115 resultados para fuzzy rule relabeling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A well-cited paper suggesting fuzzy coding as an alternative to the conventional binary, grey and floating-point representations used in genetic algorithms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with Takagi-Sugeno (TS) fuzzy model identification of nonlinear systems using fuzzy clustering. In particular, an extended fuzzy Gustafson-Kessel (EGK) clustering algorithm, using robust competitive agglomeration (RCA), is developed for automatically constructing a TS fuzzy model from system input-output data. The EGK algorithm can automatically determine the 'optimal' number of clusters from the training data set. It is shown that the EGK approach is relatively insensitive to initialization and is less susceptible to local minima, a benefit derived from its agglomerate property. This issue is often overlooked in the current literature on nonlinear identification using conventional fuzzy clustering. Furthermore, the robust statistical concepts underlying the EGK algorithm help to alleviate the difficulty of cluster identification in the construction of a TS fuzzy model from noisy training data. A new hybrid identification strategy is then formulated, which combines the EGK algorithm with a locally weighted, least-squares method for the estimation of local sub-model parameters. The efficacy of this new approach is demonstrated through function approximation examples and also by application to the identification of an automatic voltage regulation (AVR) loop for a simulated 3 kVA laboratory micro-machine system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to develop a decision making system to evaluate the risks in E-Commerce (EC) projects. Competitive software businesses have the critical task of assessing the risk in the software system development life cycle. This can be conducted on the basis of conventional probabilities, but limited appropriate information is available and so a complete set of probabilities is not available. In such problems, where the analysis is highly subjective and related to vague, incomplete, uncertain or inexact information, the Dempster-Shafer (DS) theory of evidence offers a potential advantage. We use a direct way of reasoning in a single step (i.e., extended DS theory) to develop a decision making system to evaluate the risk in EC projects. This consists of five stages 1) establishing knowledge base and setting rule strengths, 2) collecting evidence and data, 3) determining evidence and rule strength to a mass distribution for each rule; i.e., the first half of a single step reasoning process, 4) combining prior mass and different rules; i.e., the second half of the single step reasoning process, 5) finally, evaluating the belief interval for the best support decision of EC project. We test the system by using potential risk factors associated with EC development and the results indicate that the system is promising way of assisting an EC project manager in identifying potential risk factors and the corresponding project risks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we present an investigation into using fuzzy methodologies to guide the construction of high quality feasible examination timetabling solutions. The provision of automated solutions to the examination timetabling problem is achieved through a combination of construction and improvement. The enhancement of solutions through the use of techniques such as metaheuristics is, in some cases, dependent on the quality of the solution obtained during the construction process. With a few notable exceptions, recent research has concentrated on the improvement of solutions as opposed to focusing on investigating the ‘best’ approaches to the construction phase. Addressing this issue, our approach is based on combining multiple criteria in deciding on how the construction phase should proceed. Fuzzy methods were used to combine three single construction heuristics into three different pair wise combinations of heuristics in order to guide the order in which exams were selected to be inserted into the timetable solution. In order to investigate the approach, we compared the performance of the various heuristic approaches with respect to a number of important criteria (overall cost penalty, number of skipped exams, number of iterations of a rescheduling procedure required and computational time) on twelve well-known benchmark problems. We demonstrate that the fuzzy combination of heuristics allows high quality solutions to be constructed. On one of the twelve problems we obtained lower penalty than any previously published constructive method and for all twelve we obtained lower penalty than when any of the single heuristics were used alone. Furthermore, we demonstrate that the fuzzy approach used less backtracking when constructing solutions than any of the single heuristics. We conclude that this novel fuzzy approach is a highly effective method for heuristically constructing solutions and, as such, has particular relevance to real-world situations in which the construction of feasible solutions is often a difficult task in its own right.