470 resultados para Construction Engineering

em Queensland University of Technology - ePrints Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Survey results provide a preliminary assessment of the relative contribution of a range of tactical business strategies to innovation performance by firms in the Australian construction industry. Over 1,300 firms were surveyed in 2004, resulting in a response rate of 29%. Respondents were classified as high, medium or low innovators according to an innovation index based on the novelty and impact of their innovations and their adoption of listed technological and organizational advances. The relative significance of 23 business strategies concerning (1) employees, (2) marketing, (3) technology, (4) knowledge and (5) relationships was examined by determining the extent to which they distinguished high innovators from low innovators. The individual business strategies that most strongly distinguished high innovators were (1) ‘investing in R&D’, (2) ‘participating in partnering and alliances on projects’, (3) ‘ensuring project learnings are transferred into continuous business processes’, (4) ‘monitoring international best practice’, and (5) ‘recruiting new graduates’. Of the five types of strategies assessed, marketing strategies were the least significant in supporting innovation. The results provide practical guidance to managers in project-based industries wishing to improve their innovation performance.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) that describes and quantifies the relationships between corporate culture and safety performance. The SEM is estimated using 196 individual questionnaire responses from three companies with better than average safety records. A multiattribute analysis of corporate safety culture characteristics resulted in a hierarchical description of corporate safety culture comprised of three major categories — people, process, and value. These three major categories were decomposed into 54 measurable questions and used to develop a questionnaire to quantify corporate safety culture. The SEM identified five latent variables that describe corporate safety culture: (1) a company’s safety commitment; (2) the safety incentives that are offered to field personal for safe performance; (3) the subcontractor involvement in the company culture; (4) the field safety accountability and dedication; and (5) the disincentives for unsafe behaviors. These characteristics of company safety culture serve as indicators for a company’s safety performance. Based on the findings from this limited sample of three companies, this paper proposes a list of practices that companies may consider to improve corporate safety culture and safety performance. A more comprehensive study based on a larger sample is recommended to corroborate the findings of this study.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Pragmatic construction professionals, accustomed to intense price competition and focused on the bottom line, have difficulty justifying investments in advanced technology. Researchers and industry professionals need improved tools to analyze how technology affects the performance of the firm. This paper reports the results of research to begin answering the question, “does technology matter?” The researchers developed a set of five dimensions for technology strategy, collected information regarding these dimensions along with four measures of competitive performance in five bridge construction firms, and analyzed the information to identify relationships between technology strategy and competitive performance. Three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit—showed particularly strong correlations with the competitive performance indicators of absolute growth in contract awards and contract award value per technical employee. These findings indicate that technology does matter. The research also provides ways to analyze options for approaching technology and ways to relate technology to competitive performance for use by managers. It also provides a valuable set of research measures for technology strategy.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The focus of knowledge management (KM) in the construction industry is moving towards capability building for value creation. The study reported by this paper is motivated by recent assertions about the genesis and evolution of knowledge management capability (KMC) in the strategic management field. It attempts to shed light on the governance of learning mechanisms that develop KMC within the context of construction firms. A questionnaire survey was administered to a sample of construction contractors operating in the very dynamic Hong Kong market to elicit opinions on the learning mechanisms and business outcomes of targeted firms. On the basis of a total of 149 usable responses, structural equation modeling (SEM) analysis identified relationships among knowledge-governance mechanisms, knowledge processes, and business performance, thereby supporting the existence of strategic learning loops. The study findings provide evidence from the construction context for capability assertions that knowledge-governance mechanisms and processes form learning mechanisms that carry out strategic learning to create value, effect performance outcomes, and ultimately drive the evolution of KMC. The findings imply that it is feasible for managing construction firms to govern learning mechanisms through managing the capability-based holistic KM system, thereby reconfiguring KMC to match needs in the dynamic market environment over time.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The internationalization of construction companies has become of significant interest as the global construction market continues to be integrated into a more competitive and turbulent business environment. However, due to the complicated and multifaceted nature of international business and performance, there is as yet no consensus on how to evaluate the performance of international construction firms (ICFs). The purpose of this paper, therefore, is to develop a practical framework for measuring the performance of ICFs. Based on the balanced scorecard (BSC), a framework with detailed measures is developed, investigated, and tested using a three-step research design. In the first step, 27 measures under six dimensions (financial, market, customer, internal business processes, stakeholders, and learning and growth) are determined by literature review, interviews with academics, and seminar discussions. Subsequently, a questionnaire survey is conducted to investigate weights of these 27 performance measures. The questionnaire survey also supports the importance of measuring intangible aspects of international construction performance from the practitioner’s viewpoint. Additionally, a case study is described to test the framework’s robustness and usefulness. This is achieved by benchmarking the performance of a Chinese ICF with nine other counterparts worldwide. It is found that the framework provides an effective basis for benchmarking ICFs to effectively monitor their performance and support the development of strategies for improved competitiveness in the international arena. This paper is the first attempt to present a balanced and practically tested framework for evaluating the performance of ICFs. It contributes to the practice of performance measurement and related internationalization in the construction industry in general.