211 resultados para IPO Failures


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Among the most disputed issues within the business arena and among academic scholars are which role boards of directors are expected to fulfill, and how they contribute to a company’s success and survival (Monks & Minow, 2008). Recent failures of large corporations worldwide has led corporate governance and strategic management scholars to call for increased board involvement in decision-making (Tricker, 2009) that has paralleled regulators’ requests for higher monitoring and punishments in the case of frauds and misbehaviors (Coffee, 2005)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Qualitative Criminology: Stories from the Field brings to life the stories behind the research of both emerging and established scholars in Australian criminology. The book’s contributors provided honest, reflective, and decidedly unsanitised accounts of their qualitative research journeys - the lively tales of what really happens when conducting research of this nature, the stories that often make for parenthetical asides in conference papers but tend to be excised from journal articles. This book considers the gap between research methods and the realities of qualitative research. As such, it aims to help researchers and students who conduct qualitative criminological research reflect upon their role as researchers, and the practical, ideological and ethical issues which may arise in the course of their research. It is also a call to criminologists to make public the ‘failures’ and missteps of their research endeavours so that we can learn from one another and become better informed and more reflexive qualitative criminologists.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wheel-rail interaction is one of the most important research topics in railway engineering. It includes track vibration, track impact response and safety of the track. Track structure failures caused by impact forces can lead to significant economic loss for track owners through damage to rails and to the sleepers beneath. The wheel-rail impact forces occur because of imperfections on the wheels or rails such as wheel flats, irregular wheel profile, rail corrugation and differences in the height of rails connected at a welded joint. The vehicle speed and static wheel load are important factors of the track design, because they are related to the impact forces under wheel-rail defects. In this paper, a 3-Dimensional finite element model for the study of wheel flat impact is developed by use of the FEA software package ANSYS. The effects of the wheel flat to impact force on sleepers with various speeds and static wheel loads under a critical wheel flat size are investigated. It has found that both wheel-rail impact force and impact force on sleeper induced by wheel flat are varying nonlinearly by increasing the vehicle speed; both impact forces are nonlinearly and monotonically increasing by increasing the static wheel load. The relationships between both of impact forces induced by wheel flat and vehicles speed or static load are important to the track engineers to improve the design and maintenance methods in railway industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wheel–rail interaction is one of the most important research topics in railway engineering. It involves track impact response, track vibration and track safety. Track structure failures caused by wheel–rail impact forces can lead to significant economic loss for track owners through damage to rails and to the sleepers beneath. Wheel–rail impact forces occur because of imperfections in the wheels or rails such as wheel flats, irregular wheel profiles, rail corrugations and differences in the heights of rails connected at a welded joint. A wheel flat can cause a large dynamic impact force as well as a forced vibration with a high frequency, which can cause damage to the track structure. In the present work, a three-dimensional (3-D) finite element (FE) model for the impact analysis induced by the wheel flat is developed by use of the finite element analysis (FEA) software package ANSYS and validated by another validated simulation. The effect of wheel flats on impact forces is thoroughly investigated. It is found that the presence of a wheel flat will significantly increase the dynamic impact force on both rail and sleeper. The impact force will monotonically increase with the size of wheel flats. The relationships between the impact force and the wheel flat size are explored from this finite element analysis and they are important for track engineers to improve their understanding of the design and maintenance of the track system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this submission, we provide evidence for our view that copyright policy in the UK must encourage new digital business models which meet the changing needs of consumers and foster innovation in the UK both within, and beyond, the creative industries. We illustrate our arguments using evidence from the music industry. However, we believe that our key points on the relationship between the copyright system and innovative digital business models apply across the UK creative industries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Rainfall has been identified as one of the main causes for embankment failures in areas where high annual rainfall is experienced. The inclination of the embankment slope is important for its stability during rainfall. In this study, instrumented model embankments were subjected to artificial rainfalls to investigate the effects of the slope inclination on their stability. The results of the study suggested that when the slope inclination is greater than the friction angle of the soil, the failure is initiated by the loss of soil suction and when it is smaller than the friction angle of the soil, the failure is initiated by the positive pore water pressure developed at the toe of the slope. Further, slopes become more susceptible to sudden collapse during rainfall as the slope angle increases.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Qualitative Criminology: Stories from the Field brings to life the stories behind the research of both emerging and established scholars in Australian criminology. The book’s contributors provided honest, reflective, and decidedly unsanitised accounts of their qualitative research journeys - the lively tales of what really happens when conducting research of this nature, the stories that often make for parenthetical asides in conference papers but tend to be excised from journal articles. This book considers the gap between research methods and the realities of qualitative research. As such, it aims to help researchers and students who conduct qualitative criminological research reflect upon their role as researchers, and the practical, ideological and ethical issues which may arise in the course of their research. It is also a call to criminologists to make public the ‘failures’ and missteps of their research endeavours so that we can learn from one another and become better informed and more reflexive qualitative criminologists.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over 20% of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective programme governance of safety outcomes. Typically, the projects within these airworthiness management programmes are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Programme governance provides the structure through which the goals and objectives of airworthiness programmes are set along with the means of attaining them. Whilst the principal causes of failures in many programmes can be traced to inadequate programme governance, many of the failures in large-scale projects can have their root causes in the organizational culture and more specifically in the organizational processes related to decision-making. This paper examines the primary theme of project and programme-based enterprises, and introduces a model for measuring organizational culture in airworthiness management programmes using measures drawn from 211 respondents in Australian airline programmes. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organizational culture of programmes for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organizational culture data collected from seven airworthiness management programmes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The common presupposition of Enterprise Systems (ES) is that they lead to significant efficiency gains. However, this is only the case for well-implemented ES that meet organisational requirements. The list of major ES implementation failures is as long as the list of success stories. We argue here that this arises from a more fundamental problem, the functionalist approach to ES development and provision. As long as vendors will continue to develop generic, difficult-to-adapt ES packages, this problem will prevail because organisations have a non-generic character. A solution to this problem can only consist in rethinking the way ES packages are provided. We propose a strict abstraction layer of ES functionalities and their representation as conceptual models. ES vendors must provide sufficient means for configuring these conceptual models. We discuss in this paper what generic situations can occur during process model configuration in order to understand process model configuration in depth.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Vacuum circuit breaker (VCB) overvoltage failure and its catastrophic failures during shunt reactor switching have been analyzed through computer simulations for multiple reignitions with a statistical VCB model found in the literature. However, a systematic review (SR) that is related to the multiple reignitions with a statistical VCB model does not yet exist. Therefore, this paper aims to analyze and explore the multiple reignitions with a statistical VCB model. It examines the salient points, research gaps and limitations of the multiple reignition phenomenon to assist with future investigations following the SR search. Based on the SR results, seven issues and two approaches to enhance the current statistical VCB model are identified. These results will be useful as an input to improve the computer modeling accuracy as well as the development of a reignition switch model with point-on-wave controlled switching for condition monitoring

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Related-party (RP) transactions are said to be commonly used opportunistically in business and contribute to corporate failures. While periodic disclosure is widely accepted as an effective means of monitoring such transactions, research is scant, particularly in countries where business dealings may be more susceptible to corruption. This study investigates the nature and extent of corporate RP disclosures across six countries in the Asia-Pacific region. The key finding indicates that companies in countries with stronger regulatory enforcement, shareholders’ protection, and control for corruption, have more transparent RP disclosures. This evidence potentially contributes to reforms aimed at strengthening RP disclosure and compliance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many software applications extend their functionality by dynamically loading executable components into their allocated address space. Such components, exemplified by browser plugins and other software add-ons, not only enable reusability, but also promote programming simplicity, as they reside in the same address space as their host application, supporting easy sharing of complex data structures and pointers. However, such components are also often of unknown provenance and quality and may be riddled with accidental bugs or, in some cases, deliberately malicious code. Statistics show that such component failures account for a high percentage of software crashes and vulnerabilities. Enabling isolation of such fine-grained components is therefore necessary to increase the stability, security and resilience of computer programs. This thesis addresses this issue by showing how host applications can create isolation domains for individual components, while preserving the benefits of a single address space, via a new architecture for software isolation called LibVM. Towards this end, we define a specification which outlines the functional requirements for LibVM, identify the conditions under which these functional requirements can be met, define an abstract Application Programming Interface (API) that encompasses the general problem of isolating shared libraries, thus separating policy from mechanism, and prove its practicality with two concrete implementations based on hardware virtualization and system call interpositioning, respectively. The results demonstrate that hardware isolation minimises the difficulties encountered with software based approaches, while also reducing the size of the trusted computing base, thus increasing confidence in the solution’s correctness. This thesis concludes that, not only is it feasible to create such isolation domains for individual components, but that it should also be a fundamental operating system supported abstraction, which would lead to more stable and secure applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pressure feeder chutes are pieces of equipment used in sugar cane crushing to increase the amount of cane that can be put through a mill. The continuous pressure feeder was developed with the objective to provide a constant feed of bagasse under pressure to the mouth of the crushing mills. The pressure feeder chute is used in a sugarcane milling unit to transfer bagasse from one set of crushing rolls to a second set of crushing rolls. There have been many pressure feeder chute failures in the past. The pressure feeder chute is quite vulnerable and if the bagasse throughput is blocked at the mill rollers, the pressure build-up in the chute can be enormous, which can ultimately result in failure. The result is substantial damage to the rollers, mill and chute construction, and downtimes of up to 48 hours can be experienced. Part of the problem is that the bagasse behaviour in the pressure feeder chute is not understood well. If the pressure feeder chute behaviour was understood, then the chute geometry design could be modified in order to minimise risk of failure. There are possible avenues for changing pressure feeder chute design and operations with a view to producing more reliable pressure feeder chutes in the future. There have been previous attempts to conduct experimental work to determine the causes of pressure feeder chute failures. There are certain guidelines available, however pressure feeder chute failures continue. Pressure feeder chute behaviour still remains poorly understood. This thesis contains the work carried out between April 14th 2009 and October 10th 2012 that focuses on the design of an experimental apparatus to measure forces and visually observe bagasse behaviour in an attempt to understand bagasse behaviour in pressure feeder chutes and minimise the risk of failure.