48 resultados para interdependence within project and construction
Resumo:
In the present paper we will consider strategies of innovation, risk and proactivity as entre/ intrapreneurship strategies. This study was done in a Portuguese and in a Polish region. In Portugal the region was Vale do Sousa, located in the northern Portugal. The Polish region was Lublin Voivodeship and it is situated in the south-eastern part of the country. The study focused on Industrial and Construction sectors. In order to get a valid sample, a group of 251 firms were analysed in Portugal, and 215 in Poland. However, the minimum sample size in Poland should be 323. Since this is a work in progress, we are aiming for this number of questionnaires. Each strategy was analysed individually for both regions and the results pointed to a lack of culture of entrepreneurship in firms’ management. Only Proactivity presented a positive result in firms’ management. Polish firms tend to be more innovative and more risk takers, while in proactivity Portuguese ones present a slightly higher result. Combining the strategy results, it was possible to identify that 61.2% of Portuguese firms present a low level of entrepreneurship, while 60% of Polish firms present a moderate level. Considering intrapreneurship good levels, while Portugal account for 5.2% this figure is 19.1% in Poland.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
One of the most difficult issues of e-Learning is the students’ assessment. Being this an outstanding task regarding theoretical topics, it becomes even more challenging when the topics under evaluation are practical. ISCAP’s Information Systems Department is composed of about twenty teachers who have been for several years using an e-learning environment (at the moment Moodle 2.3) combined with traditional assessment. They are now planning and implementing a new e-learning assessment strategy. This effort was undertaken in order to evaluate a practical topic (the use of spreadsheets to solve management problems) common to shared courses of several undergraduate degree programs. The same team group is already experienced in the assessment of theoretical information systems topics using the b-learning platform. Therefore, this project works as an extension to previous experiences being the team aware of the additional difficulties due to the practical nature of the topics. This paper describes this project and presents two cycles of the action research methodology, used to conduct the research. The first cycle goal was to produce a database of questions. When it was implemented in order to be used with a pilot group of students, several problems were identified. Subsequently, the second cycle consisted in solving the identified problems preparing the database and all the players to a broader scope implementation. For each cycle, all the phases, its drawbacks and achievements are described. This paper suits all those who are or are planning to be in the process of shifting their assessment strategy from a traditional to one supported by an e-learning platform.
Resumo:
As obras subterrâneas têm actualmente maior relevância, sobretudo em meios urbanos e são, desde a fase de estudo até à sua execução, projectos tecnicamente complexos, exigentes e interessantes. O meio em que a obra subterrânea está inserida condiciona, quer na fase de estudo quer no desenvolvimento dos trabalhos, as opções técnicas e representa um desafio constante para todos os intervenientes. São poucos os técnicos que têm a oportunidade de acompanhar e apreender o conhecimento envolvido nestas obras, pelo que é importante que toda a experiência adquirida seja registada e se possível transmitida. Pela sua formação e vocação, os engenheiros geotécnicos desempenham um papel de destaque nestes empreendimentos, onde o conhecimento e a sensibilidade técnica, associados à experiência em trabalhos semelhantes, são factores determinantes para atingir os objectivos propostos. Com este trabalho pretende-se caracterizar, valorizar, analisar e concluir sobre as várias etapas desenvolvidas na construção do túnel de Seixo Alvo, enquadrado na Concessão do Douro Litoral. Realizou-se uma apreciação do estado da arte e apresenta-se o túnel do Seixo Alvo como caso de estudo, onde se evidencia a importância do estudo e observação da obra e do meio em que está inserida, caracteriza os métodos e processos construtivos implementados e propostos, analisa os incidentes ocorridos e valoriza os trabalhos executados. Por último conclui-se sobre as técnicas, os custos e os rendimentos obtidos.
Resumo:
A indústria da construção, nomeadamente no sector da edificação, baseia-se essencialmente em métodos de construção tradicional. Esta indústria é caracterizada pelo consumo excessivo de matérias-primas, de recursos energéticos não renováveis e pela elevada produção de resíduos. Esta realidade é de todo incompatível com os desígnios do desenvolvimento sustentável, nos quais se procura a conveniência harmoniosa entre as dimensões ambiental, social e económica. O desafio da sustentabilidade, colocado à actividade da construção, tem motivado abordagens distintas, não só por parte das várias especialidades da engenharia, como também da arquitectura. É nesta perspectiva, que o presente modelo pretende ser um contributo para uma abordagem inovadora, introduzindo linhas de intervenção e de orientação, para apoiar e estimular o desenvolvimento de soluções sustentáveis em edifícios habitacionais, em qualquer fase do ciclo de evolução de um projecto e das várias especialidades do mesmo. Assim, no sentido de optimizar os recursos envolvidos no projecto são expostas estratégias de intervenção, com os seguintes objectivos: optimização do potencial do local, preservação da identidade regional e cultural, minimização do consumo de energia, utilização de materiais e produtos de baixo impacto ambiental, redução do consumo de água, redução da produção de emissões, resíduos e outros poluentes, adequada qualidade do ambiente interior e optimização das fases de operação e manutenção. A ferramenta apresentada surge como um instrumento facilitador para a equipa de projectistas, e que se esta adaptada para o desenvolvimento de projectos de edifícios de habitação, dada a génese dos métodos utilizados. As soluções de sustentabilidade apresentadas neste manual emanam dos sistemas de certificação LíderA, LEED, BREEAM e SBToolpt. O modelo encontra-se estruturado, no que às fases de projecto diz respeito, de acordo com os requisitos expressos na Portaria 701-H/2008 de 29 de Julho, tendo sido igualmente seguido o descrito para os respectivos intervenientes.
Resumo:
The application of information technologies (specially the Internet, Web 2.0 and social tools) make informal learning more visible. This kind of learning is not linked to an institution or a period of time, but it is important enough to be taken into account. On the one hand, learners should be able to communicate to the institutions they are related to, what skills they possess, whether they were achieved in a formal or informal way. On the other hand the companies and educational institutions need to have a deeper knowledge about the competencies of their staff. The TRAILER project provides a methodology supported by a technological framework to facilitate communication about informal learning between businesses, employees and learners. The paper presents the project and some of the work carried out, an exploratory analysis about how informal learning is considered and the technological framework proposed. Whilst challenges remain in terms of establishing the meaningfulness of technological engagement for employees and businesses, the continuing transformation of the social, technological and educational environment is likely to lead to greater emphasis for the effective exploitation of informal learning.
Resumo:
We study the effects of product differentiation in a Stackelberg model with demand uncertainty for the first mover. We do an ex-ante and ex-post analysis of the profits of the leader and of the follower firms in terms of product differentiation and of the demand uncertainty. We show that even with small uncertainty about the demand, the follower firm can achieve greater profits than the leader, if their products are sufficiently differentiated. We also compute the probability of the second firm having higher profit than the leading firm, subsequently showing the advantages and disadvantages of being either the leader or the follower firm.
Resumo:
Na sociedade actual é imperativo assegurar um emprego competente para que o Ser Humano possa atingir a sua subsistência, e consequentemente a sua própria felicidade. No entanto, devido à pressão da sociedade em que vivemos, promover a sustentabilidade do “emprego” hoje em dia, principalmente nas camadas mais jovens, traduz-se em algo extremamente difícil. Estes deparam-se com uma situação árdua quando escolhem um caminho para o seu futuro. Assim como eu, também os jovens da actualidade prevêem que no futuro essas dúvidas se irão manter, ainda de forma mais agravada devido à complexidade das profissões existentes no mundo do trabalho. O meu objectivo neste momento é facilitar a vida dos jovens que se vêem numa encruzilhada, com pouco tempo de resposta para a tomada de decisão do seu próprio futuro. Pretendo fomentar a descoberta e construção da sua própria vocação, dando uso aos novos avanços tecnológicos, juntamente com técnicas já utilizadas na área da Psicologia. Recorrendo a biossensores cognitivos, através do EPOC da Emotiv, que realiza a leitura de sinais neuronais e de uma aplicação informática criada para o efeito. Apesar de não resolver na totalidade, desejo reduzir substancialmente a dúvida dos Jovens na escolha da sua profissão futura.
Resumo:
Mestrado em Educação Pré-Escolar
Resumo:
The interest in the development of climbing robots has grown rapidly in the last years. Climbing robots are useful devices that can be adopted in a variety of applications, such as maintenance and inspection in the process and construction industries. These systems are mainly adopted in places where direct access by a human operator is very expensive, because of the need for scaffolding, or very dangerous, due to the presence of an hostile environment. The main motivations are to increase the operation efficiency, by eliminating the costly assembly of scaffolding, or to protect human health and safety in hazardous tasks. Several climbing robots have already been developed, and other are under development, for applications ranging from cleaning to inspection of difficult to reach constructions. A wall climbing robot should not only be light, but also have large payload, so that it may reduce excessive adhesion forces and carry instrumentations during navigation. These machines should be capable of travelling over different types of surfaces, with different inclinations, such as floors, walls, or ceilings, and to walk between such surfaces (Elliot et al. (2006); Sattar et al. (2002)). Furthermore, they should be able of adapting and reconfiguring for various environment conditions and to be self-contained. Up to now, considerable research was devoted to these machines and various types of experimental models were already proposed (according to Chen et al. (2006), over 200 prototypes aimed at such applications had been developed in the world by the year 2006). However, we have to notice that the application of climbing robots is still limited. Apart from a couple successful industrialized products, most are only prototypes and few of them can be found in common use due to unsatisfactory performance in on-site tests (regarding aspects such as their speed, cost and reliability). Chen et al. (2006) present the main design problems affecting the system performance of climbing robots and also suggest solutions to these problems. The major two issues in the design of wall climbing robots are their locomotion and adhesion methods. With respect to the locomotion type, four types are often considered: the crawler, the wheeled, the legged and the propulsion robots. Although the crawler type is able to move relatively faster, it is not adequate to be applied in rough environments. On the other hand, the legged type easily copes with obstacles found in the environment, whereas generally its speed is lower and requires complex control systems. Regarding the adhesion to the surface, the robots should be able to produce a secure gripping force using a light-weight mechanism. The adhesion method is generally classified into four groups: suction force, magnetic, gripping to the surface and thrust force type. Nevertheless, recently new methods for assuring the adhesion, based in biological findings, were proposed. The vacuum type principle is light and easy to control though it presents the problem of supplying compressed air. An alternative, with costs in terms of weight, is the adoption of a vacuum pump. The magnetic type principle implies heavy actuators and is used only for ferromagnetic surfaces. The thrust force type robots make use of the forces developed by thrusters to adhere to the surfaces, but are used in very restricted and specific applications. Bearing these facts in mind, this chapter presents a survey of different applications and technologies adopted for the implementation of climbing robots locomotion and adhesion to surfaces, focusing on the new technologies that are recently being developed to fulfill these objectives. The chapter is organized as follows. Section two presents several applications of climbing robots. Sections three and four present the main locomotion principles, and the main "conventional" technologies for adhering to surfaces, respectively. Section five describes recent biological inspired technologies for robot adhesion to surfaces. Section six introduces several new architectures for climbing robots. Finally, section seven outlines the main conclusions.
Resumo:
O planeamento da construção tem sido considerado como uma mera burocracia e utilizado essencialmente como uma orientação temporal do desenvolvimento da obra, que se reflete, frequentes vezes, na utilização inadequada das técnicas de planeamento. Com esta dissertação pretende-se oferecer uma nova perspectiva sobre as técnicas e softwares de planeamento e a sua melhor utilização. Contudo, focalizando-se mais nos métodos CPM e LOB, efetua-se o seu planeamento nos softwares Microsoft Project e CCS- Candy respetivamente. Inicia-se este trabalho com uma breve descrição acerca do estado da arte das metodologias e softwares de planeamento da construção. Seguidamente efetua-se a demonstração do planeamento de dois casos de estudo, sendo o primeiro caso de estudo referente ao planeamento da construção de uma ponte com recurso ao Microsoft Project. Realiza-se o cálculo dos rendimentos, dimensionamentos das equipas de trabalho e análise dos diagramas de planeamento fornecido pelo Microsoft Project. No segundo caso de estudo, demonstra-se o planeamento da estrutura de dois edifícios no software CCS - Candy. Efetua-se igualmente o cálculo dos rendimentos, dimensionamento das equipas de trabalho e análise, essencialmente, do Gráfico Espaço/Tempo (LOB). Após a realização do planeamento dos dois casos de estudo, realiza-se uma pequena comparação das duas metodologias, CPM e LOB, referenciando as vantagens e desvantagens da sua utilização no planeamento de obras, seguido de uma breve conclusão. Termina-se esta dissertação com a apresentação das conclusões gerais e das propostas para trabalhos futuros.
Resumo:
O trabalho apresentado centra-se na determinação dos custos de construção de condutas de pequenos e médios diâmetros em Polietileno de Alta Densidade (PEAD) para saneamento básico, tendo como base a metodologia descrita no livro Custos de Construção e Exploração – Volume 9 da série Gestão de Sistemas de Saneamento Básico, de Lencastre et al. (1994). Esta metodologia descrita no livro já referenciado, nos procedimentos de gestão de obra, e para tal foram estimados custos unitários de diversos conjuntos de trabalhos. Conforme Lencastre et al (1994), “esses conjuntos são referentes a movimentos de terras, tubagens, acessórios e respetivos órgãos de manobra, pavimentações e estaleiro, estando englobado na parte do estaleiro trabalhos acessórios correspondentes à obra.” Os custos foram obtidos analisando vários orçamentos de obras de saneamento, resultantes de concursos públicos de empreitadas recentemente realizados. Com vista a tornar a utilização desta metodologia numa ferramenta eficaz, foram organizadas folhas de cálculo que possibilitam obter estimativas realistas dos custos de execução de determinada obra em fases anteriores ao desenvolvimento do projeto, designadamente numa fase de preparação do plano diretor de um sistema ou numa fase de elaboração de estudos de viabilidade económico-financeiros, isto é, mesmo antes de existir qualquer pré-dimensionamento dos elementos do sistema. Outra técnica implementada para avaliar os dados de entrada foi a “Análise Robusta de Dados”, Pestana (1992). Esta metodologia permitiu analisar os dados mais detalhadamente antes de se formularem hipóteses para desenvolverem a análise de risco. A ideia principal é o exame bastante flexível dos dados, frequentemente antes mesmo de os comparar a um modelo probabilístico. Assim, e para um largo conjunto de dados, esta técnica possibilitou analisar a disparidade dos valores encontrados para os diversos trabalhos referenciados anteriormente. Com os dados recolhidos, e após o seu tratamento, passou-se à aplicação de uma metodologia de Análise de Risco, através da Simulação de Monte Carlo. Esta análise de risco é feita com recurso a uma ferramenta informática da Palisade, o @Risk, disponível no Departamento de Engenharia Civil. Esta técnica de análise quantitativa de risco permite traduzir a incerteza dos dados de entrada, representada através de distribuições probabilísticas que o software disponibiliza. Assim, para por em prática esta metodologia, recorreu-se às folhas de cálculo que foram realizadas seguindo a abordagem proposta em Lencastre et al (1994). A elaboração e a análise dessas estimativas poderão conduzir à tomada de decisões sobre a viabilidade da ou das obras a realizar, nomeadamente no que diz respeito aos aspetos económicos, permitindo uma análise de decisão fundamentada quanto à realização dos investimentos.
Resumo:
Mestre em Engenharia Civil - Especialização em Estruturas
Resumo:
Mestre em Engenharia Civil – Ramo de Gestão das Construções
Resumo:
O presente trabalho tem como objetivo o cálculo e desenvolvimento de um projecto estrutural de um edifício público. O edifício em questão será construído em Camama, Angola. Ao longo deste trabalho são apresentadas as diferentes etapas necessárias para a conceção do projeto estrutural de um edifício em betão armado. As opções consideradas na realização deste projeto e as respetivas justificações, podem ser encontradas ao longo deste documento. Estas são reforçadas através da apresentação de plantas estruturais com os seus elementos e os cálculos considerados necessários. Este trabalho foi elaborado com o apoio do programa de cálculo ROBOT Structural Analysis para a caracterização e análise das ações atuantes. Apesar da localização do edifício ser em Angola, as ações e as bases de projeto são definidas de acordo com as normas portuguesas. A utilização destas normas foi possível através de referências comuns a ambos os países, bem como algumas considerações tendo em conta as condições de construção em Luanda. Para a definição do projeto estrutural foram fornecidas as plantas de arquitetura, cortes e alçados do edifício. Estas plantas apresentam os respetivos materiais não estruturais, a utilizar após a sua construção. Em adição foi fornecida uma sondagem geotécnica do terreno de construção.