07014-005 Maple River Watershed Final Report
| Data(s) |
20/04/2012
|
|---|---|
| Resumo |
The proposed project will include the construction of a sanitary sewer collection system and a community gravel filter wastewater treatment system in the unsewered community of Maple River Junction in Carroll County. The system will be built to include approximately 1,150 feet of 4-inch sanitary sewer main, 3,540 feet of 4-inch service main an approximately 35 septic tanks. Some existing 4-inch PVC sewer piping as well as existing septic tanks in good condition will continue to be used in order to control capital costs. |
| Formato |
|
| Identificador |
http://publications.iowa.gov/21296/1/7014-005%20Maple%20River%20Junction%20FINAL%20report.pdf (2012) 07014-005 Maple River Watershed Final Report. Agriculture and Land Stewardship |
| Idioma(s) |
en |
| Relação |
http://publications.iowa.gov/21296/ |
| Palavras-Chave | #Water resources #Water quality |
| Tipo |
Departmental Report NonPeerReviewed |