439 resultados para Engineering asset health management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has long been considered to have unacceptably high injury and fatality rates. Previous research has shown that small construction companies sustain higher injury rates than large companies. However, despite the industry being dominated by a very large number of such small companies, little is known of their occupational health and safety (OHS) needs, practices and constraints. This paper takes a first step in aiming to identify the principal barriers that affect good OHS performance of small construction companies so that effective OHS practices can be developed to improve this in future. The contents of the literature are first summarised, in which three critical barriers to good OHS practice in small construction firms are proposed. They are : cost, time, lack of safety awareness and concern. The results of a questionnaire survey carried out with South East Queensland construction personnel are presented, which largely confirm what is suggested by the literature research and also succeed in providing an indication of their ranking in terms of importance and suggestions for overcoming these barriers. The research results provide a better understanding of the issues that restrict good OHS practice in small construction companies and potential measures for improvement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large sized power transformers are important parts of the power supply chain. These very critical networks of engineering assets are an essential base of a nation’s energy resource infrastructure. This research identifies the key factors influencing transformer normal operating conditions and predicts the asset management lifespan. Engineering asset research has developed few lifespan forecasting methods combining real-time monitoring solutions for transformer maintenance and replacement. Utilizing the rich data source from a remote terminal unit (RTU) system for sensor-data driven analysis, this research develops an innovative real-time lifespan forecasting approach applying logistic regression based on the Weibull distribution. The methodology and the implementation prototype are verified using a data series from 161 kV transformers to evaluate the efficiency and accuracy for energy sector applications. The asset stakeholders and suppliers significantly benefit from the real-time power transformer lifespan evaluation for maintenance and replacement decision support.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This workshop is jointly organized by EFMI Working Groups Security, Safety and Ethics and Personal Portable Devices in cooperation with IMIA Working Group "Security in Health Information Systems". In contemporary healthcare and personal health management the collection and use of personal health information takes place in different contexts and jurisdictions. Global use of health data is also expanding. The approach taken by different experts, health service providers, data subjects and secondary users in understanding privacy and the privacy expectations others may have is strongly context dependent. To make eHealth, global healthcare, mHealth and personal health management successful and to enable fair secondary use of personal health data, it is necessary to find a practical and functional balance between privacy expectations of stakeholder groups. The workshop will highlight these privacy concerns by presenting different cases and approaches. Workshop participants will analyse stakeholder privacy expectations that take place in different real-life contexts such as portable health devices and personal health records, and develop a mechanism to balance them in such a way that global protection of health data and its meaningful use is realized simultaneously. Based on the results of the workshop, initial requirements for a global healthcare information certification framework will be developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge has been recognised as an important organisational asset that increases in value when shared; the opposite to other organisational assets which decrease in value during their exploitation. Effective knowledge transfer in organisations helps to achieve and maintain competitive advantage and ultimately organisational success. So far, the research on knowledge transfer has focused on traditional (functional) organisations. Only recently has attention been directed towards knowledge transfer in projects. Existing research on project learning has recognised the need for knowledge transfer within and across projects in project-based organisations (PBOs). Most projects can provide valuable new knowledge from unexpected actions, approaches or problems experienced during the project phases. The aim of this paper is to demonstrate the impact of unique projects characteristics on knowledge transfer in PBO. This is accomplished through review of the literature and a series of interviews with senior project practitioners. The interviews complement the findings from the literature. Knowledge transfer in projects occurs by social communication and transfer of lessons learned where project management offices (PMOs) and project managers play significant roles in enhancing knowledge transfer and communication within the PBO and across projects. They act as connectors between projects and the PBO ‘hub’. Moreover, some project management processes naturally facilitate knowledge transfer across projects. On the other hand, PBOs face communication challenges due to unique and temporary characteristics of projects. The distance between projects and the lack or weakness of formal links across projects, create communication problems that impede knowledge transfer across projects. The main contribution of this paper is to demonstrate that both social communication and explicit informational channels play important role in inter-project knowledge transfer. Interviews also revealed the important role organisational culture play in knowledge transfer in PBOs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The process of structural health monitoring (SHM) involves monitoring a structure over a period of time using appropriate sensors, extracting damage sensitive features from the measurements made by the sensors and analysing these features to determine the current state of the structure. Various techniques are available for structural health monitoring of structures and acoustic emission (AE) is one technique that is finding an increasing use. Acoustic emission waves are the stress waves generated by the mechanical deformation of materials. AE waves produced inside a structure can be recorded by means of sensors attached on the surface. Analysis of these recorded signals can locate and assess the extent of damage. This paper describes preliminary studies on the application of AE technique for health monitoring of bridge structures. Crack initiation or structural damage will result in wave propagation in solid and this can take place in various forms. Propagation of these waves is likely to be affected by the dimensions, surface properties and shape of the specimen. This, in turn, will affect source localization. Various laboratory test results will be presented on source localization, using pencil lead break tests. The results from the tests can be expected to aid in enhancement of knowledge of acoustic emission process and development of effective bridge structure diagnostics system.