672 resultados para Project goal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

From the perspective of network, a project team’s social capital consists of conduits network, and resource exchange network. Prior research intensively studies the effect of the structure of conduits network on the team’s performance, assuming knowledge transfer is the causal mechanism linking conduits network to performance. This paper attempts to explore the interrelations between conduits network and knowledge network, and further distinguish the different influence between various conduit networks, and hypothesizes that a project team’s knowledge network mediates the effect of various conduit networks on the team’s performance. This research can enrich our knowledge of disparate influence of the various conduit networks on knowledge transfer, and imply some management practices to enhance the organization’s social capital, and hence improve the organization’s performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Queensland University of Technology (QUT) is faced with a rapidly growing research agenda built upon a strategic research capacity-building program. This presentation will outline the results of a project that has recently investigated QUT’s research support requirements and which has developed a model for the support of eResearch across the university. QUT’s research building strategy has produced growth at the faculty level and within its research institutes. This increased research activity is pushing the need for university-wide eResearch platforms capable of providing infrastructure and support in areas such as collaboration, data, networking, authentication and authorisation, workflows and the grid. One of the driving forces behind the investigation is data-centric nature of modern research. It is now critical that researchers have access to supported infrastructure that allows the collection, analysis, aggregation and sharing of large data volumes for exploration and mining in order to gain new insights and to generate new knowledge. However, recent surveys into current research data management practices by the Australian Partnership for Sustainable Repositories (APSR) and by QUT itself, has revealed serious shortcomings in areas such as research data management, especially its long term maintenance for reuse and authoritative evidence of research findings. While these internal university pressures are building, at the same time there are external pressures that are magnifying them. For example, recent compliance guidelines from bodies such as the ARC, and NHMRC and Universities Australia indicate that institutions need to provide facilities for the safe and secure storage of research data along with a surrounding set of policies, on its retention, ownership and accessibility. The newly formed Australian National Data Service (ANDS) is developing strategies and guidelines for research data management and research institutions are a central focus, responsible for managing and storing institutional data on platforms that can be federated nationally and internationally for wider use. For some time QUT has recognised the importance of eResearch and has been active in a number of related areas: ePrints to digitally publish research papers, grid computing portals and workflows, institutional-wide provisioning and authentication systems, and legal protocols for copyright management. QUT also has two widely recognised centres focused on fundamental research into eResearch itself: The OAK LAW project (Open Access to Knowledge) which focuses upon legal issues relating eResearch and the Microsoft QUT eResearch Centre whose goal is to accelerate scientific research discovery, through new smart software. In order to better harness all of these resources and improve research outcomes, the university recently established a project to investigate how it might better organise the support of eResearch. This presentation will outline the project outcomes, which include a flexible and sustainable eResearch support service model addressing short and longer term research needs, identification of resource requirements required to establish and sustain the service, and the development of research data management policies and implementation plans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Semester 1 2007, a Monitoring Student Engagement study, conducted as part of the Enhancing Transition at Queensland University of Technology (ET@QUT) Project and extending earlier work in the Project by Arora (2006), aimed at mapping the processes and resources used at that time to identify, monitor and manage students in their first year who were at risk of leaving QUT (Shaw, 2007). This identified a lack of documentation of the processes and resources used and revealed an ad-hoc rather than holistic and systematic approach to monitoring student engagement. One of Shaw’s recommendations was to: “To introduce a centralised case management approach to student engagement” (p. 14). That provided the genesis for the Student Success Project that is being reported on here. The aim of the Student Success Project is to trial, evaluate and ultimately establish holistic and systematic ways of helping students who appear to be at-risk of failing or withdrawing from a unit to persist and succeed. Students are profiled as being at-risk if they are absent from more than 2 tutorials in a row without contacting their tutor or if they fail to submit their first assignment. A Project Officer makes personal contact with these students to suggest ways they can get further assistance depending on their situation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document reports on the Innovations Working Group that met at the 10th International Conference “Models in Developing Mathematics Education” from the 11-17th September 2009 in Dresden, Saxony. It briefly describes the over arching and consistent themes that emerged from the numerous papers presented. The authors and titles of each of the papers presented will be listed in Table 2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Exercise for Health program is a telephone-delivered exercise intervention for women with breast cancer (BC) living in regional Queensland. The effect of the program is being evaluated in the context of a randomised controlled trial. Consenting, newly diagnosed BC patients, treated in one of 8 regional Queensland hospitals, were randomly allocated to telephone-based exercise counselling (EC) or usual care (UC) at 6-weeks post-surgery. EC participants received an exercise workbook and 16 calls from an exercise physiologist over 8 months. Physical activity levels (PA) (Active Australia & CHAMPS), quality-of-life (FACTB+4), upper-body function (DASH) and fatigue (FACIT-Fatigue) were assessed at baseline (4-6 weeks post-surgery), 6- and 12-months post-surgery. Preliminary analyses of available 6-month data were conducted using t-tests and repeated measures ANCOVAs. Participating women (n=143; EC n=73, UC n=70) were aged 53±9 years and 30% met PA guidelines at baseline. Up to two thirds of the women received adjuvant therapy during the first 6 months following surgery. Greater improvements (mean change+SD) occurred for the EC vs UC group in weekly sessions of walking (1.83±4.3 vs -0.5±5.5, p=0.029) moderate-vigorous PA (5.0±6.5 vs -1.1±6.1, p=0.005) and strength training (1.9±2.9 vs -0.5±4.2 p<0.001), and in upper-body function, reflected by lower log-transformed disability scores (-0.34±0.44 vs -0.17±0.28, p=0.038). More EC than UC participants met PA guidelines at 6 months (46.3% vs 32.7%). Preliminary findings from this ongoing trial suggest that the telephone is a feasible and effective medium for delivering exercise counselling to newly diagnosed BC patients living in regional areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The dancing doctorate is an interrogative endeavour which can but nurture the art form and forge a beneficial dynamism between those who seek and those who assess the emerging knowledges of dance’. (Vincs, 2009) From 2006-2008 three dance academics from Perth, Brisbane and Melbourne undertook a research project entitled Dancing between Diversity and Consistency: Refining Assessment in Postgraduate Degrees in Dance, funded by the ALTC Priority Projects Program. Although assessment rather than supervision was the primary focus of this research, interviews with 40 examiner/supervisors, 7 research deans and 32 candidates across Australia and across the creative arts, primarily in dance, provide an insight into what might be considered best practice in preparing students for higher research degrees, and the challenges that embodied and experiential knowledges present for supervision. The study also gained the industry perspectives of dance professionals in a series of national forums in 5 cities, based around the value of higher degrees in dance. The qualitative data gathered from these two primary sources was coded and analysed using the NVivo system. Further perspectives were drawn from international consultant and dance researcher Susan Melrose, as well as recent publications in the field. Dance is a young addition to academia and consequently there tends to be a close liaison between the academy and the industry, with a relational fluidity that is both beneficial and problematic. This partially explains why dance research higher degrees are predominantly practice-led (or multi-modal, referring to those theses where practice comprises the substantial examinable component). As a physical, embodied art form, dance engages with the contested territory of legitimising alternative forms of knowledge that do not sit comfortably with accepted norms of research. In supporting research students engaged with dance practice, supervisors traverse the tricky terrain of balancing university academic requirements with studies that are emergent, not only in the practice and attendant theory but in their methodologies and open-ended outcomes; and in an art form in which originality and new knowledge also arises from collaborative creative processes. Formal supervisor accreditation through training is now mandatory in most Australian universities, but it tends to be generic and not address supervisory specificity. This paper offers the kind of alternative proposed by Edwards (2002) that improving postgraduate supervision will be effective if supervisors are empowered to generate their own standards and share best practice; in this case, in ways appropriate to the needs of their discipline and alternative modes of thesis presentation. In order to frame the qualities and processes conducive to this goal, this paper will draw on both the experiences of interviewees and on philosophical premises which underpin the research findings of our study. These include the ongoing challenge of dissolving the binary oppositions of theory and practice, especially in creative arts practice where theory resides in and emerges from the doing as much as in articulating reflection about the doing through what Melrose (2003) terms ‘mixed mode disciplinary practices’. In guiding practitioners through research higher degrees, how do supervisors deal with not only different forms of knowledge but indeed differing modes of knowledge? How can they navigate tensions that occur between the ‘incompatible competencies’ (Candlin, 2000) of the ‘spectating’ academic experts with their ‘irrepressible drive ... to inscribe, interpret, and hence to practise temporal closure’, and practitioner experts who create emergent works of ‘residual unfinishedness’ (Melrose 2006) which are not only embodied but ephemeral, as in the case of live performance?

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Campus Kindergarten is a community-based centre for early childhood education and care located on campus at the University of Queensland (UQ) in Brisbane, Australia. Being located within this diverse community has presented many opportunities for Campus Kindergarten. It is creating and embracing possibilities that has formed the basis for ongoing projects for children and teachers involving research and investigation. In 2002 Campus Kindergarten embarked on a collaborative project with the Art Museum bringing together these two departments within the university community.

Relevância:

20.00% 20.00%

Publicador: