177 resultados para Physical modelling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As process management projects have increased in size due to globalised and company-wide initiatives, a corresponding growth in the size of process modeling projects can be observed. Despite advances in languages, tools and methodologies, several aspects of these projects have been largely ignored by the academic community. This paper makes a first contribution to a potential research agenda in this field by defining the characteristics of large-scale process modeling projects and proposing a framework of related issues. These issues are derived from a semi -structured interview and six focus groups conducted in Australia, Germany and the USA with enterprise and modeling software vendors and customers. The focus groups confirm the existence of unresolved problems in business process modeling projects. The outcomes provide a research agenda which directs researchers into further studies in global process management, process model decomposition and the overall governance of process modeling projects. It is expected that this research agenda will provide guidance to researchers and practitioners by focusing on areas of high theoretical and practical relevance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A mathematical model for the galvanostatic discharge and recovery of porous, electrolytic manganese dioxide cathodes, similar to those found within primary alkaline batteries is presented. The phenomena associated with discharge are modeled over three distinct size scales, a cathodic (or macroscopic) scale, a porous manganese oxide particle (or microscopic) scale, and a manganese oxide crystal (or submicroscopic) scale. The physical and chemical coupling between these size scales is included in the model. In addition, the model explicitly accounts for the graphite phase within the cathode. The effects that manganese oxide particle size and proton diffusion have on cathodic discharge and the effects of intraparticle voids and microporous electrode structure are predicted using the model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The anatomy and microstructure of the spine and in particular the intervertebral disc are intimately linked to how they operate in vivo and how they distribute loads to the adjacent musculature and bony anatomy. The degeneration of the intervertebral discs may be characterised by a loss of hydration, loss of disc height, a granular texture and the presence of annular lesions. As such, degeneration of the intervertebral discs compromises the mechanical integrity of their components and results in adaption and modification in the mechanical means by which loads are distributed between adjacent spinal motion segments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is increased recognition that determinants of health should be investigated in a life-course perspective. Retirement is a major transition in the life course and offers opportunities for changes in physical activity that may improve health in the aging population. The authors examined the effect of retirement on changes in physical activity in the GLOBE Study, a prospective cohort study known by the Dutch acronym for "Health and Living Conditions of the Population of Eindhoven and surroundings," 1991–2004. They followed respondents (n = 971) by postal questionnaire who were employed and aged 40–65 years in 1991 for 13 years, after which they were still employed (n = 287) or had retired (n = 684). Physical activity included 1) work-related transportation, 2) sports participation, and 3) nonsports leisure-time physical activity. Multinomial logistic regression analyses indicated that retirement was associated with a significantly higher odds for a decline in physical activity from work-related transportation (odds ratio (OR) = 3.03, 95% confidence interval (CI): 1.97, 4.65), adjusted for sex, age, marital status, chronic diseases, and education, compared with remaining employed. Retirement was not associated with an increase in sports participation (OR = 1.12, 95% CI: 0.71, 1.75) or nonsports leisure-time physical activity (OR = 0.80, 95% CI: 0.54, 1.19). In conclusion, retirement introduces a reduction in physical activity from work-related transportation that is not compensated for by an increase in sports participation or an increase in nonsports leisure-time physical activity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Field and laboratory measurements identified a complex relationship between odour emission rates provided by the US EPA dynamic emission chamber and the University of New South Wales wind tunnel. Using a range of model compounds in an aqueous odour source, we demonstrate that emission rates derived from the wind tunnel and flux chamber are a function of the solubility of the materials being emitted, the concentrations of the materials within the liquid; and the aerodynamic conditions within the device – either velocity in the wind tunnel, or flushing rate for the flux chamber. The ratio of wind tunnel to flux chamber odour emission rates (OU m-2 s) ranged from about 60:1 to 112:1. The emission rates of the model odorants varied from about 40:1 to over 600:1. These results may provide, for the first time, a basis for the development of a model allowing an odour emission rate derived from either device to be used for odour dispersion modelling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Selecting an appropriate business process modelling technique forms an important task within the methodological challenges of a business process management project. While a plethora of available techniques has been developed over the last decades, there is an obvious shortage of well-accepted reference frameworks that can be used to evaluate and compare the capabilities of the different techniques. Academic progress has been made at least in the area of representational analyses that use ontology as a benchmark for such evaluations. This paper reflects on the comprehensive experiences with the application of a model based on the Bunge ontology in this context. A brief overview of the underlying research model characterizes the different steps in such a research project. A comparative summary of previous representational analyses of process modelling techniques over time gives insights into the relative maturity of selected process modelling techniques. Based on these experiences suggestions are made as to where ontology-based representational analyses could be further developed and what limitations are inherent to such analyses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.