One of the main industries which form the basis of Russian Economical structure is oil and gas. This industry is also playing a significant role for CIS countries. Oil and gas industry is developing intensively attracting foreign investments. This situation is providing sustainable development of machinery production for hazardous areas. Operating in oil and gas areas is always related with occurrence of explosion gas atmospheres. Machines for hazardous areas must be furnished with additional protection of different types. Explosion protection is regulated with standards according to which equipment must be manufactured. In Russia and CIS countries explosion-proof equipment must be constructed in compliance with GOST standards. To confirm that equipment is manufactured according to standards’ requirements and is safe and reliable it must undergo the approval procedure. Certification in Russia is governed by Federal Laws and legislation. Each CIS country has its own approval certificates and permissions for operating in hazardous areas.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Työssä vertaillaan massatuotannon näkökulmasta eri tehoalueille sopivia teholähteen toteuttamisvaihtoehtoja. Lisäksi esitellään standardien asettamia vaatimuksia teholähteille. Työssä käsitellään teholähdesuunnittelun eri osa-alueita ja niihin sopivien simulointityökalujen hyödyntämismahdollisuuksia suunnitteluprosessin osana. Simulointituloksia ja teoreettisia laskelmia vertaillaan prototyypistä suoritettuihin mittauksiin.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this research is to observe the state of customer value management in Outotec Oyj, determine the key development areas and develop a phase model with which to guide the development of a customer value based sales tool. The study was conducted with a constructive research approach with the focus of identifying a problem and developing a solution for the problem. As a basis for the study, the current literature involving customer value assessment and solution and customer value selling was studied. The data was collected by conducting 16 interviews in two rounds within the company and it was analyzed by coding openly. First, seven important development areas were identified, out of which the most critical were “Customer value mindset inside the company” and “Coordination of customer value management activities”. Utilizing these seven areas three functionality requirements, “Preparation”, “Outotec’s value creation and communication” and “Documentation” and three development requirements for a customer value sales tool were identified. The study concluded with the formulation of a phase model for building a customer value based sales tool. The model included five steps that were defined as 1) Enable customer value utilization, 2) Connect with the customer, 3) Create customer value, 4) Define tool to facilitate value selling and 5) Develop sales tool. Further practical activities were also recommended as a guide for executing the phase model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Requirements-relatedissues have been found the third most important risk factor in software projects and as the biggest reason for software project failures. This is not a surprise since; requirements engineering (RE) practices have been reported deficient inmore than 75% of all; enterprises. A problem analysis on small and low maturitysoftware organizations revealed two; central reasons for not starting process improvement efforts: lack of resources and uncertainty; about process improvementeffort paybacks.; In the constructive part of the study a basic RE method, BaRE, was developed to provide an; easy to adopt way to introduce basic systematic RE practices in small and low maturity; organizations. Based on diffusion of innovations literature, thirteen desirable characteristics; were identified for the solution and the method was implemented in five key components:; requirements document template, requirements development practices, requirements; management practices, tool support for requirements management, and training.; The empirical evaluation of the BaRE method was conducted in three industrial case studies. In; this evaluation, two companies established a completely new RE infrastructure following the; suggested practices while the third company conducted continued requirements document; template development based on the provided template and used it extensively in practice. The; real benefits of the adoption of the method were visible in the companies in four to six months; from the start of the evaluation project, and the two small companies in the project completed; their improvement efforts with an input equal to about one person month. The collected dataon; the case studies indicates that the companies implemented new practices with little adaptations; and little effort. Thus it can be concluded that the constructed BaRE method is indeed easy to; adopt and it can help introduce basic systematic RE practices in small organizations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Työ käsittelee Metso Paper Servicen varaosa- ja kulutusosatuotelinjojen mahdollisuuksia sähköiseen liiketoimintaan ulkoisten asiakkaiden kanssa sekä sähköisten transaktioiden vaikutuksia, etuja ja edellytyksiä. Työssä selvitetään Metson ja sen kymmenen kotimaisen asiakastehtaan myynti- ja ostoprosessin toiminta. Prosessimallin avulla arvioidaan valmiuksia sähköisiin transaktioihin nykyisessä myynti- ja ostotoiminnassa. Tarkastelu painottuu toimintoihin tarjontaketjun eri vaiheissa. Teknisiä näkökohtia käsitellään kokonaiskuvan luomiseksi. Lisäksi työssä arvioidaan muutoksia, joita sähköinen liiketoiminta aiheuttaisi. Haastatteluin tehdyssä tutkimuksessa kartoitetaan näkemyksiä sähköiseen liiketoimintaan erilaisilla organisaation tasoilla. Kokonaisnäkemys syntyy erilaisista näkökulmista sähköiseen kauppaan. Sähköiseen liiketoimintaan suhtaudutaan myönteisesti. Kokemuksia on kuitenkin vielä vähän. Vaikka hankkeita sähköisen liiketoiminnan lisäämiseksi on vireillä, yhtä tärkeää on parantaa valmiuksia tehostamalla paitsi informaatiovirtaa, myös materiaalivirtaa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The developing energy markets and rising energy system costs have sparked the need to find new forms of energy production and increase the self-sufficiency of energy production. One alternative is gasification, whose principles have been known for decades, but it is only recently when the technology has become a true alternative. However, in order to meet the requirements of modern energy production methods, it is necessary to study the phenomenon thoroughly. In order to understand the gasification process better and optimize it from the viewpoint of ecology and energy efficiency, it is necessary to develop effective and reliable modeling tools for gasifiers. The main aims of this work have been to understand gasification as a process and furthermore to develop an existing three-dimensional circulating fluidized bed modeling tool for modeling of gasification. The model is applied to two gasification processes of 12 and 50 MWth. The results of modeling and measurements have been compared and subsequently reviewed. The work was done in co-operation with Lappeenranta University of Technology and Foster Wheeler Energia Oy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the 2000’s Finland suffered from storms that caused long outages in electricity distribution, longest up to two weeks. These major disturbances increased the importance of supply security. In 2013 new Electricity Market Act was announced. It defined maximum duration for outages, 6 h for city plan areas and 36 h for other areas. The aim for this work is to determine required major disturbance proof level for a study area and find tools for prioritizing overhead lines for cabling renovation to improve supply security. Three prioritization methods were chosen to be studied: A: prioritization line sections by customer outage costs they cause, B: maximizing customers major disturbance proof network and C: minimizing excavation costs in medium voltage network. Profitability calculations showed that prioritization method A was the most profitable and C had the weakest profitability. The prioritization method C drove renovation into unreasonable locations in the study area in reliability point of view. Therefore universal rule prioritization methods couldn’t be made from the prioritization methods. This led to the conclusion that every renewing area need to be evaluated in a case by case basis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Three-dimensional (3D) forming of paperboard and heat sealing of lidding films to trays manufactured by the press forming process are investigated in this thesis. The aim of the work was to investigate and recognize the factors affecting the quality of heat sealing and the leak resistance (tightness) of press-formed, polymer-coated paperboard trays heatsealed with a multi-layer polymer based lidding film. One target was to achieve a solution that can be used in food packaging using modified atmosphere packaging (MAP). The main challenge in acquiring adequate tightness properties for the use of MAP is creases in the sealing area of the paperboard trays which can act as capillary tubes and prevent leak-proof sealing. Several experiments were made to investigate the effect of different factors and process parameters in the forming and sealing processes. Also different methods of analysis, such as microscopic analysis and 3D-profilometry were used to investigate the structure of the creases in the sealing area, and to analyse the surface characteristics of the tray flange of the formed trays to define quality that can be sealed with satisfactory tightness for the use of MAP. The main factors and parameters that had an effect on the result of leak-proof sealing and must be adjusted accordingly were the tray geometry and dimensions, blank holding force in press forming, surface roughness of the sealing area, the geometry and depth of the creases, and the sealing pressure. The results show that the quality of press-formed, polymer-coated paperboard trays and multi-layer polymer lidding films can be satisfactory for the use of modified atmosphere packaging in food solutions. Suitable tools, materials, and process parameters have to be selected and used during the tray manufacturing process and lid sealing process, however. Utilizing these solutions and results makes it possible for a package that is made mostly from renewable and recyclable sources to be a considerable alternative for packages made completely from oil based polymers, and to achieve a greater market share for fibre-based solutions in food packaging using MAP.