831 resultados para Australian JGOFS Projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Community-based arts and media movements have been intsrumental in building population-wide creative capacity for cultural development, social participation and social transformation in many parts of the world. Digital storytelling is a form of media practice that was pioneered in the United States at the intersection of these movements. It is described here as a ‘co-creative’ media production method. This description aims to differentiate the approaches to collaborative content creation that are used in community cultural development (CCD) and community media movements from those valued in professional and consumer modes of media production. Yet, the products of co-creative practices, such as digital stories, do not circulate widely through existing media networks or through the newer social media networks that Australian CCD and community media movements anticipated by at least twenty years. The complex politics of story ownership are one of a number of factors that often render ‘publication’ a secondary consideration in the making of digital stories. The possibility of ‘downstream’ use and re-use of stories in other networks is not usually considered in initial planning and development processes. As landmark projects such as Capture Wales indicate, even where stories are made for broadcast outcomes, television can be a problematic window for exhibiting digital stories. Scepticism about the brave new world of reality television and user generated content also circulates in digital storytelling networks, especially when it comes to ethical concerns for managing the risks of harm associated with widespread distribution of digital stories to indiscriminate publics. This publication reports on a collaborative action research project that took a closer look at some of the constraints relating to the problems of re-purposing digital stories for television. It focussed on ‘best practice’ for managing the risks of harm to storytellers in the process of re-purposing digital stories for broadcast on community television.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A recent success story of the Australian videogames industry is Brisbane based Halfbrick Studios, developer of the hit game for mobile devices, Fruit Ninja. Halfbrick not only survived the global financial crisis and an associated downturn in the Australian industry, but grew strongly, moving rapidly from developing licensed properties for platforms such as Game Boy Advance, Nintendo DS, and Playstation Portable (PSP) to becoming an independent developer and publisher of in-house titles, generating revenue both through App downloads and merchandise sales. Amongst the reasons for Halfbrick’s success is their ability to adaptively transform by addressing different technical platforms, user dynamics, business models and market conditions. Our ongoing case-study research from 2010 into Halfbrick’s innovation processes, culminating with some 10 semi-structured interviews with senior managers and developers, has identified a strong focus on workplace organisational culture, with staff reflecting that the company is a flat, team-based organisation devolving as much control as possible to the development teams directly, and encouraging a work-life balance in which creativity can thrive. The success of this strategy is evidenced through Halfbrick’s low staff turnover; amongst our interviewees most of the developers had been with the company for a number of years, with all speaking positively of the workplace culture and sense of creative autonomy they enjoyed. Interviews with the CEO, Shainiel Deo, and team leaders highlighted the autonomy afforded to each team and the organisation and management of the projects on which they work. Deo and team leaders emphasised the collaboration and communication skills they require in the developers that they employ, and that these characteristics were considered just as significant in hiring decisions as technical skills. Halfbrick’s developers celebrate their workplace culture and insist it has contributed to their capacity for innovation and to their commercial success with titles such as Fruit Ninja. This model of organisational management is reflected in both Stark’s (2009) idea of heterarchy, and Neff’s (2012) concept of venture labour, and provides a different perspective on the industry than the traditional political economy critique of precarious labour exploited by gaming conglomerates. Nevertheless, throughout many of the interviews and in our informal discussions with Halfbrick developers there is also a sense that this rewarding culture is quite tenuous and precarious in the context of a rapidly changing and uncertain global videogames industry. Whether such a workplace culture represents the future of the games industry, or is merely a ‘Prague Spring’ before companies such as Halfbrick are swallowed by traditional players’ remains to be seen. However, as the process of rapid and uncertain transformation plays out across the videogames industry, it is important to pay attention to emerging modes of organisation and workplace culture, even whilst they remain at the margins of the industry. In this paper we investigate Halfbrick’s workplace culture and ask how sustainable is this kind of rewarding and creative workplace?

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ongoing innovation in digital animation and visual effects technologies has provided new opportunities for stories to be visually rendered in ways never before possible. Films featuring animation and visual effects continue to perform well at the box office, proving to be highly profitable projects. The Avengers (Whedon, 2012) holds the current record for opening weekend sales, accruing as much as $207,438,708 USD and $623,357,910 USD gross at time of writing. Life of Pi (Lee, 2012) at time of writing has grossed as much as $608,791,063 USD (Box Office Mojo, 2013). With so much creative potential and a demonstrable ability to generate a large amount of revenue, the animation and visual effects industry – otherwise known as the Post, Digital and Visual Effects (PDV) industry – has become significant to the future growth and stability of the Australian film industry as a whole.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Process improvement has become a number one business priority, and more and more project requests are raised in organizations, seeking approval and resources for process-related projects. Realistically, the total of the requested funds exceeds the allocated budget, the number of projects is higher than the available bandwidth, and only some of these (very often only few) can be supported and most never see any light. Relevant resources are scarce, and correct decisions must be made to make sure that those projects that are of best value are implemented. How can decision makers make the right decision on the following: Which project(s) are to be approved and when to commence work on them? Which projects are most aligned with corporate strategy? How can the project’s value to the business be calculated and explained? How can these decisions be made in a fair, justifiable manner that brings the best results to the company and its stakeholders? This chapter describes a business value scoring (BVS) model that was built, tested, and implemented by a leading financial institution in Australia to address these very questions. The chapter discusses the background and motivations for such an initiative and describes the tool in detail. All components and underlying concepts are explained, together with details on its application. This tool has been successfully implemented in the case organization. The chapter provides practical guidelines for organizations that wish to adopt this approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND Research on engineering design is a core area of concern within engineering education and a fundamental understanding of how engineering students approach and undertake design is necessary in order to develop effective design models and pedagogies. Understanding the factors related to design experiences in education and how they affect student practice can help educators as well as designers to leverage these factors as part of the design process. PURPOSE This study investigated the design practices of first-year engineering students’ and their experiences with a first-year engineering course design project. The research questions that guided the investigation were: 1. From a student perspective, what design parameters or criteria are most important? 2. How does this perspective impact subsequent student design practice throughout the design process? DESIGN/METHOD The authors employed qualitative multi-case study methods (Miles & Huberman, 1994) in order to the answer the research questions. Participant teams were observed and video recorded during team design meetings in which they researched the background for the design problem, brainstormed and sketched possible solutions, as well as built prototypes and final models of their design solutions as part of a course design project. Analysis focused on explanation building (Yin, 2009) and utilized within-case and cross-case analysis (Miles & Huberman, 1994). RESULTS We found that students focused disproportionally on the functional parameter, i.e. the physical implementation of their solution, and the possible/applicable parameter, i.e. a possible and applicable solution that benefited the user, in comparison to other given parameters such as safety and innovativeness. In addition, we found that individual teams focused on the functional and possible/ applicable parameters in early design phases such as brainstorming/ ideation and sketching. When prompted to discuss these non-salient parameters (from the student perspective) in the final design report, student design teams often used a post-hoc justification to support how the final designs fit the parameters that they did not initially consider. CONCLUSIONS This study suggests is that student design teams become fixated on (and consequently prioritize) certain parameters they interpret as important because they feel these parameters were described more explicitly in terms how they were met and assessed. Students fail to consider other parameters, perceived to be less directly assessable, unless prompted to do so. Failure to consider other parameters in the early design phases subsequently affects their approach in design phases as well. Case studies examining students’ study strategies within three Australian Universities illustrate similarities with some student approaches to design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses the opportunities and challenges that arise within storytelling projects that are facilitated by public service broadcasters and that aim to amplify the voices of ‘ordinary people’. In particular, it focuses on two of the Australian Broadcasting Corporation’s current life storytelling projects: ABC Open and Heywire.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A commitment in 2010 by the Australian Federal Government to spend $466.7 million dollars on the implementation of personally controlled electronic health records (PCEHR) heralded a shift to a more effective and safer patient centric eHealth system. However, deployment of the PCEHR has met with much criticism, emphasised by poor adoption rates over the first 12 months of operation. An indifferent response by the public and healthcare providers largely sceptical of its utility and safety speaks to the complex sociotechnical drivers and obstacles inherent in the embedding of large (national) scale eHealth projects. With government efforts to inflate consumer and practitioner engagement numbers giving rise to further consumer disillusionment, broader utilitarian opportunities available with the PCEHR are at risk. This paper discusses the implications of establishing the PCEHR as the cornerstone of a holistic eHealth strategy for the aggregation of longitudinal patient information. A viewpoint is offered that the real value in patient data lies not just in the collection of data but in the integration of this information into clinical processes within the framework of a commoditised data-driven approach. Consideration is given to the eHealth-as-a-Service (eHaaS) construct as a disruptive next step for co-ordinated individualised healthcare in the Australian context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis explores the shift in perception of design from a styling and product-focused tool, towards a holistic strategic approach within a small to medium sized manufacturing company. This research is significant because it demonstrates how design tools and approaches can be used within business to translate theory into operational, strategic and cultural outcomes. The outcomes of this research will encourage other businesses to take on similar design-led projects with the ultimate goal of employing design as a means to create a sustainable competitive advantage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Dulux Study Tour is a collaborative initiative between Dulux, the Australian Institute of Architects and EmAGN. Each year five (5) architectural professionals (within 10 years of graduation) are selected to join the Dulux Study Tour, an international tour visiting leading architectural firms, recently completed projects and architecturally rich locations. The Dulux Study Tour acknowledges the contribution the selected emerging architects make to practice, research and the culture of architecture, and seeks to further inspire the next generation of emerging architects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study presents the results of the first large scale survey of Australian builders’ beliefs about prefabrication, drawing on 454 surveys completed by representatives of building companies in Queensland and Western Australia. Previous literature has identified a number of broad themes affecting the uptake of prefabrication. The current study builds on this work by using a structured theoretical model based on the Theory of Planned Behaviour (TPB) and the Technology Acceptance Model (TAM), to further explore the specific factors influencing builders’ intentions to increase their use of prefabrication. Information was gathered concerning the characteristics of respondents in addition to three aims. The aims were: (1) To identify the relative importance of a number of key factors which may affect builders’ use of prefabrication, (2) To compare the characteristics of builders using various levels of prefabrication (including none), and; (3) To determine if a model based on the TPB, TAM, and other control variables can explain builders’ intentions to adopt prefabrication on their housing projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.