7 resultados para Semi-continuous process
em Instituto Politécnico do Porto, Portugal
Resumo:
Pultruded products are being targeted by a growing demand due to its excellent mechanical properties and low chemical reactivity, ensuring a low level of maintenance operations and allowing an easier assembly operation process than equivalent steel bars. In order to improve the mechanical drawing process and solve some acoustic and thermal insulation problems, pultruded pipes of glass fibre reinforced plastics (GFRF) can be filled with special products that increase their performance regarding the issues previously referred. The great challenge of this work was drawing a new equipment able to produce pultruded pipes filled with cork or polymeric pre-shaped bars as a continuous process. The project was carried out successfully and the new equipment was built and integrated in the pultrusion equipment already existing, allowing to obtain news products with higher added-value in the market, covering some needs previously identified in the field of civil construction.
Resumo:
A realização deste trabalho teve como principal objectivo proceder ao projecto e realização de dois sistemas de produção de perfis pultrudidos híbridos a acoplar aos equipamentos de pultrusão já instalados na ALTO – PERFIS PULTRUDIDOS, Lda. A realização de perfis pultrudidos híbridos visa melhorar as características de isolamento térmico e acústico dos tubos habitualmente feitos por pultrusão, incrementando simultaneamente a sua resistência, através da melhoria do momento de inércia do perfil, sem que haja um aumento significativo do peso do conjunto. O projecto teve como base de trabalho dois sistemas de produção completamente distintos: (a) a existência de barras de cortiça e de poliuretano (pré-formas) sobre as quais se vai efectuar a pultrusão de um tubo que abraça as barras e (b) o uso de resíduos de pultrusão como forma de enchimento dos tubos, durante o seu processo produtivo. Estes equipamentos foram projectados e parcialmente fabricados, antevendo-se que os mesmos entrem em funcionamento muito brevemente.
Resumo:
Trabalho de Projeto
Resumo:
O presente relatório reflete a (co)construção e desenvolvimento do projeto de educação e intervenção social “Participação, um Caminho para a Mudança”, que teve como palco a Caledial, uma clínica de hemodiálise em Canelas – Vila Nova de Gaia. Posicionado na metodologia da Investigação-Ação Participativa, este projeto permitiu a criação de espaços coletivos de partilha de experiências e vivências de pessoas com doença crónica, reconhecendo dificuldades e limitações, mas também as potencialidades e recursos existentes. Assim, pelo caminho da participação e da ação, procurou-se dar resposta a algumas das necessidades sentidas, promovendo um cada vez maior envolvimento das pessoas na procura do conhecimento sobre esta doença, no sentido da sua capacitação e empowerment. Teve como ponto de partida o primeiro convívio de Natal das pessoas em hemodiálise, familiares e profissionais da Caledial, e vários grupos de discussão sobre as vivências, perceções e sentimentos face à doença renal crónica. No âmbito deste projeto, resultado do trabalho coletivo de vários participantes, pretendeu-se compreender a realidade enquanto se agia sobre a mesma, num processo contínuo de reflexão-ação-reflexão, que foi capaz de mobilizar esforços individuais e coletivos no sentido da mudança. Surgiu como um desafio e afirmou-se como um dispositivo transformador das relações entre os profissionais de saúde, as pessoas em hemodiálise e as famílias, transformando a clínica num espaço mais aberto e inclusivo, promotor da participação e fértil para o desenvolver de atividades repletas de significado para as pessoas envolvidas.
Resumo:
Manufacturing processes need permanently to innovate and optimize because any can be susceptible to continuous improvement. Innovation and commitment to the development of these new solutions resulting from existing expertise and the continuing need to increase productivity, flexibility and ensuring the necessary quality of the manufactured products. To increase flexibility, it is necessary to significantly reduce set-up times and lead time in order to ensure the delivery of products ever faster. This objective can be achieved through a normalization of the pultrusion line elements. Implicitly, there is an increase of productivity by this way. This work is intended to optimize the pultrusion process of structural profiles. We consider all elements of the system from the storehouse of the fibers (rack) to the pultrusion die. Particular attention was devoted to (a) the guidance system of the fibers and webs, (b) the resin container where the fibers are impregnated, (c) standard plates positioning of the fibers towards the entrance to the spinneret and also (d) reviewed the whole process of assembling and fixing the die as well as its the heating system. With the implementation of these new systems was achieved a significant saving of time set-up and were clearly reduced the unit costs of production. Quality assurance was also increased.
Resumo:
Hoje em dia, com os avanços constantes na indústria, novas áreas começam cada vez mais a ser foco de atenção por parte das organizações. Motivados pela procura de melhores condições para os seus colaboradores e por todos os benefícios que este tipo de intervenção oferece, tanto a curto, como principalmente a médio e longo prazo, a Grohe Portugal, mais especificamente o seu departamento de montagem, achou relevante potenciar a aplicação da Ergonomia nos seus postos de trabalho. Posto isto, esta dissertação pretende apresentar o trabalho desenvolvido junto da organização que teve como objetivo projetar e executar uma linha de montagem que tivesse em consideração os seguintes aspetos: • Ergonomia; • Automatização ou semi-automatização de operações; • Simplificação de aspetos operacionais; • Sistemas de abastecimento mais robustos e de fácil uso; • Simplificação de setups; • Definição de dimensões normalizadas para futuros projetos. As soluções encontradas tiveram como objetivo primordial satisfazer o maior número possível de colaboradores, sendo que para tal foram utilizados dados referentes a antropometria da população Portuguesa. Para a realização e conclusão deste projeto, o trabalho foi decomposto em varias etapas, de entre as quais se destacam: • Analise e estudo dos métodos de montagem; • Levantamento de todos os componentes e operações que constituem o processo de fabrico das diversas famílias onde foram implementados novos projetos; • Definição e uniformização da estrutura das novas linhas de montagem; • Estudo e definição da disposição dos componentes na nova linha, bem como da sua forma de abastecimento; • Projeto da linha de montagem em 3D com recurso ao software SolidWorks (DassaultSystemes, 2014); • Montagem final da linha, bem como o acompanhamento da sua fase de arranque. Durante o estagio foi ainda pensado e implementado um projeto paralelo com vista a constante manutenção e melhoria do departamento de montagem cujo objetivo, através de “plant walks”, e detetar de entre outras, situações de falta de identificação de componentes ou equipamentos, degradação de ferramentas, fugas ou derrames nas linhas, etc. O balanco final do trabalho foi bastante positivo, tendo-se alcançado melhorias em alguns índices de qualidade, tempos de abastecimento e condições ergonómicas dos postos de trabalho que sofreram intervenção, tendo essas melhorias resultado numa avaliação positiva por parte dos colaboradores que integram essas mesmas linhas.
Resumo:
Dissertação de Mestrado apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Contabilidade e Finanças, sob orientação da Professora Doutora Alcina Augusta de Sena Portugal Dias