224 resultados para Grabowsky Power Wagon Company


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sales configurators are essential tools for companies that offer complicated case specifically crafted products for customers. Most sophisticated of them are able to design an entire end product on the fly according to given constraints, calculate price for the offer and move the order into production. This thesis covers a sales configurator acquisition project in a large industrial company that offers cranes for its customers. The study spans the preliminary stages of a large-scale software purchase project starting from the specification of problem domain and ending up presenting the most viable software solution that fulfils the requirements for the new system. The project consists of mapping usage environment, use cases, and collecting requirements that are expected from the new system. The collected requirements involve fitting the new sales system into enterprise application infrastructure, mitigating the risks involved in the project and specifying new features to the application whilst preserving all of the admired features of the old sales system currently used in the company. The collected requirements were presented to a number of different sales software vendors who were asked to provide solution suggestions that would fulfil all the demands. All of the received solution proposals were exposed to an evaluation to determine the most feasible solutions, and the construction of evaluation criteria itself was a part of the study. The final outcome of this study is a short-list of the most feasible sales configurator solutions together with a description of how software purchase process in large enterprises work, and which aspects should be paid attention in large projects of similar kind.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this master´s thesis is to study which processes increase the auxiliary power consumption in carbon capture and storage processes and if it is possible to reduce the auxiliary power consumption with variable speed drives. Also the cost of carbon capture and storage is studied. Data about auxiliary power consumption in carbon capture is gathered from various studies and estimates made by various research centres. Based on these studies a view is presented how the power auxiliary power consumption is divided between different processes in carbon capture processes. In a literary study, the operation of three basic carbon capture systems is described. Also different methods to transport carbon dioxide and carbon dioxide storage options are described in this section. At the end of the thesis processes that consume most of the auxiliary power are defined and possibilities to reduce the auxiliary power consumption are evaluated. Cost of carbon capture, transport and storage are also evaluated at this point and in the case that the carbon capture and storage systems are fully deployed. According to the results, it can be estimated what are the processes are where variable speed drives can be used and what kind of cost and power consumption reduction could be achieved. Results also show how large a project carbon capture and storage is if it is fully deployed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this Thesis was to study what is the present situation of Business Intelligence of the company unit. This means how efficiently unit uses possibilities of modern information management systems. The aim was to resolve how operative informa-tion management of unit’s tender process could be improved by modern information technology applications. This makes it possible that tender processes could be faster and more efficiency. At the beginning it was essential to acquaint oneself with written literature of Business Intelligence. Based on Business Intelligence theory is was relatively easy but challenging to search and discern how tender business could be improved by methods of Busi-ness Intelligence. The empirical phase of this study was executed as qualitative research method. This phase includes theme and natural interviews on the company. Problems and challenges of tender process were clarified in a part an empirical phase. Group of challenges were founded when studying information management of company unit. Based on theory and interviews, group of improvements were listed which company could possible do in the future when developing its operative processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tämän työn tavoitteena oli tehdä perusteltu esitys kahden suunnitellun sähköaseman toiminnan aloittamisen ajankohdasta sekä rakentamisen kestosta lupamenettelyineen. Työssä oli pyrkimys perustella asemien maantieteellinen sijainti, toteutustapa, rakenne sekä sähköasemien syöttöön tarvittavien 110 kV johtojen alustava rakenne ja reitti. Työssä on tarkasteltu uuden sähköaseman verkosto- ja kustannusvaikutuksia, sähköasemarakenteita ja niiden valintaa, sähköasemainvestointihankkeen vaiheita ja rakennuttamisprosessin läpivientiin tarvittavaa aikaa. Verkoston nykytilaa, käyttövarmuutta ja selviytymistä kuormituksen kasvusta on tarkasteltu sähköasemien toiminnan aloittamisen ajankohtien määrittämiseksi. Työn keskeisin painopiste oli sähköasemien rakentamisajankohdan määrittäminen. Sähköasemien toiminnan aloittamisen ajankohdan määrääväksi tekijäksi muodostuivat sähköasemien korvaustilanteet. Nykytilassa Valkealan haja-asutusalueen sähkönjakelua ei voida taata yksittäisen sähköaseman korvaustilanteessa, minkä takia sähköasemahankkeen valmistelu on aloitettava välittömästi. Kouvolan ydinkeskustan alueen maakaapeliverkon tehonsiirtokyky ja päämuuntajien reservitehokapasiteetti korvaustilanteissa riittävät vielä 5-10 vuotta riippuen suuresti alueen kuormituksen kasvusta.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The subject of this master’s thesis is to research grounding in a particular wind power application. The aim is to define how the grounding from different points effects to the function of the whole system. The investigated subjects are generator voltage spikes, ground currents and system fault situations. The first part of this thesis represents power electronics, which is commonly used in wind power systems. The second part concentrates more to the grounding, electrical safety demands and potential fault situations. The object of the simulations is to investigate voltage spikes and fault situations. Measurements will be made with small-scale setup and in the last part simulation and measurement results are compared to each other and to a full-scale system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The bachelor’s thesis concentrates on the innovativeness in the construction industry. The purpose of the thesis is to define the innovation as a concept reflected on a context of the construction industry. The second objective is to examine how the construction companies could foster and increase the innovativeness. The third objective was to find out tools, methods and phases of the front-end of the innovation process. The construction industry is often considered as a traditional and an old-fashioned manufacturing industry. The innovation or the innovativeness rarely linked to the construction industry. Productivity is a common problem in the construction industry. The construction industry needs to increase the productivity to compete in a globalized world. The productivity can be increased by the innovation. The thesis based on a literature review. The findings from the literature include a description of the innovation as a concept, the innovative culture and the innovation process as a context of the construction industry. The phases of the front-end of the innovation process were explained. Customers centered approach was taken into account in the innovation process. The required tools and methods for managing the front-end of the innovation process were illustrated. The thesis ensures the importance of the innovation facing challenges of the construction industry. Managing the front-end of the innovation is the most important aspect to stand out from the less innovative companies. To take a full advantage of the innovation companies cannot fear of changes. The innovation process requires a full support of the top management of the company. Taking into consideration a theoretical aspect of the thesis a further research is required to respond practical needs of the company. Tools and methods should be considered according the company’s needs and activities. Company’s existing state and culture should be examined before implementing the front-end of the innovation process to ensure the functionality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tässä diplomityössä optimoitiin nelivaiheinen 1 MWe höyryturbiinin prototyyppimalli evoluutioalgoritmien avulla sekä tutkittiin optimoinnista saatuja kustannushyötyjä. Optimoinnissa käytettiin DE – algoritmia. Optimointi saatiin toimimaan, mutta optimoinnissa käytetyn laskentasovelluksen (semiempiirisiin yhtälöihin perustuvat mallit) luonteesta johtuen optimoinnin tarkkuus CFD – laskennalla suoritettuun tarkastusmallinnukseen verrattuna oli jonkin verran toivottua pienempi. Tulosten em. epätarkkuus olisi tuskin ollut vältettävissä, sillä ongelma johtui puoliempiirisiin laskentamalleihin liittyvistä lähtöoletusongelmista sekä epävarmuudesta sovitteiden absoluuttisista pätevyysalueista. Optimoinnin onnistumisen kannalta tällainen algebrallinen mallinnus oli kuitenkin välttämätöntä, koska esim. CFD-laskentaa ei olisi mitenkään voitu tehdä jokaisella optimointiaskeleella. Optimoinnin aikana ongelmia esiintyi silti konetehojen riittävyydessä sekä sellaisen sopivan rankaisumallin löytämisessä, joka pitäisi algoritmin matemaattisesti sallitulla alueella, muttei rajoittaisi liikaa optimoinnin edistymistä. Loput ongelmat johtuivat sovelluksen uutuudesta sekä täsmällisyysongelmista sovitteiden pätevyysalueiden käsittelyssä. Vaikka optimoinnista saatujen tulosten tarkkuus ei ollut aivan tavoitteen mukainen, oli niillä kuitenkin koneensuunnittelua edullisesti ohjaava vaikutus. DE – algoritmin avulla suoritetulla optimoinnilla saatiin turbiinista noin 2,2 % enemmän tehoja, joka tarkoittaa noin 15 000 € konekohtaista kustannushyötyä. Tämä on yritykselle erittäin merkittävä konekohtainen kustannushyöty. Loppujen lopuksi voitaneen sanoa, etteivät evoluutioalgoritmit olleet parhaimmillaan prototyyppituotteen optimoinnissa. Evoluutioalgoritmeilla teknisten laitteiden optimoinnissa piilee valtavasti mahdollisuuksia, mutta se vaatii kypsän sovelluskohteen, joka tunnetaan jo entuudestaan erinomaisesti tai on yksinkertainen ja aukottomasti laskettavissa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Advancements in power electronic semiconductor switching devices have lead to significantly faster switching times. In motor and generator applications, the fast switching times of pulse width modulated (PWM) inverters lead to overvoltages caused by voltage reflections with shorter and shorter cables. These excessive overvoltages may lead to a failure of the electrical machine in a matter of months. In this thesis, the causes behind the overvoltage phenomenon as well as its different mitigation techniques are studied. The most suitable techniques for mitigating the overvoltage phenomenon in wind power generator applications are chosen based on both simulations and actual measurements performed on a prototype. An RC filter at the terminals of the electrical machine and an inverter output filter designed to reduce the rise and fall times of voltage pulses are presented as a solution to the overvoltage problem. The performance and losses of both filter types are analysed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Distribution companies are facing numerous challenges in the near future. Regulation defines correlation between power quality and revenue cap. Companies have to take measures for reliability increase to successfully compete in modern conditions. Most of the failures seen by customers originate in medium voltage networks. Implementation of network automation is the very effective measure to reduce duration and number of outages, and consequently, outage costs. Topic of this diploma work is study of automation investments effect on outage costs and other reliability indices. Calculation model have been made to perform needed reliability calculations. Theoretical study of different automation scenarios has been done. Case feeder from actual distribution company has been studied and various renovation plans have been suggested. Network automation proved to be effective measure for increasing medium voltage network reliability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In liberalized electricity markets, which have taken place in many countries over the world, the electricity distribution companies operate in the competitive conditions. Therefore, accurate information about the customers’ energy consumption plays an essential role for the budget keeping of the distribution company and for correct planning and operation of the distribution network. This master’s thesis is focused on the description of the possible benefits for the electric utilities and residential customers from the automatic meter reading system usage. Major benefits of the AMR, illustrated in the thesis, are distribution network management, power quality monitoring, load modelling, and detection of the illegal usage of the electricity. By the example of the power system state estimation, it was illustrated that even the partial installation of the AMR in the customer side leads to more accurate data about the voltage and power levels in the whole network. The thesis also contains the description of the present situation of the AMR integration in Russia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Yhteiskunnan riippuvuus sähköstä on lisääntynyt voimakkaasti viime vuosikymmenien aikana. Sähkönjakelussa esiintyneet lyhyet ja pitkät keskeytykset ovat osoittaneet yhteiskunnan haavoittuvuuden ja yhteiskunta kestää entistä vähemmän sähkönjakelussa tapahtuvia häiriöitä. Keskeytyksistä aiheutuneiden haittojen arvostus on kasvanut ja tämä on luonut taloudelliset perusteet sähkön laatua parantaville investoinneille. Haja-asutusalueiden keskijänniteverkon johdot on rakennettu avojohtoina ja siten ne ovat alttiita sääolosuhteista johtuville myrsky- ja lumikuormavaurioille. Ilmastomuutoksen ennustetaan lisäävän tuulisuutta ja siten ongelmat sähkönjakelussa mahdollisesti lisääntyvät. Taajamissa käytetään enemmän kaapeleita ja johtolähdöt ovat lyhyitä, joten myrskyistä aiheutuvia keskeytyksiä on vähemmän kuin haja-asutusalueella. Olemassa olevat jakeluverkot ovat käytössä vielä vuosikymmeniä, joten uuden tekniikan kehittämisen rinnalla on kehitettävä myös olemassa olevaa jakeluverkkoa ja sen ylläpitoa. Ylläpidon tavoitteena on käyttövarmuuden parantamisen lisäksi huolehtia siitä, että jakeluverkkoihin sitoutunut omaisuus säilyttää arvonsa mahdollisimman hyvin pitoajan loppuun saakka. Jakeluverkkoihin investoitiin paljon 1950–70-luvuilla. Tältä ajalta on yhä käytössä puupylväitä, joiden ikääntymisen takia korvausinvestointien tarve kasvaa. Hyvänä puolena tässä on että käyttövarmuuden parantamiseksi olemassa olevaa jakeluverkkoa ei tarvitse uusia ennenaikaisesti. Tutkimuksessa päähuomio on haja-asutusalueiden 20 kV keskijänniteverkon kehittämisessä, sillä yli 90 % asiakkaiden kokemista keskeytyksistä johtuu keskijänniteverkon vioista. Erityisesti johtorakenteisiin ja johtojen sijoittamiseen on kiinnitettävä huomiota. Käyttövarmuuden lisäksi jakeluverkkojen kehittämistä ohjaavia tekijöitä ovat taloudellisuus, ympäristön huomioiminen, viranomaisvalvonta sekä asiakkaiden ja omistajien odotukset. Haja-asutusalueilla taloudelliset haasteet ovat suuret vakituisen väestön vähenemisen ja mahdollisesti sähköntarpeen pienenemisen takia. Taloudellisuus korostuu ja riskit kasvavat, kun tuottojen määrä supistuu tarvittaviin jakeluverkon investointeihin ja ylläpitokustannuksiin verrattuna. Ristiriitaa aiheuttaa se, että asiakkaat odottavat sähkönjakelulta parempaa luotettavuutta, mutta paremmasta sähkönlaadusta ei olla valmiita maksamaan juurikaan nykyistä enempää. Jakeluverkkojen kehittämistä voi hidastaa myös viranomaisvalvonta, jos tuottoja ei voida lisätä investointien lisätarpeiden suhteessa. Tutkimuksessa on analysoitu yleisellä tasolla kaapeloinnin lisäämistä, korkeiden pylväiden käyttämistä, leveitä johtokatuja, edullisten ja yksinkertaisten sähköasemien rakentamista haja-asutusalueille ja automaatioasemien lisäämistä keskijänniteverkon solmupisteisiin. Erityisesti tutkimuksessa on analysoitu uutena tekniikkana 1000 V jännitteen käyttömahdollisuutta jakeluverkkojen kehittämisessä. Sähköjohtojen siirtäminen teiden varsiin parantaa käyttövarmuutta, vaikka johdot rakennetaan samalla tekniikalla kuin olemassa olevat johdot. Hajaasutusalueille rakennettavilla sähköasemilla pitkät syöttöjohdot voidaan jakaa pienemmiksi syöttöalueiksi, jolloin keskeytyksistä aiheutuvat haitat koskettavat kerrallaan pienempää asiakasmäärää. Samaan tulokseen päästään oikein sijoitetuilla ja toteutetuilla automaatioasemilla. Tutkimuksen mukaan lupaavaksi tekniikaksi jakeluverkkojen kehittämisessä on osoittautumassa 1000 V jänniteportaan ottaminen 400 V pienjännitteen lisäksi. 1000 V verkoilla voidaan korvata häiriöherkkiä 20 kV keskijänniteverkon lyhyitä, alle viiden kilometrin pituisia haarajohtoja ja haarajohtojen jatkeita, missä siirrettävät tehot ovat pieniä. Uudessa jakelujärjestelmässä sähkö tuodaan 1000 V jännitteellä lähelle asiakasta, jossa jännite muunnetaan normaaliksi asiakkaille soveltuvaksi 400/230 V jännitteeksi. Edullisuus perustuu siihen, että rakentamisessa käytetään samoja pienjännitejohtoja kuin asiakkaille menevässä 400 V pienjänniteverkossa. 1000 V jakelutekniikassa sekä investointikustannukset että ylläpitokustannukset ovat pienemmät kuin perinteisessä 20 kV ilmajohtotekniikassa. 1000 V johdot säästävät maisemaa, sillä ne eivät tarvitse leveää johtokatua kuten 20 kV keskijännitejohdot. 1000 V verkkojen käyttö soveltuukin erityisesti vapaa-ajanasuntojen sähköistykseen herkissä ranta- ja järvimaisemissa. 1000 V verkot mahdollistavat kaapeliauraamisen lisäämisen ja näin voidaan vähentää ympäristöä haittaavien kyllästettyjen pylväiden käyttöä. 1000 V jakeluverkkojen osalta tutkimustyön tuloksia on sovellettu suomalaisessa Suur-Savon Sähkö Oy:ssä. Käytännön kokemuksia 1000 V jakelujärjestelmästä on useista kymmenistä kohteista. Tutkimustulokset osoittavat, ettei keskijänniteverkon maakaapelointi hajaasutusalueilla ole taloudellisesti kannattavaa nykyisillä keskeytyksistä aiheutuvilla haitta-arvoilla, mutta jos keskeytyskustannusten arvostus kasvaa, tulee kaapelointi kannattavaksi monissa paikoissa. Myös myrskyisyyden ja myrskyistä aiheutuvien jakelukeskeytysten lisääntyminen tekisi kaapeloinnista kannattavan. Tulevaisuudessa jakeluverkkojen rakentaminen on entistä monimuotoisempi tehtävä, jossa taloudellisuuden ja käyttövarmuuden lisäksi on huomioitava asiakkaat, omistajat, viranomaiset ja ympäristö. Tutkimusta jakelutekniikan kehittämiseksi tarvitaan edelleen. Tulevaisuuden osalta haja-asutusalueiden jakeluverkkojen kehittämiseen liittyy paljon epävarmuuksia. Hajautetun kiinteistökohtaisen sähköntuotannon lisääntyminen voi tehdä jakeluverkoista nykyistä tarpeettomampia, mutta esimerkiksi liikenteen sähköistyminen voi kasvattaa jakeluverkkojen merkitystä. Tästä syystä jakeluverkkojen rakentamisessa tarvitaan joustavuutta, jotta tarvittaessa voidaan helposti sopeutua erilaisiin kehityssuuntiin.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the Thesis main focus is done on power flow development paths around the Baltic States as well as on market-based requirements for creation of the common Baltic electricity market. Current market regulations between the countries are presented; barriers for creating competitive common Baltic power market and for electricity trading with third countries are clarified; solutions are offered and corresponding road map is developed. Future power development paths around the Baltic States are analysed. For this purpose the 330 kV transmission grid of Estonia, Latvia and Lithuania is modelled in a power flow tool. Power flow calculations are carried out for winter and summer peak and off-peak load periods in 2020 with different combinations of interconnections. While carrying out power balance experiments several power flow patterns in the Baltic States are revealed. Conclusions are made about security of supply, grid congestion and transmission capacity availability for different scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis includes several thermal hydraulic analyses related to the Loviisa WER 440 nuclear power plant units. The work consists of experimental studies, analysis of the experiments, analysis of some plant transits and development of a calculational model for calculation of boric acid concentrations in the reactor. In the first part of the thesis, in the case of won of boric acid solution behaviour during long term cooling period of LOCAs, experiments were performed in scaled down test facilities. The experimental data together with the results of RELAPS/MOD3 simulations were used to develop a model for calculations of boric acid concentrations in the reactor during LOCAs. The results of calculations showed that margins to critical concentrations that would lead to boric acid crystallization were large, both in the reactor core and in the lower plenum. This was mainly caused by the fact that water in the primary cooling circuit includes borax (Na)BsO,.IOHZO), which enters the reactor when ECC water is taken from the sump and greatly increases boric acid solubility in water. In the second part, in the case of simulation of horizontal steam generators, experiments were performed with PACTEL integral test loop to simulate loss of feedwater transients. The PACTEL experiments, as well as earlier REWET III natural circulation tests, were analyzed with RELAPS/MOD3 Version Sm5 code. The analysis showed that the code was capable of simulating the main events during the experiments. However, in the case of loss of secondary side feedwater the code was not completely capable to simulate steam superheating in the secondary side of the steam generators. The third part of the work consists of simulations of Loviisa VVER reactor pump trip transients with RELAPSlMODI Eur, RELAPS/MOD3 and CATHARE codes. All three codes were capable to simulate the two selected pump trip transients and no significant differences were found between the results of different codes. Comparison of the calculated results with the data measured in the Loviisa plant also showed good agreement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objectives of this thesis areto identify the best elements from Information Technology Infrastructure Library financial management for an international company. The elements need to be customized to fit existing elements and the thesis needs to provide implementation proposal. The new IT financial management needs to improve cost visibility and bring benefits to the company. In order to find the best elements for IT financial management, there needs to be a research to discover the companys business needs. The ITIL library is used to find answers and solutions to the companys issues in IT financial management. Other IT frameworks can and will be used as well, if they are able to work with ITIL model. ITIL consists from budgeting, accounting and charging in IT financial management, which all needs to be investigated. In addition more ITIL elements such as contract management and supplier management can be used, in order to make IT financial management work better.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this Master’s thesis is to examine the IT Service Management (ITSM) capabilities of a large international company and develop a design for the IT Service Management of the company. The thesis consists of two parts: a literature review and a case study. The first part is the literature review. It examines different aspects of IT Service Management. The purpose of the literature review is to increase the credibility of the case study. In the case study, the IT Service Management of a large industrial company is assessed, and an improved design for IT Service Management is created. The services are limited to common IT services, and management is limited to operative management. To assess and develop the case company’s IT Service Management, the IT organization and its ITSM capabilities are analyzed, and on the basis of the analyses, an improved IT Service Management model is created. As a result of the analyses, it was found out that the management of the IT organization is function-oriented. Therefore, the organization needs a management model that breaks the functional borders and brings services to the center of management. The designed model aspires to achieve this by defining IT services and modeling management processes from the service perspective.