11 resultados para Airports. System dynamics. Capacity management. Passenger demand

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The importance of the airport sector in the development of a country refers to the need for studies on management of airports, to aid the process of decision making. In Brazil, growth in passenger demand is why investments in order to balance the capacity of an airport with air demand. Thus, the study aims to develop a model for Dynamic Systems able to assist airport management in Brazilian sizing subsystems an airport (Passenger Terminal, Runway and Patio). The methodology of this work consists in the steps of defining the problem, formulating the hypothesis dynamic building simulation model, and validation experiments. Finally, we examined the status of each subsystem in thirteen Brazilian airports in scenarios current, most likely and optimistic for air passenger demand

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing competitiveness of the construction industry, set in an economic environment in which the offer is now greater than the demand , causes the prices of many products and services, are strongly influenced by the processes of production and the final consumer. Thus, to become more competitive in the market and construction companies are seeking new alternatives to reduce and control costs, production processes and tools that allow for close monitoring of the construction schedule, with the consequent compliance deadline with the client. Based on this scenario, the creation of control tools, service management and planning work emerges as an investment opportunity and an area that can promote great benefits to construction companies. The goal of this work is to present a system of planning, service management and costs control that through worksheets provide information relating to the production phase of the work, allowing the visualization of possible irregularities in the planning and cost of the enterprise, enabling the company to take steps to achieve the goals of the enterprise in question, and correct them when necessary. The developed system has been used in a piece of real estate in Rio Grande do Norte, and the results showed that its use together allowed the construction company to accompany their results and take corrective and preventive actions during the production process, efficiently and effective

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The opening of the Brazilian market of electricity and competitiveness between companies in the energy sector make the search for useful information and tools that will assist in decision making activities, increase by the concessionaires. An important source of knowledge for these utilities is the time series of energy demand. The identification of behavior patterns and description of events become important for the planning execution, seeking improvements in service quality and financial benefits. This dissertation presents a methodology based on mining and representation tools of time series, in order to extract knowledge that relate series of electricity demand in various substations connected of a electric utility. The method exploits the relationship of duration, coincidence and partial order of events in multi-dimensionals time series. To represent the knowledge is used the language proposed by Mörchen (2005) called Time Series Knowledge Representation (TSKR). We conducted a case study using time series of energy demand of 8 substations interconnected by a ring system, which feeds the metropolitan area of Goiânia-GO, provided by CELG (Companhia Energética de Goiás), responsible for the service of power distribution in the state of Goiás (Brazil). Using the proposed methodology were extracted three levels of knowledge that describe the behavior of the system studied, representing clearly the system dynamics, becoming a tool to assist planning activities

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present work aimed the elaboration of an environmental study focused on the hotel sector in order to present an analysis of the environmental aspects of Ponta Negra Beach, in Natal, RN, Brazil and also the aspects of the small and medium hotels existing in this area. By means of this work, it is possible to elaborate a model of a simplified System of Environmental Management which can attend to the exigencies required by NBR ISO 14001: 2004, as well as to present economical viability and possibility to be implemented in a way that hotels may converge to the sustainable environmental development of the tourism in Ponta Negra Beach. The research methodology presents itself divided into three items: execution of the environmental characterization of Ponta Negra Beach, by way of technical visits and interpretation of satellite images and cartograms of the main environmental characteristics of the region; execution of the work already made concerning the development, application and interpretation of the evaluation of the environmental aspects of each hotel, considering the hotels and the period of data collection, these used in evaluation, research instrument and a description of the procedure utilized for the analysis of the collected data and the utilized methodology for the elaboration of a model of a simplified System of Environmental Management. In a general way, it has been concluded that the practices executed by hotels in Ponta Negra Beach are impact-like and harmful to the environment. The simple implementation of analysis procedures and control of the environmental aspects could suggestively contribute to the reduction of environmental impacts promoted by the hotel section at this beach and in the nearby areas. It had been noticed that the study contributed to the sensitization of managers concerning the environmental problems since, in many other times, the detected problem was, in fact, the non-acquaintance about the environmental aspects and impacts from those hotels administrators, because of the lack of surveys and studies about the theme. It had also been noticed the arousing of a possible environmental attitude from some managers

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The process of urbanization in recent decades has generated considerable seriousness of problems relating to the use and occupation physical environment of cities. The concentration of population, economic activities and technological standards have reinforced an existing urban environment highly degraded as a consequence of the development style that leads to the predatory use of natural resources. In this context, cities as centers of production and consumption, have the most serious problems of environmental degradation. This study investigated the impacts of the municipal building projects to large-scale vertical in the town of Vila de Ponta Negra, Natal-RN, given the proximity to the Environmental Protection Area (ZPA-6) and considering its environmental importance , scenic, landscape and tourism for the city of Natal-RN. The fragility of the licensing process and the failure of the assumptions in the analysis, objective and subjective, for the granting of environmental permits for the building construction projects, specifically those set out in the surroundings of the Environmental Protection Area (ZPA-6) and fundamental importance of landscape and tourism for the city of Natal, has aroused the concern of local people in and of itself the Government, faced with the probable impacts that will affect greatly the Vila de Ponta Negra. The methodology used to achieve the intended objectives will be the literature review, questionnaire to the surrounding population and the Government, as well as findings on the spot, through the photographic record. The beneficiaries of the license, if the entrepreneurs, have been affected because of the granting of licensing act of investing large amount of capital in the works. Additionally, with distrust of the population, since they are to discredit the public system of environmental management have guessed by the probability of imbalance to the environment and structural damage to the Vila de Ponta Negra, where such failure to support energy, lack of regular supply of water , lack of sanitation and access roads sufficient for the flow of motor vehicles in these areas, among other factors. Thus, this work will contribute to the diagnosis and solutions to the problem in question, so that the Government will effectively fulfill its social management of ecologically balanced environment of continuing urban development in Natal, Brazil

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The changes that have taken place in the organizational environment in recent decades have led to new performance measurement systems being proposed, given the inadequacy of traditional models. The Balanced Scorecard (BSC) emerged as an instrument to translate financial and non-financial assets into real values for all interested parties in the organization, allowing the introduction of strategies to achieve the desired goals. Research shows that most errors committed with the use of this method are related to the implementation process. Thus, the aim of this dissertation is to analyze the process of building and implementing the BSC in an organization. This empirical exploratory study is based on the classic case study method, which enables the researcher to work with a set of evidence, including direct observation, interviews and document analysis. The results show that the use of BSC in the company investigated posed problems during the process of building and implementing the method. These problems were caused mainly by the lack of involvement on the part of upper management and the team s scant knowledge of Balanced Scorecard. One of the gains obtained from adopting the system was the introduction and/or consolidation of a culture of strategic planning and participative management. The continuous implementation phase was highlighted in the monitoring program, created by the organization in an attempt to reverse existing problems, using the BSC as a third generation strategic management system, which led to significant gains, better use of the system and stronger management practices

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The structure of Industrial Automation bases on a hierarchical pyramid, where restricted information islands are created. Those information islands are characterized by systems where hardware and software used are proprietors. In other words, they are supplied for just a manufacturer, doing with that customer is entailed to that supplier. That solution causes great damages to companies. Once the connection and integration with other equipments, that are not of own supplier, it is very complicated. Several times it is impossible of being accomplished, because of high cost of solution or for technical incompatibility. This work consists to specify and to implement the visualization module via Web of GERINF. GERINF is a FINEP/CTPetro project that has the objective of developing a software for information management in industrial processes. GERINF is divided in three modules: visualization via Web, compress and storage and communication module. Are presented results of the utilization of a proposed system to information management of a Natural Gas collected Unit of Guamar´e on the PETROBRAS UN-RNCE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Attacks to devices connected to networks are one of the main problems related to the confidentiality of sensitive data and the correct functioning of computer systems. In spite of the availability of tools and procedures that harden or prevent the occurrence of security incidents, network devices are successfully attacked using strategies applied in previous events. The lack of knowledge about scenarios in which these attacks occurred effectively contributes to the success of new attacks. The development of a tool that makes this kind of information available is, therefore, of great relevance. This work presents a support system to the management of corporate security for the storage, retrieval and help in constructing attack scenarios and related information. If an incident occurs in a corporation, an expert must access the system to store the specific attack scenario. This scenario, made available through controlled access, must be analyzed so that effective decisions or actions can be taken for similar cases. Besides the strategy used by the attacker, attack scenarios also exacerbate vulnerabilities in devices. The access to this kind of information contributes to an increased security level of a corporation's network devices and a decreased response time to occurring incidents

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Annular flow is the prevailing pattern in transport and energy conversion systems and therefore, one of the most important patterns in multiphase flow in ducts. The correct prediction of the pressure gradient and heat transfer coefficient is essential for optimizing the system s capacity. The objective of this work is to develop and implement a numerical algorithm capable of predicting hydrodynamic and thermal characteristics for upflow, vertical, annular flow. The numerical algorithm is then complemented with the physical modeling of phenomena that occurs in this flow pattern. These are, turbulence, entrainment and deposition and phase change. For the development of the numerical model, axial diffusion of heat and momentum is neglected. In this way the time-averaged equations are solved in their parabolic form obtaining the velocity and temperature profiles for each axial step at a time, together with the global parameters, namely, pressure gradient, mean film thickness and heat transfer coefficient, as well as their variation in the axial direction. The model is validated for the following conditions: fully-developed laminar flow with no entrainment; fully developed laminar flow with heat transfer, fully-developed turbulent flow with entrained drops, developing turbulent annular flow with entrained drops, and turbulent flow with heat transfer and phase change

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present work was carried through in the Grossos city - RN and had as main objectives the elaboration of an physicist-ambient, socioeconomic survey and execution a multisecular evaluation of 11 years, between 1986 and 1996, using remote sensing products, to evaluate the modifications of the land use, aiming at the generation of an information database to implementation a geographical information system (GIS) to management the this city. For they had been in such a way raised given referring the two Demographic Censuses carried through by the IBGE (1991 and 2000) and compared, of this form was possible to the accomplishment of an evaluation on the demographic aspects (degree of urbanization, etária structure, educational level) and economic (income, habitation, vulnerability, human development). For the ambient physical survey the maps of the natural resources had been confectioned (simplified geology, hydrography, geomorphologi, veget covering, ground association, use and occupation), based in comments of field and orbital products of remote sensoriamento (images Spot-HRVIR, Landsat 5-TM and IKONOS - II), using itself of techniques of digital picture processing. The survey of these data and important in the identification of the potentialities and fragilities of found ecosystems, therefore allows an adequate planning of the partner-economic development by means of an efficient management. The project was part of a partnership between the Grossos city hall the municipal City hall of Grossos - RN and the Geoscience post-graduate program of the UFRN, more specifically the Geomatica laboratory LAGEOMA

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays, as well as in the past decades, the dumping of biodegradable organic waste in landfill is common practice in Brazil, as well as in most parts of the world. Nevertheless due to its rapid decomposition and release of odors, this practice hamper’s the operation and implementation of a recycling system. These facts encouraged our research to find an efficient system for the management of organic waste, not only for the use of official workers responsible for managing these wastes, but also for non-governmental institutions. The Recycling for Life Community Association – ACREVI (Associação Comunitária Reciclando para a Vida), together with the municipal authorities of Mossoró-RN, Brazil, have assumed the social role of collecting and recycling solid waste produced by most of the local population. However, it was observed that the organic waste it collected was not receiving any treatment. This present work aims to make compost with mixed waste (green waste and organic household), and then do chemical analysis of the material in view to use the waste as organic fertilizer. The objective being: to share the knowledge acquired by putting it into a very simple language accessible to people with little education. The experiment was conducted at ACREVI, Mossoró (RN), and the compost was obtained following the method "windrow", forming three cells (I, II, III) with conical shape, dimensions of 1.6 meters and 2.0 meters in diameter for cells I and II, and 1.0 meters high and 2.0 meters in diameter for cell III. The process was accompanied by analysis: CHN elemental, a variation of cell temperature, humidity, pH, TKN, bulk density, nutrients and heavy metals. Stabilized organic compounds reached the C/N ratio of 10.4/1 cell I and 10.4/1 in the cell II in the cell, showing how good soil conditions, with potential to improve the physical properties of any soil and pH acid soils, has presented the cell III at the end of the process the C/N 26/1, is a high ratio may be associated with the stack size III, thus changing the optimal conditions for the occurrence of the process. The levels of heavy metals in the analyzed compounds were lower than those established by the SDA normative instruction, Nº 27, of 5 June, 2006. The use of pruning trees and grass are used in small-scale composting, while generating a quality compost in the final process, it also created an important condition for a correct sizing of the composting piles. Under the studied conditions it is not advisable to use cells with a height of 1.00 m in height and 2.00 m in diameter, as these do not prevent the rapid dissipation of heat and thus can not be a good product at the end of composting. The composting process in the shed of the association and the preparation of the primer enabled the development of an alternative technology to generate income for members of ACREVI.