198 resultados para Production lot-scheduling models

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning,mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been a boom in Australian horror movie production in recent years. Daybreakers (2010), Wolf Creek (2005), Rogue (2007), Undead (2003), Black Water (2008), and Storm Warning (2006) among others, have all experienced varying degrees of popularity, mainstream visibility, and cult success in worldwide horror markets. While Aussie horror’s renaissance is widely acknowledged in industry literature, there is limited research into the extent of the boom and the dynamics of production. Consequently, there are few explanations for why and how this surge has occurred. This paper argues that the recent growth in Australian horror films has been driven by intersecting international market forces, domestic financing factors, and technological change. In so doing, it identifies two distinct tiers of Australian horror film production: ‘mainstream’ and ‘underground’ production; though overlap between these two tiers results in ‘high-end indie’ films capable of cinema release. Each tier represents the high and low-ends of Australian horror film production, each with different financing, production, and distribution models.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cultural policy settings attempting to foster the growth and development of the Australian feature film industry in era of globalisation are coming under increasing pressure. Global forces and emerging production and distribution models are challenging the “narrowness” of cultural policy – mandating a particular film culture, circumscribing certain notions of value and limiting the variety of films produced through cultural policy driven subvention models. Australian horror film production is an important case study. Horror films are a production strategy well suited to the financial limitations of the Australian film industry with competitive advantages for producers against international competitors. However, emerging within a “national” cinema driven by public subsidy and social/cultural objectives, horror films – internationally oriented with a low-culture status – have been severely marginalised within public funding environments. This paper introduces Australian horror film production, and examines the limitations of cultural policy, and the impacts of these questions for the Producer Offset.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cultural policy that attempts to foster the Australian film industry’s growth and development in an era of globalisation is coming under increasing pressure. Throughout the 2000s, there has been a substantial boom in Australian horror films led by ‘runaway’ horror film Saw (2004), Wolf Creek (2005), and Undead (2003), achieving varying levels of popularity and commercial success worldwide. However, emerging within a national cinema driven by public subsidy and valuing ‘quality’ and ‘cultural content’ over ‘entertainment’ and ‘commercialism’, horror films have generally been antithetical to these objectives. Consequently, the recent boom in horror films has occurred largely outside the purview and subvention of cultural policy. This paper argues that global forces and emerging production and distribution models are challenging the ‘narrowness’ of cultural policy – a narrowness that mandates a particular film culture, circumscribes certain notions of value and limits the variety of films produced domestically. Despite their low-culture status, horror films have been well suited to the Australian film industry’s financial limitations, they are a growth strategy for producers, and a training ground for emerging filmmakers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian screen industries are a leading domestic creative industry sector at a crossroad. New production, distribution and exhibition technologies are challenging traditional models of ‘filmmaking’. For the screen industries to remain competitive they must renovate business models for an emerging marketplace. This paper is a preliminary examination of three key aspects of next generation filmmaking: post-cinema approaches to screen production, emerging production and business models, and issues for policy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Historically, the public service broadcaster (PSB) acted beyond its institutional broadcasting remit by initiating and facilitating activities to support cultural infrastructure and national identity (Wilson, Hutchinson and Shea 2010). The recent focus to develop new content delivery platforms and services (Debrett 2010) signifies a semantic shift from the PSB to the public service media (PSM) organisation. The Australian PSM organisation, the Australian Broadcasting Corporation (ABC) has moved beyond the era of ‘online’ publishing to incorporate Web 2.0 technologies to foster new relationships with the audience (Walker 2009) and engage in production activities with participatory cultures (Jenkins 2006). This shift presents opportunities and challenges to traditional media production, the existing editorial policies and governance models, and raises questions around the value of PSM experimental and innovative activities. Further, the incorporation of information communication technologies and participatory cultures challenge the core values of ‘public service’ within PSM. This paper examines ABC Pool (abc.net.au/pool) as a means of extending the ABC’s public service remit by incorporating participatory cultures into the production and governance models of the corporation and critically analyses the public value of such innovative experiments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

More evenly spread demand for public transport throughout a day can reduce transit service provider‟s total asset and labour costs. A plausible peak spreading strategy is to increase peak fare and/or to reduce off-peak fare. This paper reviews relevant empirical studies for urban rail systems, as rail transit plays a key role in Australian urban passenger transport and experiences severe peak loading variability. The literature is categorised into four groups: a) passenger opinions on willingness to change time for travel, b) valuations of displacement time using stated preference technique, c) simulations of peak spreading based on trip scheduling models, and: d) real-world cases of peak spreading using differential fare. Policy prescription is advised to take into account impacts of traveller‟s time flexibility and joint effects of mode shifting and peak spreading. Although focusing on urban rail, arguments in this paper are relevant to public transport in general with values to researchers and practitioners.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Exposure to ultraviolet radiation (UV) results in both damaging and beneficial health outcomes. Excessive UV exposure has been linked to many skin and eye problems, but moderate exposure induces vitamin D production. It has been reported that humans receive 90-95% of their vitamin D from production that starts after UV exposure. Although it is possible to acquire vitamin D through dietary supplementation, the average person receives very little in this manner. Therefore, since most people acquire their vitamin D from synthesis after exposure to UV from sunlight, it is very important to understand the different environments in which people encounter UV. This project measured UV radiation and in-vitro vitamin D production in the urban canyon and at a nearby suburban location. The urban canyon is an environment consisting of tall buildings and tropospheric air pollution, which have an attenuating effect on UV. Typically, UV measurements are collected in areas outside the urban canyon, meaning that at times studies and public recommendations do not accurately represent the amount of UV reaching street-level in highly urbanized areas. Understanding of UV exposure in urban canyons becomes increasingly important as the number of people working and living in large cities steadily increases worldwide. This study was conducted in the central business district (CBD) of Brisbane, Australia, which models the urban canyons of large cities around the world in that it boasts a great number of tall buildings, including many skyscrapers, meaning that most areas only see a small amount of direct sunlight each day. During the winter of 2007 measurements of UV radiation and in-vitro vitamin D production were collected in the CBD and at a suburban site approximately 2.5km outside the CBD. Air pollution data was obtained from a central CBD measurement site. Data analysis showed that urban canyon measurements of both UV radiation and in-vitro vitamin D production were significantly lower than those collected at the suburban site. These results will aid both future researchers and policy makers in better understanding human UV exposure in Brisbane’s CBD and other urban canyons around the world.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent decades a number of Australian artists and teacher/artists have given serious attention to the creation of performance forms and performance engagement models that respect children’s intelligence, engage with themes of relevance, avoid the cliche´s of children’s theatre whilst connecting both sincerely and playfully with current understandings of the way in which young children develop and engage with the world. Historically a majority of performing arts companies touring Australian schools or companies seeking schools to view a performance in a dedicated performance venue engage with their audiences in what can be called a ‘drop-in drop-out’ model. A six-month practice-led research project (The Tashi Project) which challenged the tenets of the ‘drop-in drop-out’ model has been recently undertaken by Sandra Gattenhof and Mark Radvan in conjunction with early childhood students from three Brisbane primary school classrooms who were positioned as co-researchers and co-artists. The children, researchers and performers worked in a complimentary relationship in both the artistic process and the development of product.