An interactive planning and scheduling framework for optimising pits-to-crushers operations
Data(s) |
01/03/2012
|
---|---|
Resumo |
In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning,mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value. |
Formato |
application/pdf |
Identificador | |
Publicador |
Korean Institute of Industrial Engineers |
Relação |
http://eprints.qut.edu.au/67056/1/LiuKozan_IEMS2012.pdf http://koreascience.or.kr/article/ArticleFullRecord.jsp?cn=SGHHEA_2012_v11n1_94 DOI:10.7232/iems.2012.11.1.094 Liu, Shi Qiang & Kozan, Erhan (2012) An interactive planning and scheduling framework for optimising pits-to-crushers operations. Industrial Engineering & Management Systems, 11(1), pp. 94-102. |
Direitos |
Copyright 2012 KIIE |
Fonte |
Science & Engineering Faculty; Mathematical Sciences |
Palavras-Chave | #010206 Operations Research #091405 Mining Engineering #Open Pit Mining #Mine Design Planning #Mine Production Sequencing #Mine Transportation Scheduling #Pits to Crushers |
Tipo |
Journal Article |