Two extensions for the ALWABP: Parallel stations and collaborative approach
Contribuinte(s) |
UNIVERSIDADE DE SÃO PAULO |
---|---|
Data(s) |
16/09/2013
16/09/2013
01/11/2012
|
Resumo |
In this article, we introduce two new variants of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) that allow parallelization of and collaboration between heterogeneous workers. These new approaches suppose an additional level of complexity in the Line Design and Assignment process, but also higher flexibility; which may be particularly useful in practical situations where the aim is to progressively integrate slow or limited workers in conventional assembly lines. We present linear models and heuristic procedures for these two new problems. Computational results show the efficiency of the proposed approaches and the efficacy of the studied layouts in different situations. (C) 2012 Elsevier B.V. All rights reserved. |
Identificador |
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, AMSTERDAM, v. 140, n. 1, pp. 483-495, NOV, 2012 0925-5273 http://www.producao.usp.br/handle/BDPI/33365 10.1016/j.ijpe.2012.06.032 |
Idioma(s) |
eng |
Publicador |
ELSEVIER SCIENCE BV AMSTERDAM |
Relação |
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS |
Direitos |
closedAccess Copyright ELSEVIER SCIENCE BV |
Palavras-Chave | #ASSEMBLY LINE BALANCING #HETEROGENEOUS WORKERS #DISABLED INTEGRATION #LINE BALANCING PROBLEM #SHELTERED WORK CENTERS #ASSEMBLY SYSTEM-DESIGN #MODEL #WORKSTATIONS #BRANCH #ASSIGNMENT #ALGORITHM #ENGINEERING, INDUSTRIAL #ENGINEERING, MANUFACTURING #OPERATIONS RESEARCH & MANAGEMENT SCIENCE |
Tipo |
article original article publishedVersion |