492 resultados para Engineering contracts
em Queensland University of Technology - ePrints Archive
Resumo:
The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.