315 resultados para Inter-cycle Variability
Resumo:
In construction, inter-organisational relationships are of the highest importance. Ethical practice and behaviour is a means for improving inter-organisational relationships by providing a clear understanding of the rights and obligations of all parties, improving productivity, affecting long-term business dealings, and influencing quality, time and costs. Therefore, the ability to build sustainable relationships grounded in ethical practice is important to the construction industry. Establishing ethical standards at the beginning of the procurement process provides an ethical platform for the project life cycle and the relationship between procurers and contractors. Therefore it is important to determine what the ethical issues are in the Australian construction industry from members of the industry themselves; including clients. This “bottom up” approach is not a particularly new concept. Ever since the Gyles Royal Commission in 1992 there has been a considerable effort by government agencies to develop policies to improve the ethical behaviour of the industry.
Resumo:
This paper explores inter-agency working and examines the implications of inter-agency operations for delivering multi-domain service outcomes. Cross-agency collaborative approaches to service delivery are suggested to provide the vehicle for achieving integrated service and policy goals. However, it is argued these need to be crafted ‘fit’ for purpose’ and may not be the requisite approach for all joint purposes. Moreover, some commentators suggest that the optimism about these partnership arrangements and cross-agency actions to resolve complex multi-dimensional problems may be misplaced and propose that further research into the actual rather than desired consequences of these arrangements may find that, at times, partnership working creates negative effects. While collaboration and partnerships are often framed as the way to achieve real breakthroughs in service delivery across agencies, there remain key challenges to interagency working. As more and insistent calls for agencies and other community actors to work together in resolving complex social problems are heeded, the implications of working across organizational boundaries need to be further investigated. This paper investigates cases of inter-agency programmes to understand the dimensions and limitations of inter-agency working. The paper concludes by offering a framework for better inter-agency working that has applicability across all sectors.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
In today's highly challenging business environment, an innovative and systemic approach is imperative to survival and growth. Organisational integration and technological integration, are often seen as a catalyst of change that could lead to significant improvements in organisations. The levels of improvement in inter and intra firm integration should arise from a detailed understanding and development of competences within and between organisations. Preliminary findings suggest that lack of trust across organisational cultures within the firms has a negative influence on the development of the capabilities to integrate and align technological innovations and hinders implementation and the effectiveness of the operations. Additionally, poor communication and conflict effects customer satisfaction. Firms need to transfer the competences that support cooperative integration, developed through interaction with supply chain partners, to their relationship arrangements with other supply chain partners, as these are key to ensuring low operational costs.
Resumo:
n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented
Resumo:
Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.
Resumo:
This paper discusses challenges to developers of a national Life Cycle Inventory (LCI) database on which to base assessment of building environmental impacts and a key to development of a fully integrated eco-design tool created for automated eco-efficiency assessment of commercial building design direct from 3D CAD. The scope of this database includes Australian and overseas processing burdens involved in acquiring, processing, transporting, fabricating, finishing and using metals, masonry, timber, glazing, ceramics, plastics, fittings, composites and coatings. Burdens are classified, calculated and reported for all flows of raw materials, fuels, energy and emissions to and from the air, soil and water associated with typical products and services in building construction, fitout and operation. The aggregated life cycle inventory data provides the capacity to generate environmental impact assessment reports based on accepted performance indicators. Practitioners can identify hot spots showing high environmental burdens of a proposed design and drill down to report on specific building components. They can compare assessments with case studies and operational estimates to assist in eco-efficient design of a building, fitout and operation.
Resumo:
Understanding the differences between the temporal and physical aspects of the building life cycle is an essential ingredient in the development of Building Environmental Assessment (BEA) tools. This paper illustrates a theoretical Life Cycle Assessment (LCA) framework aligning temporal decision-making with that of material flows over building development phases. It was derived during development of a prototype commercial building design tool that was based on a 3-D CAD information and communications technology (ICT) platform and LCA software. The framework aligns stakeholder BEA needs and the decision-making process against characteristics of leading green building tools. The paper explores related integration of BEA tool development applications on such ICT platforms. Key framework modules are depicted and practical examples for BEA are provided for: • Definition of investment and service goals at project initiation; • Design integrated to avoid overlaps/confusion over the project life cycle; • Detailing the supply chain considering building life cycle impacts; • Delivery of quality metrics for occupancy post-construction/handover; • Deconstruction profiling at end of life to facilitate recovery.
Resumo:
Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.
Resumo:
A recent article in the Journal of Science and Medicine in Sport by Chapman et al.1 reported data from an empirical investigation comparing lower extremity joint motions, joint coordination and muscle recruitment in expert and novice cyclists. 3D kinematic and intramuscular electromyographic (EMG) analyses revealed no differences between expert and novice cyclists for normalised joint angles and velocities of the pelvis, hip, knee and ankle. However, significant differences in the strength of sagittal plane kinematics for hip–ankle and knee–ankle joint couplings were reported, with expert cyclists displaying tighter coupling relationships than novice cyclists. Furthermore, significant differences between expert and novice cyclists for all muscle recruitment parameters, except timing of peak EMG amplitude, were also reported.
Resumo:
The purpose of this paper is to conduct a qualitative review of randomised controlled trials in relation to the treatment of adults with co-occurring mental health and substance use disorder (MH/SUD). In particular, integrated approaches are compared with non-integrated approaches to treatment. Ten articles were identified for inclusion in the review. The findings are equivocal with regard to the superior efficacy of integrated approaches to treatment, although the many limitations of the studies need to be considered in our understanding of this finding. Clearly, this is an extremely challenging client group to engage and maintain in intervention research, and the complexity and variability of the problems render control particularly difficult. The lack of available evidence to support the superiority of integration is discussed in relation to these challenges. Much remains to be investigated with regard to integrated management and care for people with co-occurring and MH/SUD, particularly for specific combinations of dual diagnosis and giving consideration to the level of inter-relatedness between the disorders.
Resumo:
In the filed of semantic grid, QoS-based Web service scheduling for workflow optimization is an important problem.However, in semantic and service rich environment like semantic grid, the emergence of context constraints on Web services is very common making the scheduling consider not only quality properties of Web services, but also inter service dependencies which are formed due to the context constraints imposed on Web services. In this paper, we present a repair genetic algorithm, namely minimal-conflict hill-climbing repair genetic algorithm, to address scheduling optimization problems in workflow applications in the presence of domain constraints and inter service dependencies. Experimental results demonstrate the scalability and effectiveness of the genetic algorithm.
Resumo:
In Web service based systems, new value-added Web services can be constructed by integrating existing Web services. A Web service may have many implementations, which are functionally identical, but have different Quality of Service (QoS) attributes, such as response time, price, reputation, reliability, availability and so on. Thus, a significant research problem in Web service composition is how to select an implementation for each of the component Web services so that the overall QoS of the composite Web service is optimal. This is so called QoS-aware Web service composition problem. In some composite Web services there are some dependencies and conflicts between the Web service implementations. However, existing approaches cannot handle the constraints. This paper tackles the QoS-aware Web service composition problem with inter service dependencies and conflicts using a penalty-based genetic algorithm (GA). Experimental results demonstrate the effectiveness and the scalability of the penalty-based GA.
Resumo:
This study directly measured the load acting on the abutment of the osseointegrated implant system of transfemoral amputees during level walking, and studied the variability of the load within and among amputees. Twelve active transfemoral amputees (age: 54±12 years, mass:84.3±16.3 kg, height: 17.8±0.10 m) fitted with an osseointegrated implant for over 1 year participated in the study. The load applied on the abutment was measured during unimpeded, level walking in a straight line using a commercial six-channel transducer mounted between the abutment and the prosthetic knee. The pattern and the magnitude of the three-dimensional forces and moments were revealed. Results showed a low step-to-step variability of each subject, but a high subject-to-subject variability in local extrema of body-weight normalized forces and moments and impulse data. The high subject-to-subject variability suggests that the mechanical design of the implant system should be customized for each individual, or that a fit-all design should take into consideration the highest values of load within a broad range of amputees. It also suggests specific loading regime in rehabilitation training are necessary for a given subject. Thus the loading magnitude and variability demonstrated should be useful in designing an osseointegrated implant system better able to resist mechanical failure and in refining the rehabilitation protocol.
Resumo:
The purpose of this study was to characterise the functional outcome of 12 transfemoral amputees fitted with osseointegrated fixation using temporal gait characteristics. The objectives were (A) to present the cadence, duration of gait cycle, support and swing phases with an emphasis on the stride-to-stride and participant-to-participant variability, and (B) to compare these temporal variables with normative data extracted from the literature focusing on transfemoral amputees fitted with a socket and able-bodied participants. The temporal variables were extracted from the load applied on the residuum during straight level walking, which was collected at 200 Hz by a transducer. A total of 613 strides were assessed. The cadence (46±4 strides/min), the duration of the gait cycle (1.29±0.11 s), support (0.73±0.07 s, 57±3% of CG) and swing (0.56±0.07 s, 43±3% of GC) phases of the participants were 2% quicker, 3%, 6% shorter and 1% longer than transfemoral amputees using a socket as well as 11% slower, 9%, 6% and 13% longer than able-bodied, respectively. All combined, the results indicated that the fitting of an osseointegrated fixation has enabled this group of amputees to restore their locomotion with a highly functional level. Further longitudinal and cross-sectional studies would be required to confirm these outcomes. Nonetheless, the data presented can be used as benchmark for future comparisons. It can also be used as input in generic algorithms using templates of patterns of loading to recognise activities of daily living and to detect falls.