9 resultados para Logistica integrata nel Supply Chain Management
em RUN (Repositório da Universidade Nova de Lisboa) - FCT (Faculdade de Cienecias e Technologia), Universidade Nova de Lisboa (UNL), Portugal
Resumo:
Unilever Jerónimo Martins is a Portuguese joint-venture leading firm in what concerns the supply chain industry of fast-moving consumer goods in Portugal. The scope of analysis of this Work Project is focusing on Unilever-JM operations and services in the Portuguese market regarding quality, efficiency and effectiveness over B2B customers. It will be analysed the possibility of development and implementation of a performance measurement system, Tableau de Bord, which will be crucial for the identification of potential opportunities of improvement with impact in the supply chain processes. This will be completed through the establishment of KPI’s to monitor and manage periodically logistics, planning and customer service processes’ performance, which are the ones where the bottlenecks are impacting more in the supply chain. In this work project the nexus causality for the problems will also be discussed and some recommendations will be prepared to tackle the inefficiencies found through the monitoring of the previous core processes, in order to improve efficacy and quality service of the supply chain.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
Field Lab of Entrepreneurial Innovative Ventures
Resumo:
The purpose of this paper is to conduct a methodical drawback analysis of a financial supplier risk management approach which is currently implemented in the automotive industry. Based on identified methodical flaws, the risk assessment model is further developed by introducing a malus system which incorporates hidden risks into the model and by revising the derivation of the most central risk measure in the current model. Both methodical changes lead to significant enhancements in terms of risk assessment accuracy, supplier identification and workload efficiency.
Resumo:
The objective of this work project is to analyse and discuss the importance of the “Cost to Serve” as a differentiation key factor, by accessing cost to serve customers of a Portuguese subsidiary of a multinational company, which is operating in the sector of fast moving consumer goods (FMCG) – Unilever – Jerónimo Martins (UJM). I will also suggest and quantify key proposals to decrease costs and increase customers’ value. Hence, the scope of this work project is focused on logistics and distribution processes of the company supply chain.
Resumo:
Field Lab in Entrepreneurial Innovative Ventures
Resumo:
This work project regards a challenge presented by a Portuguese organization on the retail sector, SONAEMC, which is a case study of how and why fruit shrinkage occurs in the fruit supply chain within their convenience stores. A qualitative research methodology enabled to infer in which stages throughout the chain shrinkage’s causes occur and, to conclude that internal rules for procedures and processes are not always followed and whose compliance would be enough to reduce fruit shrinkage. The key conclusion is that if fruit stock loss is reduced by as much as 15% the category’s profitability could increase about 8%.
Resumo:
The following work is a case study of overstock and stock-out problems at Volkswagen Autoeuropa (VWAE). It introduces the supply chain of Autoeuropa and specializes then on failures connected to inventory problems. Having a successful supply chain is important in a world where products become more and more similar as it can give to companies an edge over their competitors. The case shows three practices that VWAE uses to prevent and to overcome stock problems. Information was gathered by doing interviews with different managers, by analyzing the company’s key processes and by literature research related to the topics of supply chain management and flexibility in the supply chain. Three practices were further investigated: the use of alternative parts, support of the supplier and a rating system of suppliers. In the question section of this work the importance of flexibility and Supplier Relationship Management (SRM) when connected to supply chain management are explained. The described different practices are numerically analyzed and it is concluded that each practice brings both cost savings and the possibility of achieving target numbers to the company, showing the company’s flexibility to react to supply chain disturbances. Because of confidentiality reasons, persons in the case are fictionalized and numbers are wherever possible equalized to 100 in order to display true proportions.