31 resultados para Fractional Order Differentiator
Resumo:
This thesis was made for a large forest industry company’s business segment. The purpose of the study was to improve the performance of the order-to-delivery process of the business segment. The study proceeded in three phases. The first phase was to define customer expectations in the market. The second phase was to analyse the performance and the operations of the order-to-delivery process, and to define any challenges or problems in serving the customers. The third and final phase was improving the performance of the order-to-delivery process, within the scope defined by the first two phases. The analysis showed that the delivery reliability is an essential but a challenging issue in the case company’s markets. On delivery reliability standpoint, the most challenging factors were the detected information flow distortions within the company as well as in the whole supply chain, and the lack of horizontal control over the multi-stage process.
Embracing the dark : the magic order of Dragon Rouge : its practice in dark magic and meaning making
Resumo:
Digital reproduction, The National Library of Finland, Centre for Preservation and Digitisation, Mikkeli
Resumo:
This thesis discusses adaption of new project management tool at ABB Oy Motors and Generators business unit, Synchronous Machines profit centre. Thesis studies project modeling in general and buries in the Gate Model used at ABB Synchronous Machines. It is essential to understand Gate Model because this new project management tool, called Project Master Document, is created on the base of the existing project model. Thesis also analyzes goals and structure of Project Master Document in order to ease implementation of this new tool. Project Master Document aims to improved customer order fulfillment by clearing order handover interface. Office process, especially responsibilities and target dates, become also clearer after Master Document implementation. The document is built to be frame for whole order fulfillment process including check points for each gate of project model and updated memos from all project meetings. Furthermore, project progress will be clearly stated by status markings and visualized with colors.
Resumo:
For the paper mill profitability it is crucial to minimize overproduction and underproduction. Overproduction and underproduction both generate undesired costs and profit losses in paper mill production. This master’s thesis examines paper production order fulfillment subject from paper production level point of view. Research and development approach is selected due to clarification requirements in lately implemented manufacturing execution system. Manufacturing execution systems are generally expected to offer reliable and accurate information about mill production details. However, confusions are likely to occur after implementation of new manufacturing execution system. These confusions are usually harmful and become cumulatively more influential the longer they keep occurring. In this master’s thesis is presented actions to improve order fulfillment at paper mill production level. Central points of the improvement actions are a model for successful order fulfillment in paper mill production and manufacturing execution system catalogue configuration redesign. Improvement actions are implemented in Jokilaakso paper production plant and it is examined as a case study. In the end of this master’s thesis is presented performance measurements which demonstrate order fulfillment from case Jokilaakso.
Resumo:
Multiprocessor system-on-chip (MPSoC) designs utilize the available technology and communication architectures to meet the requirements of the upcoming applications. In MPSoC, the communication platform is both the key enabler, as well as the key differentiator for realizing efficient MPSoCs. It provides product differentiation to meet a diverse, multi-dimensional set of design constraints, including performance, power, energy, reconfigurability, scalability, cost, reliability and time-to-market. The communication resources of a single interconnection platform cannot be fully utilized by all kind of applications, such as the availability of higher communication bandwidth for computation but not data intensive applications is often unfeasible in the practical implementation. This thesis aims to perform the architecture-level design space exploration towards efficient and scalable resource utilization for MPSoC communication architecture. In order to meet the performance requirements within the design constraints, careful selection of MPSoC communication platform, resource aware partitioning and mapping of the application play important role. To enhance the utilization of communication resources, variety of techniques such as resource sharing, multicast to avoid re-transmission of identical data, and adaptive routing can be used. For implementation, these techniques should be customized according to the platform architecture. To address the resource utilization of MPSoC communication platforms, variety of architectures with different design parameters and performance levels, namely Segmented bus (SegBus), Network-on-Chip (NoC) and Three-Dimensional NoC (3D-NoC), are selected. Average packet latency and power consumption are the evaluation parameters for the proposed techniques. In conventional computing architectures, fault on a component makes the connected fault-free components inoperative. Resource sharing approach can utilize the fault-free components to retain the system performance by reducing the impact of faults. Design space exploration also guides to narrow down the selection of MPSoC architecture, which can meet the performance requirements with design constraints.
Resumo:
Kandidaatintyön tavoitteena on tutkia engineer-to-order -toimitusketjun tyypillisiä tärkeimpiä kilpailutekijöitä sekä esittää esimerkkiratkaisu siitä, millaisella suorituskyvyn mittaristolla engineer-to-order toimitusketjua voidaan ohjata kohti tärkeimpien kilpailutekijöiden vahvistamista. Työssä luodaan katsaus ETO -ympäristön erityispiirteisiin ja esitetään tekijöitä, joita suorituskyvyn mittaamisessa tulisi huomioida tässä ympäristössä.
Resumo:
Today’s electrical machine technology allows increasing the wind turbine output power by an order of magnitude from the technology that existed only ten years ago. However, it is sometimes argued that high-power direct-drive wind turbine generators will prove to be of limited practical importance because of their relatively large size and weight. The limited space for the generator in a wind turbine application together with the growing use of wind energy pose a challenge for the design engineers who are trying to increase torque without making the generator larger. When it comes to high torque density, the limiting factor in every electrical machine is heat, and if the electrical machine parts exceed their maximum allowable continuous operating temperature, even for a short time, they can suffer permanent damage. Therefore, highly efficient thermal design or cooling methods is needed. One of the promising solutions to enhance heat transfer performances of high-power, low-speed electrical machines is the direct cooling of the windings. This doctoral dissertation proposes a rotor-surface-magnet synchronous generator with a fractional slot nonoverlapping stator winding made of hollow conductors, through which liquid coolant can be passed directly during the application of current in order to increase the convective heat transfer capabilities and reduce the generator mass. This doctoral dissertation focuses on the electromagnetic design of a liquid-cooled direct-drive permanent-magnet synchronous generator (LC DD-PMSG) for a directdrive wind turbine application. The analytical calculation of the magnetic field distribution is carried out with the ambition of fast and accurate predicting of the main dimensions of the machine and especially the thickness of the permanent magnets; the generator electromagnetic parameters as well as the design optimization. The focus is on the generator design with a fractional slot non-overlapping winding placed into open stator slots. This is an a priori selection to guarantee easy manufacturing of the LC winding. A thermal analysis of the LC DD-PMSG based on a lumped parameter thermal model takes place with the ambition of evaluating the generator thermal performance. The thermal model was adapted to take into account the uneven copper loss distribution resulting from the skin effect as well as the effect of temperature on the copper winding resistance and the thermophysical properties of the coolant. The developed lumpedparameter thermal model and the analytical calculation of the magnetic field distribution can both be integrated with the presented algorithm to optimize an LC DD-PMSG design. Based on an instrumented small prototype with liquid-cooled tooth-coils, the following targets have been achieved: experimental determination of the performance of the direct liquid cooling of the stator winding and validating the temperatures predicted by an analytical thermal model; proving the feasibility of manufacturing the liquid-cooled tooth-coil winding; moreover, demonstration of the objectives of the project to potential customers.
Resumo:
This study examines information security as a process (information securing) in terms of what it does, especially beyond its obvious role of protector. It investigates concepts related to ‘ontology of becoming’, and examines what it is that information securing produces. The research is theory driven and draws upon three fields: sociology (especially actor-network theory), philosophy (especially Gilles Deleuze and Félix Guattari’s concept of ‘machine’, ‘territory’ and ‘becoming’, and Michel Serres’s concept of ‘parasite’), and information systems science (the subject of information security). Social engineering (used here in the sense of breaking into systems through non-technical means) and software cracker groups (groups which remove copy protection systems from software) are analysed as examples of breaches of information security. Firstly, the study finds that information securing is always interruptive: every entity (regardless of whether or not it is malicious) that becomes connected to information security is interrupted. Furthermore, every entity changes, becomes different, as it makes a connection with information security (ontology of becoming). Moreover, information security organizes entities into different territories. However, the territories – the insides and outsides of information systems – are ontologically similar; the only difference is in the order of the territories, not in the ontological status of entities that inhabit the territories. In other words, malicious software is ontologically similar to benign software; they both are users in terms of a system. The difference is based on the order of the system and users: who uses the system and what the system is used for. Secondly, the research shows that information security is always external (in the terms of this study it is a ‘parasite’) to the information system that it protects. Information securing creates and maintains order while simultaneously disrupting the existing order of the system that it protects. For example, in terms of software itself, the implementation of a copy protection system is an entirely external addition. In fact, this parasitic addition makes software different. Thus, information security disrupts that which it is supposed to defend from disruption. Finally, it is asserted that, in its interruption, information security is a connector that creates passages; it connects users to systems while also creating its own threats. For example, copy protection systems invite crackers and information security policies entice social engineers to use and exploit information security techniques in a novel manner.
Resumo:
Wind energy has obtained outstanding expectations due to risks of global warming and nuclear energy production plant accidents. Nowadays, wind farms are often constructed in areas of complex terrain. A potential wind farm location must have the site thoroughly surveyed and the wind climatology analyzed before installing any hardware. Therefore, modeling of Atmospheric Boundary Layer (ABL) flows over complex terrains containing, e.g. hills, forest, and lakes is of great interest in wind energy applications, as it can help in locating and optimizing the wind farms. Numerical modeling of wind flows using Computational Fluid Dynamics (CFD) has become a popular technique during the last few decades. Due to the inherent flow variability and large-scale unsteadiness typical in ABL flows in general and especially over complex terrains, the flow can be difficult to be predicted accurately enough by using the Reynolds-Averaged Navier-Stokes equations (RANS). Large- Eddy Simulation (LES) resolves the largest and thus most important turbulent eddies and models only the small-scale motions which are more universal than the large eddies and thus easier to model. Therefore, LES is expected to be more suitable for this kind of simulations although it is computationally more expensive than the RANS approach. With the fast development of computers and open-source CFD software during the recent years, the application of LES toward atmospheric flow is becoming increasingly common nowadays. The aim of the work is to simulate atmospheric flows over realistic and complex terrains by means of LES. Evaluation of potential in-land wind park locations will be the main application for these simulations. Development of the LES methodology to simulate the atmospheric flows over realistic terrains is reported in the thesis. The work also aims at validating the LES methodology at a real scale. In the thesis, LES are carried out for flow problems ranging from basic channel flows to real atmospheric flows over one of the most recent real-life complex terrain problems, the Bolund hill. All the simulations reported in the thesis are carried out using a new OpenFOAM® -based LES solver. The solver uses the 4th order time-accurate Runge-Kutta scheme and a fractional step method. Moreover, development of the LES methodology includes special attention to two boundary conditions: the upstream (inflow) and wall boundary conditions. The upstream boundary condition is generated by using the so-called recycling technique, in which the instantaneous flow properties are sampled on aplane downstream of the inlet and mapped back to the inlet at each time step. This technique develops the upstream boundary-layer flow together with the inflow turbulence without using any precursor simulation and thus within a single computational domain. The roughness of the terrain surface is modeled by implementing a new wall function into OpenFOAM® during the thesis work. Both, the recycling method and the newly implemented wall function, are validated for the channel flows at relatively high Reynolds number before applying them to the atmospheric flow applications. After validating the LES model over simple flows, the simulations are carried out for atmospheric boundary-layer flows over two types of hills: first, two-dimensional wind-tunnel hill profiles and second, the Bolund hill located in Roskilde Fjord, Denmark. For the twodimensional wind-tunnel hills, the study focuses on the overall flow behavior as a function of the hill slope. Moreover, the simulations are repeated using another wall function suitable for smooth surfaces, which already existed in OpenFOAM® , in order to study the sensitivity of the flow to the surface roughness in ABL flows. The simulated results obtained using the two wall functions are compared against the wind-tunnel measurements. It is shown that LES using the implemented wall function produces overall satisfactory results on the turbulent flow over the two-dimensional hills. The prediction of the flow separation and reattachment-length for the steeper hill is closer to the measurements than the other numerical studies reported in the past for the same hill geometry. The field measurement campaign performed over the Bolund hill provides the most recent field-experiment dataset for the mean flow and the turbulence properties. A number of research groups have simulated the wind flows over the Bolund hill. Due to the challenging features of the hill such as the almost vertical hill slope, it is considered as an ideal experimental test case for validating micro-scale CFD models for wind energy applications. In this work, the simulated results obtained for two wind directions are compared against the field measurements. It is shown that the present LES can reproduce the complex turbulent wind flow structures over a complicated terrain such as the Bolund hill. Especially, the present LES results show the best prediction of the turbulent kinetic energy with an average error of 24.1%, which is a 43% smaller than any other model results reported in the past for the Bolund case. Finally, the validated LES methodology is demonstrated to simulate the wind flow over the existing Muukko wind farm located in South-Eastern Finland. The simulation is carried out only for one wind direction and the results on the instantaneous and time-averaged wind speeds are briefly reported. The demonstration case is followed by discussions on the practical aspects of LES for the wind resource assessment over a realistic inland wind farm.
Resumo:
Tämän kandidaatinyön tavoitteena on selvittää keinoja joilla ETO-yhtiö voi kehittää tuotettaan ja tuotantoaan kohti massakustomointi. Lisäksi selvitetään mitkä asiat vaikuttavat asiakastilauksen kytkentäpisteen asettamiseen siirtyessä massakustomointiin. Työ on tehty kirjallisuuskatsauksena. Esitettyjen tietojen ja tulosten pohjana on alan kirjallisuus sekä julkaistut artikkelit. Työn perusteella voidaan todeta että parhaimmat keinot massakustomoinnin tavoitteluun ETO-yhtiölle ovat; tuotannon ja tuotteiden kehittäminen siten että pystytään hyödyntämään modularisointia ja komponenttien standardointia, lisäksi tuotesuunnitteluun käytettävää aikaa tulee vähentää automatisoimalla tuotesuunnittelua tai käyttämällä standardi suunnitelmia. ETO-yhtiössä siirtyessä massakustomointiin tulee asiakastilauksen kytkentäpisteen paikkaa asetettaessa ottaa huomioon tuotannon ja suunnittelun ulottuvuus kytkettynä asiakkaan vaatimuksiin.
Developing a standard costing system for a customer oriented make-to-order company : case: Carrus Oy