07014-005 Maple River Watershed Final Report


Autoria(s): Desconhecido
Data(s)

20/04/2012

Resumo

The proposed project will include the construction of a sanitary sewer collection system and a community gravel filter wastewater treatment system in the unsewered community of Maple River Junction in Carroll County. The system will be built to include approximately 1,150 feet of 4-inch sanitary sewer main, 3,540 feet of 4-inch service main an approximately 35 septic tanks. Some existing 4-inch PVC sewer piping as well as existing septic tanks in good condition will continue to be used in order to control capital costs.

Formato

pdf

Identificador

http://publications.iowa.gov/21296/1/7014-005%20Maple%20River%20Junction%20FINAL%20report.pdf

(2012) 07014-005 Maple River Watershed Final Report. Agriculture and Land Stewardship

Idioma(s)

en

Relação

http://publications.iowa.gov/21296/

Palavras-Chave #Water resources #Water quality
Tipo

Departmental Report

NonPeerReviewed