146 resultados para Electrical supply
Resumo:
This research report illustrates and examines new operation models for decreasing fixed costs and transforming them into variable costs in the field of paper industry. The report illustrates two cases – a new operation model for material logistics in maintenance and an examination of forklift truck fleet outsourcing solutions. Conventional material logistics in maintenance operation is illustrated and some problems related to conventional operation are identified. A new operation model that solves some of these problems is presented including descriptions of procurement and service contracts and sources of added value. Forklift truck fleet outsourcing solutions are examined by illustrating the responsibilities of a host company and a service provider both before and after outsourcing. The customer buys outsourcing services in order to improve its investment productivity. The mechanism of how these services affect the customer company’s investment productivity is illustrated.
Resumo:
Forest biomass represents a geographically distributed feedstock, and geographical location affects the greenhouse gas (GHG) performance of a given forest-bioenergy system in several ways. For example, biomass availability, forest operations, transportation possibilities and the distances involved, biomass end-use possibilities, fossil reference systems, and forest carbon balances all depend to some extent on location. The overall objective of this thesis was to assess the GHG emissions derived from supply and energy-utilization chains of forest biomass in Finland, with a specific focus on the effect of location in relation to forest biomass’s availability and the transportation possibilities. Biomass availability and transportation-network assessments were conducted through utilization of geographical information system methods, and the GHG emissions were assessed by means of lifecycle assessment. The thesis is based on four papers in which forest biomass supply on industrial scale was assessed. The feedstocks assessed in this thesis include harvesting residues, smalldiameter energy wood and stumps. The principal implication of the findings in this thesis is that in Finland, the location and availability of biomass in the proximity of a given energyutilization or energy-conversion plant is not a decisive factor in supply-chain GHG emissions or the possible GHG savings to be achieved with forest-biomass energy use. Therefore, for the greatest GHG reductions with limited forest-biomass resources, energy utilization of forest biomass in Finland should be directed to the locations where most GHG savings are achieved through replacement of fossil fuels. Furthermore, one should prioritize the types of forest biomass with the lowest direct supply-chain GHG emissions (e.g., from transport and comminution) and the lowest indirect ones (in particular, soil carbon-stock losses), regardless of location. In this respect, the best combination is to use harvesting residues in combined heat and power production, replacing peat or coal.
Resumo:
To describe the change of purchasing moving from administrative to strategic function academics have put forward maturity models which help practitioners to compare their purchasing activities to industry top performers and best practices. However, none of the models aim to distinguish the purchasing maturity from the after-sales point of view, even though after-sales activities are acknowledged as a relevant source of revenue, profit and competitive advantage in most manufacturing firms. The maturity of purchasing and supply management practices have a large impact to the overall performance of the spare parts supply chain and ultimately to the value creation and relationship building for the end customer. The research was done as a case study for a European after-sales organization which is part of a globally operating industrial firm specialized in heavy machinery. The study mapped the current state of the purchasing practices in the case organization and also distinguished the relevant areas for future development. The study was based on the purchasing maturity model developed by Schiele (2007) and investigated also how applicable is the maturity model in the spare parts supply chain context. Data for the assessment was gathered using five expert interviews inside the case organization and other parties involved in the company’s spare parts supply chain. Inventory management dimension was added to the original maturity model in order to better capture the important areas in a spare parts supply chain. The added five questions were deduced from the spare parts management literature and verified as relevant areas by the case organization’s personnel. Results indicate that largest need for development in the case organization are: better collaboration between sourcing and operative procurement functions, use of installed base information in the spare parts management, training plan development for new buyers, assessment of aligned KPI’s between the supply chain parties and better defining the role of after-sales sourcing. The purchasing maturity model used in this research worked well in H&R Leading, Controlling and Inventory Management dimensions. The assessment was more difficult to conduct in the Supplier related processes, Process integration and Organizational structure –dimensions, mainly because the assessment in these sections would for some parts require more company-wide assessment. Results indicate also that the purchasing maturity model developed by Schiele (2007) captures the relevant areas in the spare parts supply as well.
Resumo:
This Master’s Thesis studies performance management system and its benefits, risks and costs. Objective of the thesis is to describe and evaluate currently used supply chain performance management system (SCPMS) in a Finnish paper mill and its interfaces with its business unit’s SCPMS. As a result, the host company has improvement road map for improving its SCPMS. Used SCPMS in the host company and its interfaces to business unit’s SCPMS are described based on interviews held in the host company and the business unit. Evaluation of the host company’s SCPMS is based on literature study. For improvement road map, three areas in need of improvements are chosen. The study shows the need of high level top management commitment in successful performance management system implementation and usage, especially when the system is deployed to lower levels in the organization.
Resumo:
Implementing an enterprise resource planning (ERP) system often means a major change to an organization and involves significant risks. It is typical that many of the ERP system implementations fail resulting in tremendous damage to the business. Moreover, running normal business operations during an ERP system implementation is far more complicated than normally. This thesis focuses on how an organization should manage the ERP system implementation process in order to maintain supply performance during the implementation phase. The theoretical framework in this thesis focuses on ERP system implementations with a critical success factor approach. Critical success factors can be divided into strategic and tactical level success factors. By considering these critical success factors, ERP system implementation project’s timeline and best practices of an ERP implementation, a critical success factor based ERP system implementation management framework is presented. The framework can be used as a theoretical framework when the goal is to avoid ERP system implementation phase issues that are driven by the ERP system implementation project and that may decrease organization’s supply performance. This thesis is a case study that was written on an assignment to a confectionary company Cloetta Suomi Oy. In order to collect data, interviews of the case company personnel were conducted. In addition, several other data collection methods were used throughout the research process. These data collection methods include examination of presentations and archival records as well as direct observations in case company meetings and in various work duties. The results of this thesis indicate that there are several factors that may decrease organization’s supply performance during the ERP system implementation. These issues are categorized under external and internal issues and further into six risk drivers that are suppliers, customers, products, staff, information systems and other projects. After the description and categorization of each issue, the thesis focuses on finding solutions on how to avoid or mitigate the impact of these issues on the organization’s supply performance. This examination leads to several operational activities that are also practical to business practitioners. It is also stated that a successful ERP system implementation that also causes minimal disturbance to organization’s supply performance during the ERP system implementation, is achieved by considering three levels of actions.
Resumo:
The Finnish electricity distribution sector, rural areas in particular, is facing major challenges because of the economic regulation, tightening supply security requirements and the ageing network asset. Therefore, the target in the distribution network planning and asset management is to develop and renovate the networks to meet these challenges in compliance with the regulations in an economically feasible way. Concerning supply security, the new Finnish Electricity Market Act limits the maximum duration of electricity supply interruptions to six hours in urban areas and 36 hours in rural areas. This has a significant impact on distribution network planning, especially in rural areas where the distribution networks typically require extensive modifications and renovations to meet the supply security requirements. This doctoral thesis introduces a methodology to analyse electricity distribution system development. The methodology is based on and combines elements of reliability analysis, asset management and economic regulation. The analysis results can be applied, for instance, to evaluate the development of distribution reliability and to consider actions to meet the tightening regulatory requirements. Thus, the methodology produces information for strategic decision-making so that DSOs can respond to challenges arising in the electricity distribution sector. The key contributions of the thesis are a network renovation concept for rural areas, an analysis to assess supply security, and an evaluation of the effects of economic regulation on the strategic network planning. In addition, the thesis demonstrates how the reliability aspect affects the placement of automation devices and how the reserve power can be arranged in a rural area network.
Resumo:
This report summarizes the results of the survey HAVERI – Supply network risks in business. The survey was conducted in Finland during the spring and summer of year 2013. The survey is part of a large two-year research project started in June 2012 in Finland (on-going 06/2012–07/2014). The project is launched and financed by TEKES, the Finnish Funding Agency for Technology and Innovation, and executed together with the researchers from Lappeenranta University of Technology and Tampere University of Technology. The overall goal of this on-going research project is to find out the decision-making practices in the project-oriented companies in their purchasing decisions especially in the mechanical engineering and construction industries in Finland. The objective of the survey was to gain cross-sectional data concerning the challenges, risks and cost factors in Finnish project business companies. The results show that Finnish companies rely on their experience and supplier references in their risk management. In general, the understanding of the total cost structure varies among the industries and companies. The main cost factor in risk management was costs before the actual purchase decision. Overall, it seems that the monetary value of the whole project and capability of purchasing personnel are the main influencing factors on risk management activity in project purchasing.
Resumo:
Teollisuudessa yleinen trendi on saada entistä tehokkaampia, halvempia, hyötysuhteeltaan parempia ja fyysisiltä mitoiltaan pienempiä sähkökäyttöjä. Luonnollisesti nämä vaatimukset ovat samoja myös taajuusmuuttajilla. Näiden vaatimusten välillä täytyy aina tehdä kompromisseja ja kehittää uusia menetelmiä. Monissa teollisuuden sähkökäytöissä tarvitaan verkkovaihtosuuntaajaa syöttämään tehoa generaattorilta tai jarrutettavalta moottorilta sähköverkkoon. Verkkovaihtosuuntaajassa käytännössä tarvitaan aina LCL-suodin, joka on fyysisesti järjestelmän suurin ja kallein yksittäinen komponentti, ja luonnollisesti suuritehoinen laite vaatii suuren LCL-suotimen. LCL-Suotimen fyysinen koko on kääntäen verrannollinen kytkentätaajuuteen. Tässä diplomityössä esitellään interleaving eli limittelymenetelmä, jonka avulla pystytään kasvattamaan verkkovaihtosuuntaajan ekvivalenttista kytkentätaajuutta ja pienentämään virran värettä sekä kokonaisharmonista säröä. Menetelmästä aiheutuu myös merkittävä haaste, kiertovirrat, joiden suodatusta tutkitaan kahdella eri menetelmällä. Käytetyt suodatustavat ovat LCL-suodin, jossa on lisäksi CM-kuristin ja LCL-suodin, jossa käytetään solujen välistä muuntajaa, ICT:tä. Työ suoritettiin teoriatutkimuksena ja simuloimalla. Tulokset osoittavat, että molemmat suodatustavat voivat toimia todellisessa sovelluksessa. Kuitenkin vain ICT:n omaava suodin on selkeästi vastaavan kokoista kaksitasoista verkkovaihtosuuntaajan suodinta pienempi. Tutkimus osoittaa myös sen, että tutkitussa sovelluskohteessa pelkkä fyysinen suodin ei riitä suodattamaan kiertovirtoja, vaan säätimeen täytyy tehdä myös muutoksia.
Resumo:
Nowadays the Western companies are considered responsible for the social and environmental issues in their whole supply chains. To influence the practices of their suppliers the Western companies have created suppliers codes of conduct (SCCs) which express their requirements. Suppliers’ compliance with the SCCs is checked through audits. The purpose of this thesis is to analyze SCCs as a means for Western companies to ensure socially and environmentally responsible actions in their global supply chains, and the sub-objectives are to find out 1) how well do the SCCs and their auditing work at suppliers’ production sites and 2) how can possible problems related to SCCs and their auditing be solved. This is a qualitative research carried out in the form of a case study with two case companies. In this study both primary and secondary data is used. The primary data is collected in the form of interviews of the case company representatives and three external experts. Based on a theoretical framework of previous research in the fields of corporate social responsibility and supply chain management, a model with eleven factors, which influence the success of SCC implementation and the auditing of SCC –implementation, is drafted. Also several different best-practices to help to solve and avoid possible problems related to SCC -implementation and auditing have been identified from previous research. Based on the findings of this study the theoretical model has been updated adding two new influential factors. It seems that how well the SCC and its auditing work at suppliers’ production sites depends on the joint effect of thirteen influential factors: buyer’s purchasing policy, supplier’s motivation, buyer’s commitment, the solving of agency problems, the contents of the SCC, supplier’s role and the buyer-supplier –relationship, complexity of supply chain, the limitations of the smaller buyers, cooperation through a business association or multi-stakeholder system, the role of supplier’s employees, SCC –related communication and supplier’s understanding, cheating in audits and the auditors. The possible problems related to SCCs and their auditing can be solved by adopting best-practices. Nine of the theoretical best-practices stand out from the findings of this study: 1) two-way communication and collecting feedback from suppliers, 2) the philosophy of continuous improvement, 3) long-term business relationships with the supplier, 4) informing the supplier about the advantages of SCC –compliance, 5) rewarding code-compliant suppliers, 6) building collaborative, good buyer-supplier relationships, 7) supporting and advising the supplier, 8) joining a business association or multi-stakeholder system and 9) interviewing supplier’s employees as a part of the audits.
Resumo:
ABSTRACT Maria Peltola Electrical status epilepticus during sleep – Continuous spikes and waves during sleep Department of Clinical Neurophysiology, University of Turku Department of Clinical Neurophysiology and Department of Pediatric Neurology, Children’s Hospital, Helsinki University Central Hospital Annales Universitatis Turkuensis, Medica-Odontologica, Turku, Finland, 2014 Background: Electrical status epilepticus during sleep (ESES) is an EEG phenomenon of frequent spikes and waves occurring in slow sleep. ESES relates to cognitive deterioration in heterogeneous childhood epilepsies. Validated methods to quantitate ESES are missing. The clinical syndrome, called epileptic encephalopathy with continuous spikes and waves during sleep (CSWS) is pharmacoresistant in half of the patients. Limited data exists on surgical treatment of CSWS. Aims and methods: The effects of surgical treatment were studied by investigating electroclinical outcomes in 13 operated patients (nine callosotomies, four resections) with pharmacoresistant CSWS and cognitive decline. Secondly, an objective paradigm was searched for assessing ESES by the semiautomatic quantification of spike index (SI) and measuring spike strength from EEG. Results: Postoperatively, cognitive deterioration was stopped in 12 (92%) patients. Three out of four patients became seizure-free after resective surgery. Callosotomy resulted in greater than 90% reduction of atypical absences in six out of eight patients. The preoperative propagation of ESES from one hemisphere to the other was associated with a good response. Semiautomatic quantification of SI was a robust method when the maximal interspike interval of three seconds was used to determine the “continuous” discharge in ten EEGs. SI of the first hour of sleep appeared representative of the whole night SI. Furthermore, the spikes’ root mean square was found to be a stable measure of spike strength when spatially integrated over multiple electrodes during steady NREM sleep. Conclusions: Patients with pharmacoresistant CSWS, based on structural etiology, may benefit from resective surgery or corpus callosotomy regarding both seizure outcome and cognitive prognosis. The semiautomated SI quantification, with proper userdefined settings and the new spatially integrated measure of spike strength, are robust and promising tools for quantifying ESES. Keywords: Electrical status epilepticus during sleep, ESES, continuous spikes and waves during sleep, CSWS, epilepsy surgery, spike index, spike strength, RMS TIIVISTELMÄ Maria Peltola Unenaikainen sähköinen status epilepticus Kliininen neurofysiologia, Turun yliopisto Kliininen neurofysiologia ja lastenneurologia, Lasten ja nuorten sairaala, Helsingin yliopistollinen keskussairaala Annales Universitatis Turkuensis, Medica-Odontologica, Turku, Suomi, 2014 Tausta: Sähköinen status epilepticus unessa (ESES) on aivosähkökäyrä (EEG)-ilmiö, jossa hidasaaltounen aikana esiintyy tiheä piikkihidasaaltopurkaus. ESES:n kvantifioimiseen ei ole olemassa validoituja menetelmiä. ESES on liitetty kognitiivisen tason laskuun ja tällöin puhutaan CSWS (continuous spikes and waves during sleep) - oireyhtymästä. CSWS ei vastaa lääkehoitoon puolella potilaista ja sen epilepsiakirurgisesta hoidosta on olemassa vain vähän tietoa. Tavoitteet ja menetelmät: Selvitimme retrospektiivisesti epilepsiakirurgian vaikusta elektrokliinisiin löydöksiin 13:lla lääkeresistenttiä CSWS-oireyhtymää sairastavalla lapsella, joilla oli rakenteellinen aivojen poikkeavuus. Toinen tavoite oli löytää objektiivinen puoliautomaattinen tapa mitata purkauksen määrää ja piikkien voimakkuutta EEG:stä. Tulokset: Kognitiivisen tason jatkuva heikentyminen loppui 12 (92 %) potilaalla leikkauksen jälkeen. Kolme neljästä resektiopotilaasta tuli kohtauksettomaksi. Kallosotomian jälkeen kuudella kahdeksasta potilaasta päivittäiset kohtaukset vähenivät yli 90 %:lla. Purkauksen leviäminen leikkausta edeltävästi vain yhdestä hemisfääristä toiseen liittyi hyvään leikkaushoitovasteeseen. Piikki-indeksi, jossa käytetään jatkuvan purkauksen määritelmänä maksimissaan kolmea sekuntia piikkien välillä, osoittautui luotettavaksi menetelmäksi ESES:n kvantifioimiseen. Useammasta elektrodista integroitu piikkien neliöllinen keskiarvo oli piikin voimakkuuden vakaa mitta häiriintymättömässä NREM-unessa. Päätelmät: Lääkehoidolle vastaamatonta CSWS:ää sairastavat potilaat, joilla on rakenteellinen aivopoikkeavuus ja yhdensuuntainen purkauksen leviämismalli, näyttävät kohtausten vähenemisen lisäksi hyötyvän epilepsiakirurgiasta kognitiivisesti. Puoliautomaattinen piikki-indeksin kvantifiointi sopivilla käyttäjäasetuksilla ja uusi spatiaalisesti integroitu piikin voimakkuuden mittari ovat stabiileja ja lupaavia ESES:n kvantitatiivisia mittareita. Avainsanat: Unenaikainen sähköinen status epilepticus, ESES, CSWS, epilepsiakirurgia, piikki-indeksi, piikin voimakkuus, neliöllinen keskiarvo
Resumo:
This study examines the practice of supply chain management problems and the perceived demand information distortion’s (the bullwhip effect) reduction with the interfirm information system, which is delivered as a cloud service to a company operating in the telecommunications industry. The purpose is to shed light in practice that do the interfirm information system have impact on the performance of the supply chain and in particularly the reduction of bullwhip effect. In addition, a holistic case study of the global telecommunications company's supply chain is presented and also the challenges it’s facing, and this study also proposes some measures to improve the situation. The theoretical part consists of the supply chain and its management, as well as increasing the efficiency and introducing the theories and related previous research. In addition, study presents performance metrics for the bullwhip effect detection and tracking. The theoretical part ends in presenting cloud -based business intelligence theoretical framework used in the background of this study. The research strategy is a qualitative case study, supported by quantitative data, which is collected from a telecommunication sector company's databases. Qualitative data were gathered mainly with two open interviews and the e-mail exchange during the development project. In addition, other materials from the company were collected during the project and the company's web site information was also used as the source. The data was collected to a specific case study database in order to increase reliability. The results show that the bullwhip effect can be reduced with the interfirm information system and with the use of CPFR and S&OP models and in particularly combining them to an integrated business planning. According to this study the interfirm information system does not, however, solve all of the supply chain and their effectiveness -related problems, because also the company’s processes and human activities have a major impact.
Resumo:
Demand for increased energy efficiency has put an immense need for novel energy efficient systems. Electrical machines are considered as a much matured technology. Further improvement in this technology needs of finding new material to incorporate in electrical machines. Progress of carbon nanotubes research over the latest decade can open a new horizon in this aspect. Commonly known as ‘magic material’, carbon nanotubes (CNTs) have promising material properties that can change considerably the course of electrical machine design. It is believed that winding material based on carbon nanotubes create the biggest hope for a giant leap of modern technology and energy efficient systems. Though carbon nanotubes (CNTs) have shown amazing properties theoretically and practically during the latest 20 years, to the best knowledge of the author, no research has been carried out to find the future possibilities of utilizing carbon nanotubes as conductors in rotating electrical machines. In this thesis, the possibilities of utilizing carbon nanotubes in electrical machines have been studied. The design changes of electrical machine upon using carbon nanotubes instead of copper have been discussed vividly. A roadmap for this carbon nanotube winding machine has been discussed from synthesis, manufacturing and operational points of view.
Resumo:
This thesis studies how the case company could digitalize its supply chain and what kind of advantages this would create in the light of supply chain efficiency. The case company manufactures several pulp products that are used for paper, fabrics and packaging products by customers worldwide. The paper and pulp industry has been paying more and more attention to increasing supply chain efficiency with new operating and service models made possible by today’s information technology. The main focus of this study is on the supply chain between the case company and its key customers and the goal is to find ways to make the operations between them as efficient as possible. The study relays heavily on collaboration techniques and digitalization technologies. In addition to a theoretical framework, the study includes several empirical studies that offer real-life examples of how these theories and technologies are applied in operating environments similar to the case company. A plan with strategic and operational levels is created according to the findings of the previous sections to support the case company’s future operations. The plan is based on an RFID-supported collaboration model that aims to advance information sharing between the supply chain partners. The time for an RFID-investment is sought to be very optimal and the benefits of such system to be noteworthy, but challenging to measure in monetary terms.
Resumo:
In today’s global industrial service business, markets are dynamic and finding new ways of value creation towards customers has become more and more challenging. Customer orientation is needed because of the demanding after-sales business which is both quickly changing and stochastic in nature. In after-sales business customers require fast and reliable service for their spare part needs. This thesis objective is to clarify this challenging after-sales business environment and find ways to increase customer satisfaction via balanced measurement system which will help to find possible targets to reduce order cycle times in a large metal and mineral company Outotec (Filters)’ Spare Part Supply business line. In case study, internal documents and data and numerical calculations together with qualitative interviews with different persons in key roles of Spare Part Supply organizations are used to analyze the performance of different processes from the spare parts delivery function. The chosen performance measurement tool is Balanced Scorecard which is slightly modified to suit the lead time study from customer’s perspective better. Findings show that many different processes in spare parts supply are facing different kind of challenges in achieving the lead time levels wanted and that these processes’ problems seem to accumulate. Findings also show that putting effort in supply side challenges and information flows visibility should give the best results.