15 resultados para ENGINEERING, INDUSTRIAL
em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo
Resumo:
The rise of new multinationals in countries like Brazil provides an opportunity to revisit and carefully construct theories of how firms internationalize, a topic on which extant theory is weak. Brazilian firms are "infant multinationals", unlike developed country firms that are "mature multinationals". They are also internationalizing in a very different global context, and can do so on the basis of different competitive advantages than multinationals that came before. Therefore, this study aims at creating subsidies for theory building about early-stage internationalization. Emerging country firms have Production competences as main competitive asset to internationalize, what reflects their competitive positioning in home markets and their entry strategy in international markets. In the case of early-entrants - Western multinationals in the 1950s and Japanese in the 1980s - the Production competence played a key role for successful internationalization. Thus, the focus of the study is the role that the Production competence plays in the internationalization of late-entrants, the emerging country multinationals. The research design considers not only the position of the headquarters but also the initiatives of the subsidiaries and the dynamic interplay between both. The paper allows a better understanding of internationalization processes and the role of Production, when firms start building their own international networks. It brings relevant insights about the paths that are being followed by emerging country multinationals, the difficulties they find, the solutions they develop. These are important inputs not only for new theory building but also for managerial practice. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
In this article, we introduce two new variants of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) that allow parallelization of and collaboration between heterogeneous workers. These new approaches suppose an additional level of complexity in the Line Design and Assignment process, but also higher flexibility; which may be particularly useful in practical situations where the aim is to progressively integrate slow or limited workers in conventional assembly lines. We present linear models and heuristic procedures for these two new problems. Computational results show the efficiency of the proposed approaches and the efficacy of the studied layouts in different situations. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
This article describes a real-world production planning and scheduling problem occurring at an integrated pulp and paper mill (P&P) which manufactures paper for cardboard out of produced pulp. During the cooking of wood chips in the digester, two by-products are produced: the pulp itself (virgin fibers) and the waste stream known as black liquor. The former is then mixed with recycled fibers and processed in a paper machine. Here, due to significant sequence-dependent setups in paper type changeovers, sizing and sequencing of lots have to be made simultaneously in order to efficiently use capacity. The latter is converted into electrical energy using a set of evaporators, recovery boilers and counter-pressure turbines. The planning challenge is then to synchronize the material flow as it moves through the pulp and paper mills, and energy plant, maximizing customer demand (as backlogging is allowed), and minimizing operation costs. Due to the intensive capital feature of P&P, the output of the digester must be maximized. As the production bottleneck is not fixed, to tackle this problem we propose a new model that integrates the critical production units associated to the pulp and paper mills, and energy plant for the first time. Simple stochastic mixed integer programming based local search heuristics are developed to obtain good feasible solutions for the problem. The benefits of integrating the three stages are discussed. The proposed approaches are tested on real-world data. Our work may help P&P companies to increase their competitiveness and reactiveness in dealing with demand pattern oscillations. (C) 2012 Elsevier Ltd. All rights reserved.
Resumo:
According to recent research carried out in the foundry sector, one of the most important concerns of the industries is to improve their production planning. A foundry production plan involves two dependent stages: (1) determining the alloys to be merged and (2) determining the lots that will be produced. The purpose of this study is to draw up plans of minimum production cost for the lot-sizing problem for small foundries. As suggested in the literature, the proposed heuristic addresses the problem stages in a hierarchical way. Firstly, the alloys are determined and, subsequently, the items that are produced from them. In this study, a knapsack problem as a tool to determine the items to be produced from furnace loading was proposed. Moreover, we proposed a genetic algorithm to explore some possible sets of alloys and to determine the production planning for a small foundry. Our method attempts to overcome the difficulties in finding good production planning presented by the method proposed in the literature. The computational experiments show that the proposed methods presented better results than the literature. Furthermore, the proposed methods do not need commercial software, which is favorable for small foundries. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
The integrated production scheduling and lot-sizing problem in a flow shop environment consists of establishing production lot sizes and allocating machines to process them within a planning horizon in a production line with machines arranged in series. The problem considers that demands must be met without backlogging, the capacity of the machines must be respected, and machine setups are sequence-dependent and preserved between periods of the planning horizon. The objective is to determine a production schedule to minimise the setup, production and inventory costs. A mathematical model from the literature is presented, as well as procedures for obtaining feasible solutions. However, some of the procedures have difficulty in obtaining feasible solutions for large-sized problem instances. In addition, we address the problem using different versions of the Asynchronous Team (A-Team) approach. The procedures were compared with literature heuristics based on Mixed Integer Programming. The proposed A-Team procedures outperformed the literature heuristics, especially for large instances. The developed methodologies and the results obtained are presented.
Resumo:
In this paper, we address the problem of defining the product mix in order to maximise a system's throughput. This problem is well known for being NP-Complete and therefore, most contributions to the topic focus on developing heuristics that are able to obtain good solutions for the problem in a short CPU time. In particular, constructive heuristics are available for the problem such as that by Fredendall and Lea, and by Aryanezhad and Komijan. We propose a new constructive heuristic based on the Theory of Constraints and the Knapsack Problem. The computational results indicate that the proposed heuristic yields better results than the existing heuristic.
Resumo:
Companies are currently choosing to integrate logics and systems to achieve better solutions. These combinations also include companies striving to join the logic of material requirement planning (MRP) system with the systems of lean production. The purpose of this article was to design an MRP as part of the implementation of an enterprise resource planning (ERP) in a company that produces agricultural implements, which has used the lean production system since 1998. This proposal is based on the innovation theory, theory networks, lean production systems, ERP systems and the hybrid production systems, which use both components and MRP systems, as concepts of lean production systems. The analytical approach of innovation networks enables verification of the links and relationships among the companies and departments of the same corporation. The analysis begins with the MRP implementation project carried out in a Brazilian metallurgical company and follows through the operationalisation of the MRP project, until its production stabilisation. The main point is that the MRP system should help the company's operations with regard to its effective agility to respond in time to demand fluctuations, facilitating the creation process and controlling the branch offices in other countries that use components produced in the matrix, hence ensuring more accurate estimates of stockpiles. Consequently, it presents the enterprise knowledge development organisational modelling methodology in order to represent further models (goals, actors and resources, business rules, business process and concepts) that should be included in this MRP implementation process for the new configuration of the production system.
Resumo:
Objective: This research aims to assess apprentices' and trainees' work conditions, psychosocial factors at work, as well as health symptoms after joining the labor force. Background: Despite the fact that there are over 3.5 million young working students in Brazil, this increasing rate brings with it difficult working conditions such as work pressure, heavy workloads, and lack of safety training. Method: This study was carried out in a nongovernmental organization (NGO) with 40 young members of a first job program in the city of Sao Paulo, Brazil. They filled out a comprehensive questionnaire focused on sociodemographic variables, working conditions, and health symptoms. Individual and collective semi-structured interviews were conducted. Empirical data analysis was performed using analysis of content. Results: The majority of participants mentioned difficulties in dealing with the pressure and their share of responsibilities at work. Body pains, headaches, sleep deprivation during the workweek, and frequent colds were mentioned. Lack of appropriate task and safety training contributed to the occurrence of work injuries. Conclusion: Having a full-time job during the day coupled with evening high school attendance may jeopardize these people's health and future. Application: This study can make a contribution to the revision and implementation of work training programs for adolescents. It can also help in the creation of more sensible policies regarding youth employment.
Resumo:
In this article, we present a new control chart for monitoring the covariance matrix in a bivariate process. In this method, n observations of the two variables were considered as if they came from a single variable (as a sample of 2n observations), and a sample variance was calculated. This statistic was used to build a new control chart specifically as a VMIX chart. The performance of the new control chart was compared with its main competitors: the generalized sampled variance chart, the likelihood ratio test, Nagao's test, probability integral transformation (v(t)), and the recently proposed VMAX chart. Among these statistics, only the VMAX chart was competitive with the VMIX chart. For shifts in both variances, the VMIX chart outperformed VMAX; however, VMAX showed better performance for large shifts (higher than 10%) in one variance.
Resumo:
Based on literature, this article aims to present the "participant-observation" research protocol, and its practical application in the industrial engineering field, more specifically within the area of design development, and in the case shown by this article, of interiors' design. The main target is to identify the concept of the method, i.e., from its characteristics to structure a general sense about the subject, so that the protocol can be used in different areas of knowledge, especially those ones which are committed with the scientific research involving the expertise from researchers, and subjective feelings and opinions of the users of an engineering product, and how this knowledge can be benefic for product design, contributing since the earliest stage of design.
Resumo:
Industrial production of semi-synthetic cephalosporins by Penicillium chrysogenum requires supplementation of the growth media with the side-chain precursor adipic acid. In glucose-limited chemostat cultures of P. chrysogenum, up to 88% of the consumed adipic acid was not recovered in cephalosporinrelated products, but used as an additional carbon and energy source for growth. This low efficiency of side-chain precursor incorporation provides an economic incentive for studying and engineering the metabolism of adipic acid in P. cluysogenum. Chemostat-based transcriptome analysis in the presence and absence of adipic acid confirmed that adipic acid metabolism in this fungus occurs via beta-oxidation. A set of 52 adipate-responsive genes included six putative genes for acyl-CoA oxidases and dehydrogenases, enzymes responsible for the first step of beta-oxidation. Subcellular localization of the differentially expressed acyl-CoA oxidases and dehydrogenases revealed that the oxidases were exclusively targeted to peroxisomes, while the dehydrogenases were found either in peroxisomes or in mitochondria. Deletion of the genes encoding the peroxisomal acyl-CoA oxidase Pc20g01800 and the mitochondrial acyl-CoA dehydrogenase Pc20g07920 resulted in a 1.6- and 3.7-fold increase in the production of the semi-synthetic cephalosporin intermediate adipoyl-6-APA, respectively. The deletion strains also showed reduced adipate consumption compared to the reference strain, indicating that engineering of the first step of beta-oxidation successfully redirected a larger fraction of adipic acid towards cephalosporin biosynthesis. (C) 2012 Elsevier Inc. All rights reserved.
Resumo:
Industrial recurrent event data where an event of interest can be observed more than once in a single sample unit are presented in several areas, such as engineering, manufacturing and industrial reliability. Such type of data provide information about the number of events, time to their occurrence and also their costs. Nelson (1995) presents a methodology to obtain asymptotic confidence intervals for the cost and the number of cumulative recurrent events. Although this is a standard procedure, it can not perform well in some situations, in particular when the sample size available is small. In this context, computer-intensive methods such as bootstrap can be used to construct confidence intervals. In this paper, we propose a technique based on the bootstrap method to have interval estimates for the cost and the number of cumulative events. One of the advantages of the proposed methodology is the possibility for its application in several areas and its easy computational implementation. In addition, it can be a better alternative than asymptotic-based methods to calculate confidence intervals, according to some Monte Carlo simulations. An example from the engineering area illustrates the methodology.
Resumo:
The recent achievement of synthesising a functioning bacterial chromosome marks a coming of age for engineering living organisms. In the future this should allow the construction of novel organisms to help solve the problems facing the human race, including health care, food, energy and environmental protection. In this minireview, the current state of the field is described and the role of synthetic biology in biotechnology in the short and medium term is discussed. It is particularly aimed at the needs of food technologists, nutritionists and other biotechnologists, who might not be aware of the potential significance of synthetic biology to the research and development in their fields. The potential of synthetic biology to produce interesting new polyketide compounds is discussed in detail.
Resumo:
This work proposes a system for classification of industrial steel pieces by means of magnetic nondestructive device. The proposed classification system presents two main stages, online system stage and off-line system stage. In online stage, the system classifies inputs and saves misclassification information in order to perform posterior analyses. In the off-line optimization stage, the topology of a Probabilistic Neural Network is optimized by a Feature Selection algorithm combined with the Probabilistic Neural Network to increase the classification rate. The proposed Feature Selection algorithm searches for the signal spectrogram by combining three basic elements: a Sequential Forward Selection algorithm, a Feature Cluster Grow algorithm with classification rate gradient analysis and a Sequential Backward Selection. Also, a trash-data recycling algorithm is proposed to obtain the optimal feedback samples selected from the misclassified ones.