16 resultados para project delay estimation

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The objective of this Master’s thesis is to develop a model which estimates net working capital (NWC) monthly in a year period. The study is conducted by a constructive research which uses a case study. The estimation model is designed in the need of one case company which operates in project business. Net working capital components should be linked together by an automatic model and estimated individually, including advanced components of NWC for example POC receivables. Net working capital estimation model of this study contains three parts: output template, input template and calculation model. The output template gets estimate values automatically from the input template and the calculation model. Into the input template estimate values of more stable NWC components are inputted manually. The calculate model gets estimate values for major affecting components automatically from the systems of a company by using a historical data and made plans. As a precondition for the functionality of the estimation calculation is that sales are estimated in one year period because the sales are linked to all NWC components.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tutkimus keskittyy hankintatoimen kehittämiseen osana laitosprojektien toteutusta. Työ pohjautuu empiiriseltä taustaltaan Pöyry Oyj:n projektiliiketoimintaan ja työn tarkastelunäkökulmaksi onvalittu projektihallinnosta vastaavan yrityksen näkökulma. Tutkimus on hyvin käytännönläheinen ¿ se lähtee hankinnan ja sen seurannan ongelmista ja pyrkii tarjoamaan niihin uudenlaisia ratkaisuja. Pohjimmiltaan tutkimus kuuluu teollisuustalouden piiriin, vaikka tietojärjestelmätieteellä on vahva tukirooli. Työn tavoitteet ja tulokset liittyvät teollisuustaloudelle ominaisesti yrityksen toiminnan kehittämiseen, käytetyt välineet ja ratkaisut puolestaan hyödyntävät tietojärjestelmätieteen antamia mahdollisuuksia. Tutkimuksessa on käytetty konstruktiivista tutkimusotetta, jonka mukaisesti on luotu innovatiivisia konstruktioita ratkaisemaan aitoja reaalimaailman ongelmia ja tätä kautta tuotettu kontribuutioita teollisuustaloudelle. Tavoitteena oli järjestää hankintatoimi ja sen seuranta suurissa laitosprojekteissa tehokkaammin. Tätä varten uudistettiin ensin projektihallinnon ja hankintatoimen toimintaohjeet vastaamaan paremmin nykyajan vaatimuksia. Toimintaohjeiden perusteella ryhdyttiin toteuttamaan hankintaohjelmistoa, joka pystyisi kattamaan kaikki toimintaohjeissa kuvatut piirteet. Lopulta hankintaohjelmisto toi mukanaan uusia piirteitä projektihallintoon ja hankintatoimeen ja nämä sisällytettiin toimintaohjeisiin. Tähän kehitystyöhön ryhdyttiin, jotta laitosprojektien projektihallinto ja hankintatoimi toimisivat paremmin, eli pienemmin kustannuksin tuottaen projekteissa tarvittavat tulokset nopeammin, tarkemmin ja laadukkaammin. Tutkimuksella on kolmenlaisia tuloksia: hankintatoimen parannetut metodit, hankintaohjelmiston pohjana olevat toiminta- ja laskentamallit sekä implementaationa hankintasovellus. Uudistetut projekti- ja hankintaohjeet kuvaavat hankintatoiminnan parannettuja metodeja. Hankintaohjelmistoasuunnitellessa ja kehitettäessä tehdyt kuvaukset sisältävät uusia malleja niin hankintaprosessille kuin hankinnan seuraamiseksi suurissa laitosprojekteissa. Itse ohjelmisto on tuloksena implementaatio, joka perustuu parannettuihin hankintametodeihin ja uusiin toiminta- ja laskentamalleihin. Uudistetut projekti- ja hankintaohjeet ovat olleet käytössä Pöyry Oyj:ssä vuodesta 1991. Vuosien varrella nämä toimintaohjeet ovat auttaneet ja tukeneet satojen laitosprojektientoteutusta ja ylläpitäneet Pöyry Oyj:n kilpailukykyä kansainvälisenä projektitalona. Hankintasovellus puolestaan on ollut käytössä useissa projekteissa ja sen on havaittu pienentävän hankintatoimen suoria työkustannuksia laitosprojekteissa. Sovelluksen katsotaan myös tuovan epäsuoria kustannussäästöjä parempien hankintapäätösten muodossa, mutta näiden säästöjen suuruutta ei pystytä luotettavasti arvioimaan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Software engineering is criticized as not being engineering or 'well-developed' science at all. Software engineers seem not to know exactly how long their projects will last, what they will cost, and will the software work properly after release. Measurements have to be taken in software projects to improve this situation. It is of limited use to only collect metrics afterwards. The values of the relevant metrics have to be predicted, too. The predictions (i.e. estimates) form the basis for proper project management. One of the most painful problems in software projects is effort estimation. It has a clear and central effect on other project attributes like cost and schedule, and to product attributes like size and quality. Effort estimation can be used for several purposes. In this thesis only the effort estimation in software projects for project management purposes is discussed. There is a short introduction to the measurement issues, and some metrics relevantin estimation context are presented. Effort estimation methods are covered quite broadly. The main new contribution in this thesis is the new estimation model that has been created. It takes use of the basic concepts of Function Point Analysis, but avoids the problems and pitfalls found in the method. It is relativelyeasy to use and learn. Effort estimation accuracy has significantly improved after taking this model into use. A major innovation related to the new estimationmodel is the identified need for hierarchical software size measurement. The author of this thesis has developed a three level solution for the estimation model. All currently used size metrics are static in nature, but this new proposed metric is dynamic. It takes use of the increased understanding of the nature of the work as specification and design work proceeds. It thus 'grows up' along with software projects. The effort estimation model development is not possible without gathering and analyzing history data. However, there are many problems with data in software engineering. A major roadblock is the amount and quality of data available. This thesis shows some useful techniques that have been successful in gathering and analyzing the data needed. An estimation process is needed to ensure that methods are used in a proper way, estimates are stored, reported and analyzed properly, and they are used for project management activities. A higher mechanism called measurement framework is also introduced shortly. The purpose of the framework is to define and maintain a measurement or estimationprocess. Without a proper framework, the estimation capability of an organization declines. It requires effort even to maintain an achieved level of estimationaccuracy. Estimation results in several successive releases are analyzed. It isclearly seen that the new estimation model works and the estimation improvementactions have been successful. The calibration of the hierarchical model is a critical activity. An example is shown to shed more light on the calibration and the model itself. There are also remarks about the sensitivity of the model. Finally, an example of usage is shown.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Työn tavoitteena oli kehittää tutkittavan insinööriyksikön projektien kustannusestimointiprosessia, siten että yksikön johdolla olisi tulevaisuudessa käytettävänään tarkempaa kustannustietoa. Jotta tämä olisi mahdollista, ensin täytyi selvittää yksikön toimintatavat, projektien kustannusrakenteet sekä kustannusatribuutit. Tämän teki mahdolliseksi projektien kustannushistoriatiedon tutkiminen sekä asiantuntijoiden haastattelu. Työn tuloksena syntyi kohdeyksikön muiden prosessien kanssa yhteensopiva kustannusestimointiprosessi sekä –malli.Kustannusestimointimenetelmän ja –mallin perustana on kustannusatribuutit, jotka määritellään erikseen tutkittavassa ympäristössä. Kustannusatribuutit löydetään historiatietoa tutkimalla, eli analysoimalla jo päättyneitä projekteja, projektien kustannusrakenteita sekä tekijöitä, jotka ovat vaikuttaneet kustannusten syntyyn. Tämän jälkeen kustannusatribuuteille täytyy määritellä painoarvot sekä painoarvojen vaihteluvälit. Estimointimallin tarkuutta voidaan parantaa mallin kalibroinnilla. Olen käyttänyt Goal – Question – Metric (GQM) –menetelmää tutkimuksen kehyksenä.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sensor-based robot control allows manipulation in dynamic environments with uncertainties. Vision is a versatile low-cost sensory modality, but low sample rate, high sensor delay and uncertain measurements limit its usability, especially in strongly dynamic environments. Force is a complementary sensory modality allowing accurate measurements of local object shape when a tooltip is in contact with the object. In multimodal sensor fusion, several sensors measuring different modalities are combined to give a more accurate estimate of the environment. As force and vision are fundamentally different sensory modalities not sharing a common representation, combining the information from these sensors is not straightforward. In this thesis, methods for fusing proprioception, force and vision together are proposed. Making assumptions of object shape and modeling the uncertainties of the sensors, the measurements can be fused together in an extended Kalman filter. The fusion of force and visual measurements makes it possible to estimate the pose of a moving target with an end-effector mounted moving camera at high rate and accuracy. The proposed approach takes the latency of the vision system into account explicitly, to provide high sample rate estimates. The estimates also allow a smooth transition from vision-based motion control to force control. The velocity of the end-effector can be controlled by estimating the distance to the target by vision and determining the velocity profile giving rapid approach and minimal force overshoot. Experiments with a 5-degree-of-freedom parallel hydraulic manipulator and a 6-degree-of-freedom serial manipulator show that integration of several sensor modalities can increase the accuracy of the measurements significantly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the current economy situation companies try to reduce their expenses. One of the solutions is to improve the energy efficiency of the processes. It is known that the energy consumption of pumping applications range from 20 up to 50% of the energy usage in the certain industrial plants operations. Some studies have shown that 30% to 50% of energy consumed by pump systems could be saved by changing the pump or the flow control method. The aim of this thesis is to create a mobile measurement system that can calculate a working point position of a pump drive. This information can be used to determine the efficiency of the pump drive operation and to develop a solution to bring pump’s efficiency to a maximum possible value. This can allow a great reduction in the pump drive’s life cycle cost. In the first part of the thesis, a brief introduction in the details of pump drive operation is given. Methods that can be used in the project are presented. Later, the review of available platforms for the project implementation is given. In the second part of the thesis, components of the project are presented. Detailed description for each created component is given. Finally, results of laboratory tests are presented. Acquired results are compared and analyzed. In addition, the operation of created system is analyzed and suggestions for the future development are given.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this case study is to provide a Finnish solution provider company an objective, in-depth analysis of their project based business and especially of project estimation accuracy. A project and customer profitability analysis is conducted as a complementary addition to describe profitability of the Case Company’s core division. The theoretical framework is constructed on project profitability and customer profitability analysis. Project profitability is approached starting from managing projects, continuing to project pricing process and concluding to project success. The empirical part of this study describes the Case Company’s project portfolio, and by means of quantitative analysis, the study describes how the characteristics of a project impact the project’s profitability. The findings indicate that it really makes a difference in project portfolio’s estimated and actual profitability when methods of installation and technical specifications are scrutinized. Implications on profitability are gathered into a risk assessment tool proposal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Delays in the justice system have been undermining the functioning and performance of the court system all over the world for decades. Despite the widespread concern about delays, the solutions have not kept up with the growth of the problem. The delay problem existing in the justice courts processes is a good example of the growing need and pressure in professional public organizations to start improving their business process performance.This study analyses the possibilities and challenges of process improvement in professional public organizations. The study is based on experiences gained in two longitudinal action research improvement projects conducted in two separate Finnish law instances; in the Helsinki Court of Appeal and in the Insurance Court. The thesis has two objectives. First objective is to study what kinds of factors in court system operations cause delays and unmanageable backlogs and how to reduce and prevent delays. Based on the lessons learned from the case projects the objective is to give new insights on the critical factors of process improvement conducted in professional public organizations. Four main areas and factors behind the delay problem is identified: 1) goal setting and performance measurement practices, 2) the process control system, 3) production and capacity planning procedures, and 4) process roles and responsibilities. The appropriate improvement solutions include tools to enhance project planning and scheduling and monitoring the agreed time-frames for different phases of the handling process and pending inventory. The study introduces the identified critical factors in different phases of process improvement work carried out in professional public organizations, the ways the critical factors can be incorporated to the different stages of the projects, and discusses the role of external facilitator in assisting process improvement work and in enhancing ownership towards the solutions and improvement. The study highlights the need to concentrate on the critical factors aiming to get the employees to challenge their existing ways of conducting work, analyze their own processes, and create procedures for diffusing the process improvement culture instead of merely concentrating of finding tools, techniques, and solutions appropriate for applications from the manufacturing sector

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Target company of this study is a large machinery company, which is, inter alia, engaged in energy and pulp engineering, procurement and construction management (EPCM) supply business. The main objective of this study was to develop cost estimation of the target company by providing more accurate, reliable and up-to-date information through enterprise resource planning (ERP) system. Another objective was to find cost-effective methods to collect total cost of ownership information to support more informed supplier selection decision making. This study is primarily action-oriented, but also constructive, and it can be divided in two sections: theoretical literature review and empirical study on the abovementioned part of the target company’s business. Development of information collection is, in addition to literature review, based on nearly 30 qualitative interviews of employees at various organizational units, functions and levels at the target company. At the core of development was to make initial data more accurate, reliable and available, a necessary prerequisite for informed use of the information. Certain development suggestions and paths were presented in order to regain confidence in ERP system as information source by reorganizing work breakdown structure and by complementing mere cost information with quantitative, technical and scope information. Several methods to use the information ever more effectively were also discussed. While implementation of the development suggestions outreached the scope of this study, it was forwarded in test environment and interest groups.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Selostus: Ayrshire-ensikoiden koelypsykohtaisen maidontuotannon perinnölliset tunnusluvut laktaation eri vaiheissa