51 resultados para Operations, Surgical
Resumo:
With a Sales and Operations Planning (S&OP) process, a company aims to manage the demand and supply by planning and forecasting. The studied company uses an integrated S&OP process to improve the company's operations. The aim of this thesis is to develop this business process by finding the best possible way to manage the soft information in S&OP, whilst also understanding the importance and types (assumptions, risks and opportunities) of soft information in S&OP. The soft information in S&OP helps to refine future S&OP planning, taking into account the uncertainties that affect the balance of the long-term demand and supply (typically 12-18 months). The literature review was used to create a framework for soft information management process in S&OP. There were not found a concrete way how to manage soft information in the existing literature. In consequence of the poor literature available the Knowledge Management literature was used as the base for the framework creation, which was seen in the very same type of information management like the soft information management is. The framework created a four-stage process to manage soft information in S&OP that included also the required support systems. First phase is collecting and acquiring soft information in S&OP, which include also categorization. The categorization was the cornerstone to identify different requirements that needs to be taken into consideration when managing soft information in S&OP process. The next phase focus on storing data, which purpose is to ensure the soft information is managed in a common system (support system) in a way that the following phase makes it available to users in S&OP who need by help of sharing and applications process. The last phase target is to use the soft information to understand assumptions and thoughts of users behind the numbers in S&OP plans. With this soft management process the support system will have a key role. The support system, like S&OP tool, ensures that soft information is stored in the right places, kept up-to-date and relevancy. The soft information management process in S&OP strives to improve the relevant soft information documenting behind the S&OP plans into the S&OP support system. The process offers an opportunity to individuals to review, comment and evaluate soft information in S&OP made by their own or others. In the case company it was noticed that without a properly documented and distributed soft information in S&OP it was seen to cause mistrust towards the planning.
Resumo:
Professional services are an increasingly important group of economy and related to them there has been identified a fairly new concept called professional service operations management. However professional service operations management is still quite under-researched area which needs further research especially in specific contexts. This study aims to respond to that need by examining courts as an environment for operations management. As a result there is a preliminary structured description of what operations management is and could be in courts. The study also aims to inspire and tentatively classify possible areas for future research. Courts are examined based on three common perspectives for typical characteristics of professional services which can be identified in literature: the nature of customer role, the nature of professional work and the nature of process and product. The examination is based on research data from several research projects conducted in Finland and other European countries. Based on the examination it can be said that the operational environment of courts is highly complex and demanding because the case as an object of operations management tasks is challenging, the process sets strict requirements to the handling of the cases and the workforce is hard to direct.
Resumo:
Background: Interest in limb defects has grown after the thalidomide tragedy in the 1960s. As a result, congenital malformation registries, monitoring changes in birthprevalence and defect patterns, have been established in several countries. However, there are only a few true population based studies on birth prevalence of upper limb defects. The burden of hospital care among these children, specifically in terms of the number of admissions and total time spent in hospital, is also unknown. Aims and Methods: This study is based on information gathered from the Finnish Register of Congenital malformations (FRM) and the Finnish Hospital Discharge Register (FHDR). A total of 417 children born between 1993 and 2005 with an upper limb defect were gathered from the FRM. The upper limb defects were classified using the International Federation of Societies for Surgery of the Hand -classification that enables comparison with previous and future studies. Birth and live birth prevalence, sex and side distribution, frequency of associated anomalies as well as the proportion of perinatal and infant deaths according to the different subtypes were calculated. The number of hospital admissions, days spent in hospital, number and type of surgical operations were collected from the FHDR. Special features of two subgroups, radial ray defects (RRD) and constriction band syndrome (CBS), were explored. Results: Upper limb defects were observed in 417 of 753 342 consecutive births and in 392 of 750 461 live births. Birth prevalence was 5.5 per 10 000 births and 5.2 per 10 000 live births. Multiple anomalies or a known syndrome was found in 250 cases (60%). Perinatal mortality was 139 per 1000 births and infant mortality 135 per 1000 live births (overall Finnish perinatal mortality <5 per 1000 births and infant mortality 3.7 per 1000 live births). Altogether, 138 infants had RRD and 120 (87%) of these had either a known syndrome or multiple major anomalies. The proportion of perinatal deaths in RRD group was 29% (40/138) and infant deaths 35% (43/123). Fifty-one children had CBS in upper limbs. Fifteen of these (29%) had other major anomalies associated with constriction rings. The number of hospital admissions per year of children with congenital upper limb defects was 11-fold and the time spent in hospital 13-fold as compared with the general paediatric population. Conclusions: Birth prevalence of congenital upper limb defects was 5.5 per 10 000 births and 5.2 per 10 000 live births. RRD was especially associated with other major anomalies and high mortality. Nearly one third of the children with CBS also had other major anomalies suggesting different aetiologies inside the group. The annual burden of hospital care of children with congenital upper limb defects was at least 11-fold as compared with the general paediatric population.
Resumo:
The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.
Resumo:
Sales and operations research publications have increased significantly in the last decades. The concept of sales and operations planning (S&OP) has gained increased recognition and has been put forward as the area within Supply Chain Management (SCM). Development of S&OP is based on the need for determining future actions, both for sales and operations, since off-shoring, outsourcing, complex supply chains and extended lead times make challenges for responding to changes in the marketplace when they occur. Order intake of the case company has grown rapidly during the last years. Along with the growth, new challenges considering data management and information flow have arisen due to increasing customer orders. To manage these challenges, case company has implemented S&OP process, though initial process is in early stage and due to this, the process is not managing the increased customer orders adequately. Thesis objective is to explore extensively the S&OP process content of the case company and give further recommendations. Objectives are categorized into six different groups, to clarify the purpose of this thesis. Qualitative research methods used are active participant observation, qualitative interviews, enquiry, education, and a workshop. It is notable that demand planning was felt as cumbersome, so it is typically the biggest challenge in S&OP process. More proactive the sales forecasting can be, more expanded the time horizon of operational planning will turn out. S&OP process is 60 percent change management, 30 percent process development and 10 percent technology. The change management and continuous improvement can sometimes be arduous and set as secondary. It is important that different people are required to improve the process and the process is constantly evaluated. As well as, process governance is substantially in a central role and it has to be managed consciously. Generally, S&OP process was seen important and all the stakeholders were committed to the process. Particular sections were experienced more important than others, depending on the stakeholders’ point of views. Recommendations to objective groups are evaluated by the achievable benefit and resource requirement. The urgent and easily implemented improvement recommendations should be executed firstly. Next steps are to develop more coherent process structure and refine cost awareness. Afterwards demand planning, supply planning, and reporting should be developed more profoundly. For last, information technology system should be implemented to support the process phases.