Resumo:
This report describes the work accomplished to date on research project HR-173, A Computer Based Information System for County Equipment Cost Records, and presents the initial design for this system. The specific topics discussed here are findings from the analysis of information needs, the system specifications developed from these findings, and the proposed system design based upon the system specifications. The initial system design will include tentative input designs for capturing input data, output designs to show the output formats and the items to be output for use in decision making, file design showing the organization of information to be kept on each piece of equipment in the computer data file, and general system design explaining how the entire system will operate. The Steering Committee appointed by Iowa Highway Research Board is asked to study this report, make appropriate suggestions, and give approval to the proposed design subject to any suggestions made. This approval will permit the designer to proceed promptly with the development of the computer program implementation phase of the design.
Resumo:
Over the past several years we conducted a comprehensive study on the pore systems of limestones used as coarse aggregate in portland cement concrete (pee) and their relationship to freeze-thaw aggregate failure. A simple test called the Iowa Pore Index Test was developed and used to identify those coarse aggregates that had freeze-thaw susceptible pore systems. Basically, it identified those aggregates that could take on a considerable amount of water but only at a slow rate. The assumption was that if an aggregate would take on a considerable amount of water at a slow rate, its pore system would impede the outward movement of water through a critically saturated particle during freezing, causing particle fracture. The test was quite successful when used to identify aggregates containing susceptible pore systems if the aggregates were clean carbonates containing less than 2% or 3% insolubles. The correlation between service record, ASTM C666B and the pore index test was good, but not good enough. It became apparent over the past year that there were factors other than the pore system that could cause an aggregate to fail when used in pee. The role that silica and clay play in aggregate durability was studied.
Resumo:
Approximately ten million tons of waste bituminous roofing are torn off annually in the United States. This volume is a major factor in the rapid filling of landfills. In 1995, Benton County, Iowa initiated a program to cost effectively recycle torn off waste shingles. Nine hundred tons of waste shingles were ground using a Maxigrind. A magnetic roller on the discharge conveyor removed most of the nails. Five hundred tons of the ground waste shingles were blade mixed into 0.6 km (0.4 mi) of a crushed stone granular surfaced Benton County rural secondary roadway. A magnet attached to the motor grader removed another 1/3 kg (3/4 lb) of nails during the spreading and mixing operation on the 0.6 km (0.4 mi) section of roadway. The bitumen of the waste shingles was very effective in providing a dust free granular surfaced roadway. It remains relatively dust free one year after treatment.
Resumo:
The Iowa Department of Transportation (Iowa DOT) UTW Project (HR-559) initiated Ultra-Thin Whitetopping in Iowa. The project is located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. The above listed research project lasted for five years, and then was extended for another five year period. The new phase of the project (TR 432) was initiated by removing cracked panels existing in the 2-inch thick PCC sections and replacing them with three inches of PCC. The project extension provides an increased understanding of slab bonding conditions over a longer period, as well as knowledge regarding the behavior of the newly rehabilitated areas. This report documents the rehabilitation of the PCC patching of all fractured panels and several cracked panels, taking place in September of 2001.
Resumo:
This report provides updates on the WPAC recommendations to legislature, including actions taken on those recommendations and any follow-up recommendations from WPAC. Recommendations include documentation of activities, and the needs and challenges toward making progress in protecting Iowa’s water resources, identified by WPAC in coordination with all agencies and stakeholders in the management of the state’s water resources in a sustainable, fiscally responsible, and environmentally conscientious manner.
Resumo:
Integral abutment bridges are constructed without an expansion joint in the superstructure of the bridge; therefore, the bridge girders, deck, abutment diaphragms, and abutments are monolithically constructed. The abutment piles in an integral abutment bridge are vertically orientated, and they are embedded into the pile cap. When this type of a bridge experiences thermal expansion or contraction, horizontal displacements are induced at the top of the abutment piles. The flexibility of the abutment piles eliminates the need to provide an expansion joint at the inside face to the abutments: Integral abutment bridge construction has been used in Iowa and other states for many years. This research is evaluating the performance of integral abutment bridges by investigating thermally induced displacements, strains, and temperatures in two Iowa bridges. Each bridge has a skewed alignment, contains five prestressed concrete girders that support a 30-ft wide roadway for three spans, and involves a water crossing. The bridges will be monitored for about two years. For each bridge, an instrumentation package includes measurement devices and hardware and software support systems. The measurement devices are displacement transducers, strain gages, and thermocouples. The hardware and software systems include a data-logger; multiplexers; directline telephone service and computer terminal modem; direct-line electrical power; lap-top computer; and an assortment of computer programs for monitoring, transmitting, and management of the data. Instrumentation has been installed on a bridge located in Guthrie County, and similar instrumentation is currently being installed on a bridge located in Story County. Preliminary test results for the bridge located in Guthrie County have revealed that temperature changes of the bridge deck and girders induce both longitudinal and transverse displacements of the abutments and significant flexural strains in the abutment piles. For an average temperature range of 73° F for the superstructure concrete in the bridge located in Guthrie County, the change in the bridge length was about 1 118 in. and the maximum, strong-axis, flexural-strain range for one of the abutment piles was about 400 micro-strains, which corresponds to a stress range of about 11,600 psi.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.
Resumo:
Many early Iowa Portland Cement Concrete (PCC) pavements provided good performance without deterioration for more than 50 years. In the late 1950's, Iowa was faced with severe PCC pavement deterioration called D cracking due to crushed limestone containing a bad pore system. Selective quarrying solved the problem. In 1990, cracking deterioration was identified on a three year old US 20 pavement in central Iowa. The coarse aggregate was a crushed limestone with an excellent history of performance in PCC pavement. Examination of cores showed very few cracks through the coarse aggregate particles. The cracks were predominately confined to the matrix. A high resolution, low vacuum Hitachi Scanning Electron Microscope (SEM) with an energy dispersion detector was used to investigate the deterioration. Subsequent evaluation identified very little concentration of silica gel (silicon-Si), but did identify substantial amounts of sulfur-s and aluminum-Al (assumed to be ettringite) in the air voids. Some of these voids have cracks radiating from them leading us to conclude that the ettringite filled voids were a center of pressure causing the crack. The ettringite in the voids, after being subjected to sodium chloride (NaCl) brine, initially swells and then dissolves. The research has led to the conclusion that the premature deterioration may be due to ettringite and may have been mistakenly identified as Alkali-Silica reactivity (ASR).
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.
Resumo:
This report is a brief overview of the recent Iowa Department of Transportation research in the area of durability of Portland cement, concrete under the direction of Wendeli Dubberke. Present plans are to publish a more detailed report on low Portland cement concrete- durability research in January, 1985.
Resumo:
Portland Cement Concrete (PCC) pavement has served the State of Iowa well for many years. The oldest Iowa pavement was placed in LeMars in 1904. Beginning in 1931, many miles of PCC pavement were built to "get out of the mud.” Many of these early pavements provided good performance without deterioration for more than 50 years. In the late 1950's, Iowa was faced with severe PCC pavement deterioration referred to as D cracking. Research identified the cause of this deterioration as crushed limestone containing a bad pore system. Selective quarrying and ledge control has alleviated this problem. In 1990, cracking deterioration was identified on a three year old pavement on us 20 in central Iowa. The coarse aggregate was a crushed limestone with an excellent history of performance in PCC pavement. Examination of cores showed very few cracks through the coarse aggregate particles. The cracks were predominately confined to the matrix. The deterioration was identified as alkali-silica reactivity (ASR) by a consultant.
Precast Concrete Panel Thickness for Epoxy-Coated Prestressing Strands, HR-353, Interim Report, 1994
Resumo:
A recommended minimum thickness for prestressed concrete (P/C) bridge deck panels containing 3/8-in. diameter, 270-ksi, low-relaxation, grit-impregnated, epoxy-coated prestressing strands is being evaluated by testing prototype panel specimens. As of January 1994, specimens from ten castings have been tested. The specimens in the first five castings were constructed to establish a preliminary minimum thickness for P/C panels. The specimens in the last five castings were constructed to 1) confirm the minimum panel thickness requirement, 2) measure the development length of epoxy-coated strands in specimens containing multiple strands, 3) measure the development length of uncoated strands in specimens containing multiple and single strands, 4) observe if concrete cracks form in thin panel specimens that have a raked top surface and are reinforced with welded wire fabric and either epoxy-coated or uncoated strands, 5) measure the transfer length for specimens containing a single uncoated strand, and 6) observe the seating characteristics of the grips used for uncoated strand and epoxy-coated strands. These tests have produced several initial findings. The preliminary recommended thickness for P/C panels containing grit-impregnated, epoxy-coated strands is 3 in. and the tentative development length for uncoated and coated multiple strands is approximately 45 in. and 24 in., respectively. Further tests will address confirmation of the recommended P/C panel thickness and establish the transfer and development lengths of single and multiple, uncoated and grit-impregnated epoxy-coated strands.
Resumo:
Precast prestressed concrete panels have been used in bridge deck construction in Iowa and many other states. To investigate the performance of these panels at abutment or pier diaphragm locations for bridges with various skew angles, a research program involving both analytical and experimental aspects, is being conducted. This interim report presents the status of the research with respect to four tasks. Task 1 which involves a literature review and two surveys is essentially complete. Task 2 which involved field investigations of three Iowa bridges containing precast panel subdecks has been completed. Based on the findings of these investigations, future inspections are recommended to evaluate potential panel deterioration due to possible corrosion of the prestressed strands. Task 3 is the experimental program which has been established to monitor the behavior of five configurations of full scale composite deck slabs. Three dimensional test and instrumentation frameworks have been constructed to load and monitor the slab specimens. The first slab configuration representing an interior panel condition is being tested and preliminary results are presented for one of these tests in this interim report. Task 4 involves the analytical investigation of the experimental specimens. Finite element methods are being applied to analytically predict the behavior of the test specimens. The first test configuration of the interior panel condition has been analyzed for the same loads used in the laboratory, and the results are presented herein. Very good correlation between the analytical and experimental results has occurred.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pin-connected, high-truss, single-lane bridge, was selected for a comprehensive testing program which included ultimate load tests, service load tests, and a supplementary test program. A second bridge was used for a limited service load test program. The results of the research are detailed in two interim reports. The first interim report outlines the ultimate load tests and the second interim report details the results of the service load and supplementary test program. This report presents a summary of these findings along with recommendations for implementation of the findings.
Resumo:
The overall objective of the work summarized in this report and in the interim report was to study the effects of targeted implement-of-husbandry loads. This report is to complement phase I of this work, which was summarized in the interim report, entitled Response of Iowa Pavements to Heavy Agricultural Loads (December 1999). The response of newly constructed Portland cement concrete (PCC) and asphalt cement concrete (ACC) pavements under semitruck, single-axle single-tire grain wagon, single-axle dual-tire grain wagon, tandem and tridem tank wagons were summarized in the interim report. Phase II of this project, presented herein, was to complete the study in terms of how tracked agricultural vehicles relate to the reference 20,000-pound single-axle semi-truck. In this report the response of these two pavements under a tracked grain wagon is documented.