10 resultados para pn junction diodes

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The joint between two lanes of asphalt pavement is often the first area of a roadway which shows signs of deterioration and requires maintenance. As the final lift of hot asphalt is being placed in a construction project, it is being forced p against the adjoining lane of cold asphalt, forming the longitudinal joint. The mating of the two lanes, to form a high quality seal, is often not fully successful and later results in premature stripping or raveling as water enters the unsealed joint. The application of a hot poured rubberized asphaltic joint sealant along the joint face in the final stage of construction should help to form a watertight joint seal. A new product, especially formulated for the longitudinal joint in asphalt pavements was proposed to improve joint sealing. The following describes the experimental application of the new product, Crafco, PN 34524.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the Grand Junction Municipal Utilities, Grand Junction, Iowa for the period December 1, 2013 through November 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the City of Pacific Junction for the period July 1, 2008 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Compilation report on the City of Grand Junction, Iowa, for the year ended June 30, 2014

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Today you will be biking over the Iowa and Cedar rivers, two major rivers hit by the Iowa flood of 2008. Three miles northeast of North Liberty you’ll cross the Iowa River. The river crested on June 15, 2008 at a record 31.53 ft., three feet higher than the previous record during the flood of 1993. The flooding river caused extensive damage to the University of Iowa (see cover photo of Iowa Memorial Union taken by Univ. Relations, Univ. of Iowa), Coralville, and numerous smaller towns. The flooding of the Cedar River, which RAGBRAI will cross at Sutliff, caused even greater damage. At Cedar Rapids, the 2008 flood crest of 31.12 ft. was over 11 ft. higher than the previous record set in 1851! This massive amount of water inundated downtown Cedar Rapids, Palo, and Columbus Junction and caused massive damage to buildings and infrastructure. When crossing the Cedar River at Sutliff, be sure to look to your right to see the remains of the Historic Sutliff Bridge, one of the many casualties of the Iowa flood of 2008.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa is currently evaluating the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC}. This was the sixth project this process has been used in. This project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed this year with the surface course to be let at a later date. There are four test sections, two sections with conventional mixtures and two with ARC mixtures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

An optimum allocation model has been utilized to examine the existing allocation of highway segments to maintenance garages in the Tama and Blairstown study area. The model has also been used to evaluate the financial impact of closing the highway maintenance garages at Tama and Blairstown and building a new garage at the junction of U.S. 30 and Iowa 21. The examination of the study area shows that only 13 of 91 highway segments were reallocated under optimum procedures at an annual operational savings of approximately $13,200. The study concludes there would be an annual operational savings of approximately $48,200 if the garages at Tama and Blairstown were closed and a new garage was built at the junction of U.S. 30 and Iowa 21.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa has evaluated the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC). This was the sixth project using this process. The project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed during this research with the surface course to be let at a later date. There were four test sections, two sections with conventional mixtures and two with ARC mixtures. There were no significant differences in placement or performance between the two mix types. The cost of the ARC mixture was significantly higher.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The proposed project will include the construction of a sanitary sewer collection system and a community gravel filter wastewater treatment system in the unsewered community of Maple River Junction in Carroll County. The system will be built to include approximately 1,150 feet of 4-inch sanitary sewer main, 3,540 feet of 4-inch service main an approximately 35 septic tanks. Some existing 4-inch PVC sewer piping as well as existing septic tanks in good condition will continue to be used in order to control capital costs.