50 resultados para Logistics, Naval.
em Instituto Politécnico do Porto, Portugal
Resumo:
This project aims to study the implementation of Lean principles and tools in several levels of logistics, from internal logistics to interface with distribution center and suppliers, in an industrial plant. The main focus of all efforts is to create the conditions to approach the continuous flow scenario in the manufacturing processes. The subject of improvement actions is a company whose core activity is car seat production, more specifically the car seat cover production and assembly. This focuses the assembly process, which requires the usage of a considerable variety of components and therefore is an important obstacle to the implementation of continuous flow. The most salient issues are related with inefficient interaction between sections and late supply of components in assembly lines, forcing the operator to abandon his work station and leading to production interruption. As an operational methodology, actions from Lean philosophy and optimization were implemented according to project management principles.
Resumo:
Dissertação apresentada ao Instituto Superior de Contabilidade para a obtenção do Grau de Mestre em Empreendedorismo e Internacionalização Orientada por Professor Doutor José de Freitas Santos
Resumo:
Dissertação apresentada ao Instituto Superior de Contabilidade para a obtenção do Grau de Mestre em Empreendedorismo e Internacionalização Orientada por Professor Doutor José Freitas Santos
Resumo:
This chapter presents some of the issues with holonic manufacturing systems. It starts by presenting the current manufacturing scenario and trends and then provides some background information on the holonic concept and its application to manufacturing. The current limitations and future trends of manufacturing suggest more autonomous and distributed organisations for manufacturing systems; holonic manufacturing systems are proposed as a way to achieve such autonomy and decentralisation. After a brief literature survey a specific research work is presented to handle scheduling in holonic manufacturing systems. This work is based on task and resource holons that cooperate with each other based on a variant of the contract net protocol that allow the propagation of constraints between operations in the execution plan. The chapter ends by presenting some challenges and future opportunities of research.
Resumo:
Projecto apresentado ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por Prof. Doutor Gouveia
Resumo:
Dissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Professor Doutor José António Baptista da Costa Coorientada por: Dr. Lourenço Fernando Gomes Pinheiro
Resumo:
A indústria automóvel é um dos setores mais exigentes do mercado global, por este motivo empresas como a Continental Mabor S.A, líderes de mercado, necessitam estar na linha da frente no que toca a programas de melhoria contínua e de uma gestão orientada para um crescimento rentável e sustentado. Nesta perspetiva, este estudo de dissertação tem como objetivo encontrar uma solução para a gestão de stock e FiFo (First in First out) de pneus em verde na supracitada empresa, situada em Lousado, Vila Nova de Famalicão. Este projeto de dissertação iniciou-se com uma análise e diagnóstico do processo produtivo do pneu, entre a Construção e a Vulcanização. Nesta análise, foi possível identificar vários problemas, sendo o mais crítico associado à logística interna de transporte do pneu “em curso”, de fabrico entre as fases do mesmo, Construção e Vulcanização. Devido a condicionantes estruturais e de organização, a logística interna de transporte entre estes dois sectores enfrenta estrangulamentos nos fluxos, a falta de espaço para acomodar o material em curso, problemas organizacionais de controlo e monitorização do processo produtivo, dificuldades de regulação do fluxo e localização dos carros de transporte dos pneus em verde. Face aos problemas detetados ao longo do estudo, foram analisadas várias soluções para a resolução ou minimização dos mesmos. Entre as soluções propostas salientam-se: o alargamento do sistema de transporte por tapetes rolantes GTC (Green Tire Conveying) a todos os módulos de construção. Esta solução diminui o fluxo de carros para a área da construção, descongestionando a zona próxima do sistema de carregamento automático GTAL (Green Tire Automatic Loading) na vulcanização. A implementação dum sistema Wi-Fi RFID, que permite identificar e localizar artigos em curso utilizando etiquetas inteligentes numa rede wireless, conseguindo melhorar a programação de produção e o respetivo sequenciamento. Sabendo também que a Continental se encontra numa fase de expansão, designada Projeto Route 17/20, as soluções propostas tomaram em consideração essa nova realidade futura. Assim, foram estudados e propostos novos layouts para esse atual processo. Nestes novos layouts, procurou-se uma reorganização dos processos de fabrico, bem como um redimensionamento dos espaços de parqueamento de carros de pneus verdes adequado aos volumes produtivos. De igual forma, adequou-se os espaços físicos à possível implementação de um sistema de FiFo de pneus em verde na planta fabril, quando concluída a expansão. Este trabalho de dissertação apresenta como vantagens diretas da sua implementação: gerar a menor perturbação no atual método de trabalho seguido na empresa; previsivelmente aumentar a eficiência do processo produtivo; potenciar o crescimento tecnológico programado pela empresa; e oferecer uma boa relação custo/benefício no investimento necessário. Como apreciação final, pode-se concluir que este estudo foi finalizado com sucesso, visto que as soluções propostas foram apreciadas positivamente pela Administração da Continental Mabor S.A. e estão correntemente a ser avaliadas pelo grupo.
Resumo:
As unidades de cuidados intensivos (UCI), são das áreas hospitalares que mais dinheiro consomem nas instituições públicas. As funções dos profissionais de saúde são imprescindíveis, mas também a logística e gestão são de vital importância e como tal, têm de ser avaliadas. Por isso, todos os indicadores – clínicos, económico-financeiros, recursos humanos, produtividade, qualidade - são importantes para que a gestão possa, dinâmica e oportunamente, ter informação útil para a tomada de decisões. Assim, a garantia de uma gestão eficiente dos recursos é cada vez mais importante de forma a satisfazer não só os pacientes como toda a estrutura hospitalar. Nos tempos que correm, e com a situação socioeconómica de crise que se vive, é de extrema importância saber com o maior nível de detalhe possível, com que recursos se pode contar. É importante quantificar de forma eficaz e eficiente como são utilizados os recursos, para satisfazer com o maior nível de qualidade possível um paciente que entre numa UCI. Para tal, a utilização de sistemas de informação (SI) e das ferramentas indicadas na gestão de uma unidade hospitalar, são de grande importância. Nesta tese, é proposta uma ferramenta, que seja simples e de fácil utilização, desenvolvida com recurso a tecnologia ROLAP para a extracção e análise de indicadores numa UCI, e que possa ser facilmente integrada num software de gestão do dia-a-dia.
Resumo:
Chromated copper arsenate (CCA) was widespread used as a chemical wood preservative with application in the construction of playground equipment, fences, jetties, and naval. Environmental protection agency (EPA) had limited the use of CCA-treated wood on 2002, due to probable implications on both human and environmental health. Although this fact, several industries pursue the use of this product within their manufactories. In addition, the durability of this wood for 60 years, makes these treated products an hazard to the public health. In the present work, studies were explored exposing mice to CCA, during 14, 24, 48, and 96 h for the assessment of acute toxicity of CCA. Kidney and liver were removed, prepared for histology and for metalloid, and copper content evaluation by high resolution inductively coupled plasma mass spectroscopy. The histological results evidenced apparently normal structures for control animals and group exposed to As2O5. On the contrary, the renal sections of the animals treated with CCA revealed epithelium cells desquamation, hyaline, and granular casts in renal tubules lumen. Furthermore, high levels of arsenic were detected in the kidney of animals treated with CCA over 14 and 48 h, being significantly greater than controls. Although this approach underlines the potential hazard of CCA on some vital organs, further testing may be required to establish the impacts on other functions.
Resumo:
No âmbito da unidade curricular Dissertação/Projeto/Estágio do 2ºano do Mestrado em Engenharia mecânica – Ramo Gestão Industrial do Instituto Superior de Engenharia do Porto, o presente trabalho de dissertação foi enquadrado num projeto industrial de melhoria com Instituto Kaizen, empresa de consultoria operacional. O projeto foi desenvolvido numa empresa de produção de componentes em ferro nodular destinados à indústria automóvel do mercado europeu, a Sakthi Portugal,SA. A realização deste projeto teve como objetivo a implementação do sistema de planeamento em Pull (produção puxada) na logística interna da Sakthi Portugal,SA recorrendo à metodologia Kaizen. Esta metodologia consiste na aplicação de ferramentas de TFM - Total Flow Management, integradas no Kaizen Management System. Neste projeto recorreu-se especialmente a um dos pilares que o constituem, o pilar do “Fluxo da Logística Interna”. Neste pilar encontram-se as várias metodologias utilizadas na otimização do fluxo de material e informação na logística interna. Estas metodologias foram aplicadas, com o objetivo do sistema produtivo operar de acordo com a necessidade do cliente, obtendo deste modo a minimização dos custo e o aumento da produtividade e qualidade. Em resultado da aplicação da metodologia seguida, foi possível atingir-se os objetivos definidos inicialmente e em alguns casos foi possível superar esses objetivos. Em função da abordagem integrada que foi seguida, conseguiu-se uma diminuição do “lead time” do processo de fabrico, redução dos produtos em curso de fabrico, libertação de espaço e redução de inventários. Estas melhorias resultaram numa movimentação interna na fábrica mais facilitada e num aumento global da produtividade. Como consequência positiva dos efeitos deste trabalho, pode-se apontar o facto de que a Sakthi Portugal SA aumentou a sua competitividade por tornar-se numa empresa mais dinâmica, mais adaptada ao mercado e com níveis de satisfação do cliente muito superiores.
Resumo:
Structural health monitoring has long been identified as a prominent application of Wireless Sensor Networks (WSNs), as traditional wired-based solutions present some inherent limitations such as installation/maintenance cost, scalability and visual impact. Nevertheless, there is a lack of ready-to-use and off-the-shelf WSN technologies that are able to fulfill some most demanding requirements of these applications, which can span from critical physical infrastructures (e.g. bridges, tunnels, mines, energy grid) to historical buildings or even industrial machinery and vehicles. Low-power and low-cost yet extremely sensitive and accurate accelerometer and signal acquisition hardware and stringent time synchronization of all sensors data are just examples of the requirements imposed by most of these applications. This paper presents a prototype system for health monitoring of civil engineering structures that has been jointly conceived by a team of civil, and electrical and computer engineers. It merges the benefits of standard and off-the-shelf (COTS) hardware and communication technologies with a minimum set of custom-designed signal acquisition hardware that is mandatory to fulfill all application requirements.
Resumo:
The use of fibre reinforced plastics – FRP’s – in structures is under a considerable increase. Advantages of their use are related with their low weight, high strength and stiffness. The improvement of the dynamic characteristics has been profitable for aeronautics, automobile, railway, naval and sporting goods industries. Drilling is a widely used machining technique as it is needed to assemble parts in a structure. This is a unique machining process, characterized by the existence of two different mechanisms: extrusion by the drill chisel edge and cutting by the rotating cutting lips. Drilling raises particular problems that can reduce mechanical and fatigue strength of the parts. In this work, quasi-isotropic hybrid laminates with 25% of carbon fibre reinforced plies and 4 mm thickness are produced, tested and drilled. Three different drill geometries are compared. Results considered are the interlaminar fracture toughness in Mode I – GIc –, thrust force during drilling and delamination extent after drilling. A bearing test is performed to evaluate tool influence on the load carrying capacity of the plate. Results consider the influence of drill geometry on delamination. A correlation linking plate damage to bearing test results is presented.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores.Área de Especialização de Sistemas Autónomos
Resumo:
Dissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Professora Doutora Patrícia Alexandra Gregório Ramos
Resumo:
Mestrado em Engenharia Química - Ramo Optimização Energética na Indústria Química