200 resultados para Wind power plants -- Catalonia

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

With growing demand for liquefied natural gas (LNG) and liquid transportation fuels, and concerns about climate change and causes of greenhouse gas emissions, this master’s thesis introduces a new value chain design for LNG and transportation fuels and respective fundamental business cases based on hybrid PV-Wind power plants. The value chains are composed of renewable electricity (RE) converted by power-to-gas (PtG), gas-to-liquids (GtL) or power-to-liquids (PtL) facilities into SNG (which is finally liquefied into LNG) or synthetic liquid fuels, mainly diesel, respectively. The RE-LNG or RE-diesel are drop-in fuels to the current energy system and can be traded everywhere in the world. The calculations for the hybrid PV-Wind power plants, electrolysis, methanation (H2tSNG), hydrogen-to-liquids (H2tL), GtL and LNG value chain are performed based on both annual full load hours (FLh) and hourly analysis. Results show that the proposed RE-LNG produced in Patagonia, as the study case, is competitive with conventional LNG in Japan for crude oil prices within a minimum price range of about 87 - 145 USD/barrel (20 – 26 USD/MBtu of LNG production cost) and the proposed RE-diesel is competitive with conventional diesel in the European Union (EU) for crude oil prices within a minimum price range of about 79 - 135 USD/barrel (0.44 – 0.75 €/l of diesel production cost), depending on the chosen specific value chain and assumptions for cost of capital, available oxygen sales and CO2 emission costs. RE-LNG or RE-diesel could become competitive with conventional fuels from an economic perspective, while removing environmental concerns. The RE-PtX value chain needs to be located at the best complementing solar and wind sites in the world combined with a de-risking strategy. This could be an opportunity for many countries to satisfy their fuel demand locally. It is also a specific business case for countries with excellent solar and wind resources to export carbon-neutral hydrocarbons, when the decrease in production cost is considerably more than the shipping cost. This is a unique opportunity to export carbon-neutral hydrocarbons around the world where the environmental limitations on conventional hydrocarbons are getting tighter.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Venäjällä uudistetaan sähkömarkkinoita. Uudistamisella pyritään vapauttamaan sähkömarkkinat ja lisäämään kilpailua energiasektorilla. Sähkömarkkinoiden vapauttamisen tarkoitus on energiasektorin hyötysuhteen nostaminen ja investointien houkutteleminen sektorille. Venäjä on ratifioinut Kioton protokollan, mikä energiasektorin kannalta on tärkeää, koska protokollan yhteistoteutusmekanismin kautta saadaan houkuteltua investointeja sektorille. Venäjän sähkömarkkinoiden vapauttamisen pitkäaikainen tähtäin on Venäjän ja Euroopan sähkömarkkinoiden integroituminen, joka tarkoittaa myös ympäristölainsäädännönyhtenäistämistä. Tämä tutkimus on osa Fortum Oyj:n tarjoamaa teknistä katselmusta Venäjällä toimivalle sähköyhtiölle, TGC-9:lle. Tässä työssä keskitytään TGC-9:n omistamien energiatuotantolaitoksien happamoitumista aiheuttaviin ilmapäästöihin ja pölypäästöihin. Tutkimuksessa pyritään myös löytämään Kioton protokollan yhteistoteutusmekanismi hyödyntämiskohteita. NOx -päästöt tulevat olemaan suurin haaste TGC-9:lle, jos ympäristöstandardit yhdenmukaistetaan. Yhteistoteutusmekanismin hyödyntämiskohteita löydettiin neljä: koksaamokaasun hyödyntäminen, maakaasun korvaaminen kuoren poltolla ja kaksi tapausta liittyen laitoksien hyötysuhteen nostamiseen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis gives an overview of the validation process for thermal hydraulic system codes and it presents in more detail the assessment and validation of the French code CATHARE for VVER calculations. Three assessment cases are presented: loop seal clearing, core reflooding and flow in a horizontal steam generator. The experience gained during these assessment and validation calculations has been used to analyze the behavior of the horizontal steam generator and the natural circulation in the geometry of the Loviisa nuclear power plant. The cases presented are not exhaustive, but they give a good overview of the work performed by the personnel of Lappeenranta University of Technology (LUT). Large part of the work has been performed in co-operation with the CATHARE-team in Grenoble, France. The design of a Russian type pressurized water reactor, VVER, differs from that of a Western-type PWR. Most of thermal-hydraulic system codes are validated only for the Western-type PWRs. Thus, the codes should be assessed and validated also for VVER design in order to establish any weaknesses in the models. This information is needed before codes can be used for the safety analysis. Theresults of the assessment and validation calculations presented here show that the CATHARE code can be used also for the thermal-hydraulic safety studies for VVER type plants. However, some areas have been indicated which need to be reassessed after further experimental data become available. These areas are mostly connected to the horizontal stem generators, like condensation and phase separation in primary side tubes. The work presented in this thesis covers a large numberof the phenomena included in the CSNI code validation matrices for small and intermediate leaks and for transients. Also some of the phenomena included in the matrix for large break LOCAs are covered. The matrices for code validation for VVER applications should be used when future experimental programs are planned for code validation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study focuses on two effects of the presence of a noncondensable gas on the thermal-hydraulic behavior of thecoolant of the primary circuit of a nuclear reactor in the VVER-440 geometry inabnormal situations. First, steam condensation with the presence of air was studied in the horizontal tubes of the steam generator (SG) of the PACTEL test facility. The French thermal-hydraulic CATHARE code was used to study the heat transfer between the primary and secondary side in conditions derived from preliminary experiments performed by VTT using PACTEL. In natural circulation and single-phase vapor conditions, the injection of a volume of air, equivalent to the totalvolume of the primary side of the SG at the entrance of the hot collector, did not stop the heat transfer from the primary to the secondary side. The calculated results indicate that air is located in the second half-length (from the mid-length of the tubes to the cold collector) in all the tubes of the steam generator The hot collector remained full of steam during the transient. Secondly, the potential release of the nitrogen gas dissolved in the water of the accumulators of the emergency core coolant system of the Loviisa nuclear power plant (NPP) was investigated. The author implemented a model of the dissolution and release ofnitrogen gas in the CATHARE code; the model created by the CATHARE developers. In collaboration with VTT, an analytical experiment was performed with some components of PACTEL to determine, in particular, the value of the release time constant of the nitrogen gas in the depressurization conditions representative of the small and intermediate break transients postulated for the Loviisa NPP. Such transients, with simplified operating procedures, were calculated using the modified CATHARE code for various values of the release time constant used in the dissolution and release model. For the small breaks, nitrogen gas is trapped in thecollectors of the SGs in rather large proportions. There, the levels oscillate until the actuation of the low-pressure injection pumps (LPIS) that refill the primary circuit. In the case of the intermediate breaks, most of the nitrogen gas is expelled at the break and almost no nitrogen gas is trapped in the SGs. In comparison with the cases calculated without taking into account the release of nitrogen gas, the start of the LPIS is delayed by between 1 and 1.75 h. Applicability of the obtained results to the real safety conditions must take into accountthe real operating procedures used in the nuclear power plant.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This master’s thesis handles an operating model for an electric equipment supplier conducted sale oriented energy audit for pumping, fan and other motor applications at power plants. The study goes through the largest factors affecting internal electricity use at a power plant, finds an energy audit –like approach for the basis of information gathering and presents the information needed for conducting the analysis. The model is tested in practice at a kraft recovery boiler of a chemical pulping mill. Targets chosen represent some of the largest electric motor applications in the boiler itself and in its fuel handling. The energy saving potential of the chosen targets is calculated by simulating the energy consumption of the alternatives for controlling the targets, and thereafter combining the information with the volume flow duration curve. Results of the research are somewhat divaricated, as all the information needed is not available in the automation system. Some of the targets could be simulated and their energy saving potential calculated quite easily. At some of the targets chosen the monitoring was not sufficient enough for this and additional measurements would have been needed to base the calculations on. In traditional energy audits, energy efficiency of pump and fan applications is not necessarily examined. This means that there are good possibilities for developing the now presented targeted energy audit procedure basis further.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The subject of this master’s thesis is to research grounding in a particular wind power application. The aim is to define how the grounding from different points effects to the function of the whole system. The investigated subjects are generator voltage spikes, ground currents and system fault situations. The first part of this thesis represents power electronics, which is commonly used in wind power systems. The second part concentrates more to the grounding, electrical safety demands and potential fault situations. The object of the simulations is to investigate voltage spikes and fault situations. Measurements will be made with small-scale setup and in the last part simulation and measurement results are compared to each other and to a full-scale system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Advancements in power electronic semiconductor switching devices have lead to significantly faster switching times. In motor and generator applications, the fast switching times of pulse width modulated (PWM) inverters lead to overvoltages caused by voltage reflections with shorter and shorter cables. These excessive overvoltages may lead to a failure of the electrical machine in a matter of months. In this thesis, the causes behind the overvoltage phenomenon as well as its different mitigation techniques are studied. The most suitable techniques for mitigating the overvoltage phenomenon in wind power generator applications are chosen based on both simulations and actual measurements performed on a prototype. An RC filter at the terminals of the electrical machine and an inverter output filter designed to reduce the rise and fall times of voltage pulses are presented as a solution to the overvoltage problem. The performance and losses of both filter types are analysed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of the master's thesis is a detailed research of the technical wind energy potential in Russian Federation: the distribution of the potential all over the territory of the country and the possibility of the application of the potential for power supply of various objects. The main attention of the thesis is devoted to the assessment of wind energy resources (potential) of Russian Federation, both for the territory of country in whole and for every region. Theoretical basic wind energy concepts and the scheme of transformation of kinetic energy of a wind into electric energy by modern wind turbines are given in the work. Also the costs of energy, stimuli of development of wind-engineering and obstacles which impact the industry development are analyzed. The review of existent and projected wind power plants in Russia is carried out.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis includes several thermal hydraulic analyses related to the Loviisa WER 440 nuclear power plant units. The work consists of experimental studies, analysis of the experiments, analysis of some plant transits and development of a calculational model for calculation of boric acid concentrations in the reactor. In the first part of the thesis, in the case of won of boric acid solution behaviour during long term cooling period of LOCAs, experiments were performed in scaled down test facilities. The experimental data together with the results of RELAPS/MOD3 simulations were used to develop a model for calculations of boric acid concentrations in the reactor during LOCAs. The results of calculations showed that margins to critical concentrations that would lead to boric acid crystallization were large, both in the reactor core and in the lower plenum. This was mainly caused by the fact that water in the primary cooling circuit includes borax (Na)BsO,.IOHZO), which enters the reactor when ECC water is taken from the sump and greatly increases boric acid solubility in water. In the second part, in the case of simulation of horizontal steam generators, experiments were performed with PACTEL integral test loop to simulate loss of feedwater transients. The PACTEL experiments, as well as earlier REWET III natural circulation tests, were analyzed with RELAPS/MOD3 Version Sm5 code. The analysis showed that the code was capable of simulating the main events during the experiments. However, in the case of loss of secondary side feedwater the code was not completely capable to simulate steam superheating in the secondary side of the steam generators. The third part of the work consists of simulations of Loviisa VVER reactor pump trip transients with RELAPSlMODI Eur, RELAPS/MOD3 and CATHARE codes. All three codes were capable to simulate the two selected pump trip transients and no significant differences were found between the results of different codes. Comparison of the calculated results with the data measured in the Loviisa plant also showed good agreement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the last few years, the Ukrainian investment market has constantly shown strong performance and significant growth. This is primarily due to the investment attractiveness of Ukraine. From the perspective of investments in energy sector, Ukraine can be described as a country providing significant number of opportunities to multiply invested funds. But there are numbers of risks which hamper large investments. The work objective was to discover opportunities in small-scale hydropower and wind power sectors of Ukraine and more importantly to prove economic expediency of such investments. Thesis covers major of issues, concerning entering the Ukrainian power market as a foreign investor. It provides basic information about the structure of power market, the state of renewables sector in Ukraine, development of power sector in the regions, functioning of Wholesale Electricity Market, formation of electricity prices, possibilities for implementing joint Implementation mechanism, while the most attention, nevertheless, is concentrated on the opportunities in small-scale hydro and wind power sectors. Theoretical part of the study disclosed that Crimea peninsula has perfect wind conditions and could be a prospective area for wind project development. Investment analysis revealed that project profits will be excellent if green tariff for renewable energy is adopted. By the moment uncertainties about green law adoption bring additional risk to the projects and complicate any investment decision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this master's thesis is to compare two different generator systems for wind turbines. It is the doubly fed induction generator system with three stage gearbox and the direct drive permanent magnet generator system. The comparison of generator systems is based on annual energy production for a given wind climate. For comparison a 3 MW, 15 rpm wind turbine is used. Modelling of a turbine rotor, gearbox and converters were done. Design of two generators was done and their performance was examined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The energy reform, which is happening all over the world, is caused by the common concern of the future of the humankind in our shared planet. In order to keep the effects of the global warming inside of a certain limit, the use of fossil fuels must be reduced. The marginal costs of the renewable sources, RES are quite high, since they are new technology. In order to induce the implementation of RES to the power grid and lower the marginal costs, subsidies were developed in order to make the use of RES more profitable. From the RES perspective the current market is developed to favor conventional generation, which mainly uses fossil fuels. Intermittent generation, like wind power, is penalized in the electricity market since it is intermittent and thus diffi-cult to control. Therefore, the need of regulation and thus the regulation costs to the producer differ, depending on what kind of generation market participant owns. In this thesis it is studied if there is a way for market participant, who has wind power to use the special characteristics of electricity market Nord Pool and thus reach the gap between conventional generation and the intermittent generation only by placing bids to the market. Thus, an optimal bid is introduced, which purpose is to minimize the regulation costs and thus lower the marginal costs of wind power. In order to make real life simulations in Nord Pool, a wind power forecast model was created. The simulations were done in years 2009 and 2010 by using a real wind power data provided by Hyötytuuli, market data from Nord Pool and wind forecast data provided by Finnish Meteorological Institute. The optimal bid needs probability intervals and therefore the methodology to create probability distributions is introduced in this thesis. In the end of the thesis it is shown that the optimal bidding improves the position of wind power producer in the electricity market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wind power is a low-carbon energy production form that reduces the dependence of society on fossil fuels. Finland has adopted wind energy production into its climate change mitigation policy, and that has lead to changes in legislation, guidelines, regional wind power areas allocation and establishing a feed-in tariff. Wind power production has indeed boosted in Finland after two decades of relatively slow growth, for instance from 2010 to 2011 wind energy production increased with 64 %, but there is still a long way to the national goal of 6 TWh by 2020. This thesis introduces a GIS-based decision-support methodology for the preliminary identification of suitable areas for wind energy production including estimation of their level of risk. The goal of this study was to define the least risky places for wind energy development within Kemiönsaari municipality in Southwest Finland. Spatial multicriteria decision analysis (SMCDA) has been used for searching suitable wind power areas along with many other location-allocation problems. SMCDA scrutinizes complex ill-structured decision problems in GIS environment using constraints and evaluation criteria, which are aggregated using weighted linear combination (WLC). Weights for the evaluation criteria were acquired using analytic hierarchy process (AHP) with nine expert interviews. Subsequently, feasible alternatives were ranked in order to provide a recommendation and finally, a sensitivity analysis was conducted for the determination of recommendation robustness. The first study aim was to scrutinize the suitability and necessity of existing data for this SMCDA study. Most of the available data sets were of sufficient resolution and quality. Input data necessity was evaluated qualitatively for each data set based on e.g. constraint coverage and attribute weights. Attribute quality was estimated mainly qualitatively by attribute comprehensiveness, operationality, measurability, completeness, decomposability, minimality and redundancy. The most significant quality issue was redundancy as interdependencies are not tolerated by WLC and AHP does not include measures to detect them. The third aim was to define the least risky areas for wind power development within the study area. The two highest ranking areas were Nordanå-Lövböle and Påvalsby followed by Helgeboda, Degerdal, Pungböle, Björkboda, and Östanå-Labböle. The fourth aim was to assess the recommendation reliability, and the top-ranking two areas proved robust whereas the other ones were more sensitive.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A program for calculating low-speed low-power synchronous machine is presented. A permanent-magnet synchronous generator for 1 kW 150 rpm is designed. Optimization of magnet’s and coil’s dimensions was made.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Työn tavoitteena on kehittää ABB:lle palvelutuote, jota voidaan tarjota voimalaitosasiakkaille. Uuden palvelutuotteen tulee vastata ABB:n uuden strategian linjauksiin. Palvelulla tarjotaan asiakkaille 1.1.2015 voimaan tulleen energiatehokkuuslain määrittelemien pakollisten toimenpiteiden suoritusta. Työssä kerätään, käsitellään ja analysoidaan tietoa voimalaitosasiakkaille suunnatun palvelun tuotteistamisprosessin päätöksenteon tueksi. Palvelutuotteen kehittämistä varten tutkitaan ABB:n nykyisiä palvelutuotteita, osaamista ja referenssi projekteja, energiatehokkuuslakia, voimalaitosten energiatehokkuus-potentiaalia ja erilaisia energiakatselmusmalleja. Päätöksenteon tueksi tehdään referenssiprojektina energia-analyysi voimalaitokselle, jossa voimalaitoksesta tehdään ipsePRO simulointiohjelmalla mallinnus. Mallinnuksen ja koeajojen avulla tutkitaan voimalaitoksen minimikuorman optimointia. Markkinatutkimuksessa selvitetään lainsäädännön vaikutusta, nykyistä markkinatilannetta, potentiaalisia asiakkaita, kilpailijoita ja ABB:n mahdollisuuksia toimia alalla SWOT–analyysin avulla. Tutkimuksen tulosten perusteella tehdään päätös tuotteistaa voimalaitoksille palvelutuote, joka sisältää kaikki toimet energiatehokkuuslain asettamien vaatimusten täyttämiseen yrityksen energiakatselmuksen vastuuhenkilön, energiakatselmuksen ja kohdekatselmuksien teon osalta. Lisäksi työn aikana Energiavirasto myönsi ABB:lle pätevyyden toimia yrityksen energiakatselmuksen vastuuhenkilönä, mikä on edellytyksenä palvelun tarjoamiselle.