop an organizational and operational proposal to management improvement projects an airport midsize business. The state of art literature contemplated the following topics: project management, project office; improvement approaches; improvement projects and technical and support improvement projects and project management tools. The research method is characterized as a case study of a qualitative nature. The validation of the proposal was carried out through a focus group with the participation twelve representatives of the administrative areas of an airport-sized Brazilian midfielder with the objective of validate the proposed organizational structure and operational procedures and to identify the barriers to implementation of the proposal. The result of the work presents an proposed considering the integration of the project office with the organizational structure of the administration, the conception of the project office, operating procedures and the directives for implementation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Confirming the Brazilian tendency in the field, the multifamily vertical condominium habitats in Natal are defined as buildings with three or more floors which have been an increasingly used solution. In the mentioned project, the connection between the projectarchitects and the user/ buyers are spread out, by which the first people conceive the realestate property as a creation for the market and not the individual client in specific. Such situation along with technical and financial limitations of the project lead to the adoption of standard solutions to be utilized by clients with different profiles. Besides that, there are various legal and urban parameters by the City Director Plan showing elements of great influence in the final solution adopted by the mentioned edifices. Moving to this subject in general, this project is focused on the case study of the Ed. Ville de Montpellier, having as a base of Post Occupancy Evaluation (POE), considered an efficient tool to analyze and keep up with the progress of the construction of the building, including technical approvals, the application of surveys with the local residents and the creation of informal interviews. The data shows that with time some items that initially motivated the acquisition of the realestate property (with a social common area) move to being less valued, and that the residents quickly alter the pre constructed space, thus seeking to alter the property in a more personal and conforming manner. The possibility of a new emphasis for projects on the mentioned space should also be in discussion, the created project calls for the attention of projected conceptual aspects and interdependence within project and construction which permits the indication of some recommendations for the projection of multifamily residential buildings within the studied realm

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Until the early 90s, the simulation of fluid flow in oil reservoir basically used the numerical technique of finite differences. Since then, there was a big development in simulation technology based on streamlines, so that nowadays it is being used in several cases and it can represent the physical mechanisms that influence the fluid flow, such as compressibility, capillarity and gravitational segregation. Streamline-based flow simulation is a tool that can help enough in waterflood project management, because it provides important information not available through traditional simulation of finite differences and shows, in a direct way, the influence between injector well and producer well. This work presents the application of a methodology published in literature for optimizing water injection projects in modeling of a Brazilian Potiguar Basin reservoir that has a large number of wells. This methodology considers changes of injection well rates over time, based on information available through streamline simulation. This methodology reduces injection rates in wells of lower efficiency and increases injection rates in more efficient wells. In the proposed model, the methodology was effective. The optimized alternatives presented higher oil recovery associated with a lower water injection volume. This shows better efficiency and, consequently, reduction in costs. Considering the wide use of the water injection in oil fields, the positive outcome of the modeling is important, because it shows a case study of increasing of oil recovery achieved simply through better distribution of water injection rates

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the validation of the Performance Indicator System for Projects under Construction - SIDECC. The goal was to develop a system of performance indicators from the macroergonômica approach, considering criteria of usefulness, practicality and applicability and the concept of continuous improvement in the construction industry. The validation process SIDECC consisted of three distinct models. Modeling I corresponded to the theoretical development and validation of a system of indicators. Modeling II concerns the development and validation of multi- indicator system. For this modeling, we used the Mother of Use and Importance and Multivariate Analysis. Modeling III corresponded to the validation situated, which consisted of a case study of a work of construction of buildings, which were applied and analyzed the results of modeling II. This work resulted in the development of an applied and tested for the construction of an integrated system of performance indicators methodology, involving aspects of production, quality, environmental, health and safety. It is inferred that the SIDECC can be applied, in full or in part, the construction companies as a whole, as well as in other economic sectors