73 resultados para Six sigma (Quality control standard)
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
Project scope is to utilize Six Sigma DMAIC approach and lean principles to improve production quality of the case company. Six Sigma tools and techniques are explored through a literature review and later used in the quality control phase. The focus is set on the Pareto analysis to demonstrate the most evident development areas in the production. Materials that are not delivered to the customer or materials that damaged during transportation comprise the biggest share of all feedbacks. The goal is set to reduce these feedbacks by 50 %. Production observation pointed out that not only material shortages but also over-production is a daily situation. As a result, an initial picking list where the purchased and own production components can be seen, is created, reduction of over- and underproduction and material marking improvement are seen the most competitive options so that the goal can be reached. The picking list development should still continue to make sure that the list can be used not only in the case study but also in the industrial scale. The reduction of material missing category can be evaluated reliably not sooner than in few years because it takes time to gather the needed statistical information.
Resumo:
Overall Equipment Effectiveness (OEE) is the key metric of operational excellence. OEE monitors the actual performance of equipment relative to its performance capabilities under optimal manufacturing conditions. It looks at the entire manufacturing environment measuring, in addition to the equipment availability, the production efficiency while the equipment is available to run products, as well as the efficiency loss that results from scrap, rework, and yield losses. The analysis of the OEE provides improvement opportunities for the operation. One of the tools used for OEE improvement is Six Sigma DMAIC methodology which is a set of practices originally developed to improve processes by eliminating defects. It asserts the continuous efforts to reduce variation in process outputs as key to business success, as well as the possibility of measurement, analysis, improvement and control of manufacturing and business processes. In the case of the Bottomer line AD2378 in Papsac Maghreb Casablanca plant, the OEE figures reached 48.65 %, which is below the accepted OEE group performance. This required immediate actions to achieve OEE improvement. This Master thesis focuses on the application of Six Sigma DMAIC methodology in the OEE improvement on the Bottomer Line AD2378 in Papsac Maghreb Casablanca plant. First, the Six Sigma DMAIC and OEE usage in operation measurement will be discussed. Afterwards, the different DMAIC phases will allow the identification of improvement focus, the identification of OEE low performance causes and the design of improvement solutions. These will be implemented to allow further tracking of improvement impact on the plant operations.
Resumo:
Diplomityössä tarkastellaan hitsaavan verkoston laadunhallintaa ja siinä ilmeneviä erilaisia ongelmakohtia. Tämän lisäksi työssä tarkastellaan kolmen eri laatutyökalun Lean, Six Sigma ja Total Welding Management soveltamista hitsaavan verkoston laadunhallinnassa. Teoriaosassa käsitellään sekä yleisesti että hitsauksen osalta laatua ja laadunhallintaa, sekä edellä mainittuja laatutyökaluja. Tutkimusosaan tietoja hitsaavista verkostoista kerättiin kaikkiaan kolmesta eri verkostosta. Näiden kerättyjen tietojen pohjalta tarkasteltiin valittujen laatutyökalujen soveltuvuutta verkostomaiseen käyttöön. Verkostoitunut toiminta aiheuttaa monia uusia haasteita yritysten laadunhallinnalle verrattuna yksittäisiin hitsaaviin yrityksiin. Suurimpia tutkimuksessa havaittuja ongelmakohtia ovat suunnittelun ja valmistuksen yhteistyön erilaiset puutteet, laatutasoon ja sen varmistukseen liittyvät asiat, sekä verkoston sisälle syntyvä niin sanottu hiljainen tieto ja sen häviäminen. Tutkimuksen tarkastelujen perusteella havaittiin, että kaikkien tutkimukseen valitun kolmen laatutyökalun soveltaminen myös verkostomaisessa toiminnassa on mahdollista, mutta se vaatii huomattavasti suurempaa työpanosta kuin soveltaminen yksittäisessä yrityksessä. Myös näiden kaikkien kolmen työkalun yhtä aikainen käyttö on mahdollista. Juuri oikean työkalun valitseminen kullekin hitsaavalle verkostolle vaatii tarkkaa perehtymistä verkostoon ja sen tilanteeseen.
Resumo:
Imagine the potential implications of an organization whose business and IT processes are well aligned and are capable of reactively and proactively responding to the external and internal changes. The Philips IT Infrastructure and Operations department (I&O) is undergoing a series of transformation activities to help Philips business keeping up with the changes. I&O would serve a critical function in any business sectors; given that the I&O’s strategy switched from “design, build and run” to “specify, acquire and performance manage”, that function is amplified. In 2013, I&O’s biggest transforming programme I&O Futures engaged multiple interdisciplinary departments and programs on decommissioning legacy processes and restructuring new processes with respect to the Information Technology Internet Library (ITIL), helping I&O to achieve a common infrastructure and operating platform (CI&OP). The author joined I&O Futures in the early 2014 and contributed to the CI&OP release 1, during which a designed model Bing Box and its evaluations were conducted through the lens of six sigma’s structured define-measure-analyze-improve-control (DMAIC) improvement approach. This Bing Box model was intended to firstly combine business and IT principles, namely Lean IT, Agile, ITIL best practices, and Aspect-oriented programming (AOP) into a framework. Secondly, the author implemented the modularized optimization cycles according to the defined framework into Philips’ ITIL-based processes and, subsequently, to enhance business process performance as well as to increase efficiency of the optimization cycles. The unique of this thesis is that the Bing Box model not only provided comprehensive optimization approaches and principles for business process performance, but also integrated and standardized optimization modules for the optimization process itself. The research followed a design research guideline that seek to extend the boundaries of human and organizational capabilities by creating new and innovative artifacts. The Chapter 2 firstly reviewed the current research on Lean Six Sigma, Agile, AOP and ITIL, aiming at identifying the broad conceptual bases for this study. In Chapter 3, we included the process of constructing the Bing Box model. The Chapter 4 described the adoption of Bing Box model: two-implementation case validated by stakeholders through observations and interviews. Chapter 5 contained the concluding remarks, the limitation of this research work and the future research areas. Chapter 6 provided the references used in this thesis.
Resumo:
The increased awareness and evolved consumer habits have set more demanding standards for the quality and safety control of food products. The production of foodstuffs which fulfill these standards can be hampered by different low-molecular weight contaminants. Such compounds can consist of, for example residues of antibiotics in animal use or mycotoxins. The extremely small size of the compounds has hindered the development of analytical methods suitable for routine use, and the methods currently in use require expensive instrumentation and qualified personnel to operate them. There is a need for new, cost-efficient and simple assay concepts which can be used for field testing and are capable of processing large sample quantities rapidly. Immunoassays have been considered as the golden standard for such rapid on-site screening methods. The introduction of directed antibody engineering and in vitro display technologies has facilitated the development of novel antibody based methods for the detection of low-molecular weight food contaminants. The primary aim of this study was to generate and engineer antibodies against low-molecular weight compounds found in various foodstuffs. The three antigen groups selected as targets of antibody development cause food safety and quality defects in wide range of products: 1) fluoroquinolones: a family of synthetic broad-spectrum antibacterial drugs used to treat wide range of human and animal infections, 2) deoxynivalenol: type B trichothecene mycotoxin, a widely recognized problem for crops and animal feeds globally, and 3) skatole, or 3-methyindole is one of the two compounds responsible for boar taint, found in the meat of monogastric animals. This study describes the generation and engineering of antibodies with versatile binding properties against low-molecular weight food contaminants, and the consecutive development of immunoassays for the detection of the respective compounds.
Resumo:
Six sigma is a quality improvement philosophy with systematic and formal approach. In order to successfully implement and utilize six sigma the basic disciplines of it should be adopted by the entire organization. Furthermore, employee involvement is crucial in six sigma implementation. This thesis addresses the challenges of long-lasting involvement in the case company. It focuses on gaps of involving six sigma trained employees, Black Belts. Theoretical framework of the thesis illustrates different factors influencing employee involvement. Influencing factors can be divided into ten categories: organizational culture, managerial commitment, leadership style, employee empowerment, employees’ perceptions, communication, training, goals, performance measurement and incentives. Factors and categories overlap and are related to each other. The framework provides holistic view of employee involvement in six sigma context but can be used also with other quality management philosophies. This thesis was conducted as a case study and written on an assignment to a power and automation technology company. Due to the nature of research problem, the data collection was conducted by interviewing case company personnel. In order to study involvement from employees’ point of view interview questions were designed to be open-ended and to allow the interviewees to tell freely about the phenomenon. This thesis provides empirical support on previous studies in organizational support, management commitment and employee empowerment. In addition, it indicates the importance of separate function for Black Belts in the organization. The gaps in Black Belt involvement can be categorized under two categories: Management driven gaps are related to management commitment, organizational structure and culture and information systems. Black Belt driven gaps are related to practice and effort of using six sigma. This thesis finds solutions for bridging these gaps in the case company by applying findings from literature research and suggestions given by the interviewees. For each gap, actions are suggested for bridging the discrepancy between current and desired situations. The thesis states that in order to embed six sigma in the organization the most crucial gaps, lack of management commitment, six sigma vision and possibilities to use six sigma, should be diminished.
Resumo:
Six sigma is a quality improvement philosophy with systematic and formal approach. In order to successfully implement and utilize six sigma the basic disciplines of it should be adopted by the entire organization. Furthermore, employee involvement is crucial in six sigma implementation. This thesis addresses the challenges of long-lasting involvement in the case company. It focuses on gaps of involving six sigma trained employees, Black Belts. Theoretical framework of the thesis illustrates different factors influencing employee involvement. Influencing factors can be divided into ten categories: organizational culture, managerial commitment, leadership style, employee empowerment, employees’ perceptions, communication, training, goals, performance measurement and incentives. Factors and categories overlap and are related to each other. The framework provides holistic view of employee involvement in six sigma context but can be used also with other quality management philosophies. This thesis was conducted as a case study and written on an assignment to a power and automation technology company. Due to the nature of research problem, the data collection was conducted by interviewing case company personnel. In order to study involvement from employees’ point of view interview questions were designed to be open-ended and to allow the interviewees to tell freely about the phenomenon. This thesis provides empirical support on previous studies in organizational support, management commitment and employee empowerment. In addition, it indicates the importance of separate function for Black Belts in the organization. The gaps in Black Belt involvement can be categorized under two categories: Management driven gaps are related to management commitment, organizational structure and culture and information systems. Black Belt driven gaps are related to practice and effort of using six sigma. This thesis finds solutions for bridging these gaps in the case company by applying findings from literature research and suggestions given by the interviewees. For each gap, actions are suggested for bridging the discrepancy between current and desired situations. The thesis states that in order to embed six sigma in the organization the most crucial gaps, lack of management commitment, six sigma vision and possibilities to use six sigma, should be diminished.
Resumo:
Few people see both opportunities and threats coming from IT legacy in current world. On one hand, effective legacy management can bring substantial hard savings and smooth transition to the desired future state. On the other hand, its mismanagement contributes to serious operational business risks, as old systems are not as reliable as it is required by the business users. This thesis offers one perspective of dealing with IT legacy – through effective contract management, as a component towards achieving Procurement Excellence in IT, thus bridging IT delivery departments, IT procurement, business units, and suppliers. It developed a model for assessing the impact of improvements on contract management process and set of tools and advices with regards to analysis and improvement actions. The thesis conducted case study to present and justify the implementation of Lean Six Sigma in IT legacy contract management environment. Lean Six Sigma proved to be successful and this thesis presents and discusses all the steps necessary, and pitfalls to avoid, to achieve breakthrough improvement in IT contract management process performance. For the IT legacy contract management process two improvements require special attention and can be easily copied to any organization. First is the issue of diluted contract ownership that stops all the improvements, as people do not know who is responsible for performing those actions. Second is the contract management performance evaluation tool, which can be used for monitoring, identifying outlying contracts and opportunities for improvements in the process. The study resulted in a valuable insight on the benefits of applying Lean Six Sigma to improve IT legacy contract management, as well as on how Lean Six Sigma can be applied in IT environment. Managerial implications are discussed. It is concluded that the use of data-driven Lean Six Sigma methodology for improving the existing IT contract management processes is a significant addition to the existing best practices in contract management.
Resumo:
The objective of this research is to demonstrate the use of Lean Six Sigma methodology in a manufacturing lead time improvement project. Moreover, the goal is to develop working solutions for the target company to improve its manufacturing lead time. The theoretical background is achieved through exploring the literature of Six Sigma, Lean and Lean Six Sigma. The development will be done in collaboration with the related stakeholders, by following the Lean Six Sigma improvement process DMAIC and by analyzing the process data from the target company. The focus of this research is in demonstrating how to use Lean Six Sigma improvement process DMAIC in practice, rather than in comparing Lean Six Sigma to other improvement methodologies. In order to validate the manufacturing system’s current state, improvement potential and solutions, statistical tools such as linear regression analysis were used. This ensured that all the decisions were as heavily based on actual data as possible. As a result of this research, a set of solutions were developed and implemented in the target company. These solutions included batch size reduction, bottleneck shift, first-in first-out queuing and shifting a data entry task from production planners to line workers. With the use of these solutions, the target company was able to reduce its manufacturing lead time by over one third.
Resumo:
The Chinese welding industry is growing every year due to rapid development of the Chinese economy. Increasingly, companies around the world are looking to use Chinese enterprises as their cooperation partners. However, the Chinese welding industry also has its weaknesses, such as relatively low quality and weak management. A modern, advanced welding management system appropriate for local socio-economic conditions is required to enable Chinese enterprises to enhance further their business development. The thesis researches the design and implementation of a new welding quality management system for China. This new system is called ‗welding production quality control management model in China‘ (WQMC). Constructed on the basis of analysis of a survey and in-company interviews, the welding management system comprises the following different elements and perspectives: a ‗Localized congenital existing problem resolution strategies‘ (LCEPRS) database, a ‗human factor designed training system‘ (HFDT) training strategy, the theory of modular design, ISO 3834 requirements, total welding management (TWM), and lean manufacturing (LEAN) theory. The methods used in the research are literature review, questionnaires, interviews, and the author‘s model design experiences and observations, i.e. the approach is primarily qualitative and phenomenological. The thesis describes the design and implementation of a HFDT strategy in Chinese welding companies. Such training is an effective way to increase employees‘ awareness of quality and issues associated with quality assurance. The study identified widely existing problems in the Chinese welding industry and constructed a LCEPRS database that can be used in efforts to mitigate and avoid common problems. The work uses the theory of modular design, TWM and LEAN as tools for the implementation of the WQMC system.
Resumo:
Työ on osa Kotkan Energia Oy:ssä toteutettua laatuprojektia. Työllä haettiin uutta, oikeaa suuntaa jo aiemmin käynnistetylle laadun kehitykselle. Työn tavoitteena oli rakentaa yhtiölle asiakaslähtöinen laatujärjestelmä, joka kattaa kaikki Kotkan Energian toiminnot. Lisäksi diplomityöhön kuului järjestelmän dokumentointi ja erityisesti laatukäsikirjan mallintaminen. Laatujärjestelmän pohjana käytettiin ISO DIS 9001:2000 -laatustandardiehdotusta. Uudistetun standardiluonnoksen katsottiin palvelevan vanhoja ISO-laatustan-dardeja paremmin energiayhtiön tarpeita, koska ehdotus korostaa asiakastyytyväisyyttä, prosessiajattelua ja jatkuvaa parantamista. Diplomityöprojekti jakaantui selkeästi kolmeen osaan. Ensimmäisessä vaiheessa laatujärjestelmän ja laadun kehittämisen nykytilanne kartoitettiin haastattelujen ja aiemmin laaditun laatumateriaalin avulla. Selvityksen perusteella toisessa vaiheessa tehtiin kehitysehdotuksia ja -suunnitelmia sekä käynnistettiin järjestelmän perusrakenteiden luominen ja henkilöstön koulutus. Laatujärjestelmän keskeisiä osia rakennettiin yhteistyössä koko henkilöstön kanssa. Diplomityön kolmannessa vaiheessa Kotkan Energian menettelytavat dokumentoitiin laatukäsikirjan asiakirjoiksi. Dokumentointiin sisältyivät sekä vanhat, uudistetut että suunnitellut toimintaperiaatteet. Samalla käynnistettiin myös prosessien menettelyohjeiden laatiminen. Laatuprojektin aikana kehitettiin useita uusia ja toimivia käytäntöjä sekä niihin liittyviä dokumentteja. Näiden luotujen menettelytapojen kautta on jo saatu aikaan laadun parannusta. Osana työtä luotiin Kotkan Energian prosessien kuvaustapa. Muita tärkeimpiä ideoituja ja toteutettuja uusia työkaluja laadun hallintaan ovat tiimisopimus, asiakaspalautelomake, toimittajien arviointilomake, poikkeamaraportti sekä koulutus- ja matkatietolomake. Laatujärjestelmän viimeistelyyn ja kehittämiseen liittyvät ideat jalostettiin jatkosuunnitelmiksi.
Resumo:
The aim of the thesis was to study quality management with process approach and to find out how to utilize process management to improve quality. The operating environment of organizations has changed. Organizations are focusing on their core competences and networking with suppliers and customers to ensure more effective and efficient value creation for the end customer. Quality management is moving from inspection of the output to prevention of problems from occurring in the first place and management thinking is changing from functional approach to process approach. In the theoretical part of the thesis, it is studied how to define quality, how to achieve good quality, how to improve quality, and how to make sure the improvement goes on as never ending cycle. A selection of quality tools is introduced. Process approach to quality management is described and compared to functional approach, which is the traditional way to manage operations and quality. The customer focus is also studied, and it is presented, that to ensure long term customer commitment, organization needs to react to changing customer requirements and wishes by constantly improving the processes. In the experimental part the theories are tested in a process improvement business case. It is shown how to execute a process improvement project starting from defining the customer requirements, continuing to defining the process ownership, roles and responsibilities, boundaries, interfaces and the actual process activities. The control points and measures are determined for the process, as well as the feedback and corrective action process, to ensure continual improvement can be achieved and to enable verification that customer requirements are fulfilled.
Resumo:
Tool center point calibration is a known problem in industrial robotics. The major focus of academic research is to enhance the accuracy and repeatability of next generation robots. However, operators of currently available robots are working within the limits of the robot´s repeatability and require calibration methods suitable for these basic applications. This study was conducted in association with Stresstech Oy, which provides solutions for manufacturing quality control. Their sensor, based on the Barkhausen noise effect, requires accurate positioning. The accuracy requirement admits a tool center point calibration problem if measurements are executed with an industrial robot. Multiple possibilities are available in the market for automatic tool center point calibration. Manufacturers provide customized calibrators to most robot types and tools. With the handmade sensors and multiple robot types that Stresstech uses, this would require great deal of labor. This thesis introduces a calibration method that is suitable for all robots which have two digital input ports free. It functions with the traditional method of using a light barrier to detect the tool in the robot coordinate system. However, this method utilizes two parallel light barriers to simultaneously measure and detect the center axis of the tool. Rotations about two axes are defined with the center axis. The last rotation about the Z-axis is calculated for tools that have different width of X- and Y-axes. The results indicate that this method is suitable for calibrating the geometric tool center point of a Barkhausen noise sensor. In the repeatability tests, a standard deviation inside robot repeatability was acquired. The Barkhausen noise signal was also evaluated after recalibration and the results indicate correct calibration. However, future studies should be conducted using a more accurate manipulator, since the method employs the robot itself as a measuring device.