708 resultados para INACTIVATION PROCESS


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The central thesis in the article is that the venture creation process is different for innovative versus imitative ventures. This holds up; the pace of the process differs by type of venture as do, in line with theory-based hypotheses, the effects of certain human capital (HC) and social capital (SC) predictors. Importantly, and somewhat unexpectedly, the theoretically derived models using HC, SC, and certain controls are relatively successful explaining progress in the creation process for the minority of innovative ventures, but achieve very limited success for the imitative majority. This may be due to a rationalistic bias in conventional theorizing and suggests that there is need for considerable theoretical development regarding the important phenomenon of new venture creation processes. Another important result is that the building up of instrumental social capital, which we assess comprehensively and as a time variant construct, is important for making progress with both types of ventures, and increasingly, so as the process progresses. This result corroborates with stronger operationalization and more appropriate analysis method what previously published research has only been able to hint at.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Professional coaching is a rapidly expanding field with interdisciplinary roots and broad application. However, despite abundant prescriptive literature, research into the process of coaching is minimal. Similarly, although learning is inherently recognised in the process of coaching, the process of learning in coaching is little understood and learning theory makes up only a small part of the evidence-based coaching literature. In this grounded theory study of coaches and their clients, the process of learning in coaching across a range of coaching models is examined and discussed. The findings demonstrate how learning in coaching emerged as a process of discovering, applying and integrating new knowledge, which culminated in a process of developing. This process occurred through eight key coaching processes shared between coaches and clients and combined a multitude of learning theories.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Qualitative research methods require transparency to ensure the ‘trustworthiness’ of the data analysis. The intricate processes of organizing, coding and analyzing the data are often rendered invisible in the presentation of the research findings, which requires a ‘leap of faith’ for the reader. Computer assisted data analysis software can be used to make the research process more transparent, without sacrificing rich, interpretive analysis by the researcher. This article describes in detail how one software package was used in a poststructural study to link and code multiple forms of data to four research questions for fine-grained analysis. This description will be useful for researchers seeking to use qualitative data analysis software as an analytic tool.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of the project “Value Alignment Process for Project Delivery” is to provide a catalyst and tools for reform in the building and construction industry to transform business-as-usual performance into exceptional performance. The outcomes of this project will be beneficial to not only the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. The research project consists of a study into best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best approach for a specific project. These resources will be focused on promoting the principles that underlie best practice project delivery, rather than on identifying a particular delivery system. The need for such tools and resources becomes more and more acute as the environment within which the construction industry operates becomes more and more complex, and as business and political imperatives shift to encompass or represent diverse stakeholder interests. To this end, this literature review looks at why it is essential to achieve transformation in the Australian construction industry in the context of its importance to the Australian economy. It seeks to investigate the concepts of ‘alignment’ and value’ as they pertain to construction industry processes and relationships. It comprehensively reviews drivers of project excellence and best practice project delivery principles and looks at how clients approach selection of project delivery systems. It critiques existing project delivery strategies and gives an overview of recent best practice initiatives. The literature review represents a milestone against the Project Agreement and forms a foundation document for this research project

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An important aspect of designing any product is validation. Virtual design process (VDP) is an alternative to hardware prototyping in which analysis of designs can be done without manufacturing physical samples. In recent years, VDP have been generated either for animation or filming applications. This paper proposes a virtual reality design process model on one of the applications when used as a validation tool. This technique is used to generate a complete design guideline and validation tool of product design. To support the design process of a product, a virtual environment and VDP method were developed that supports validation and an initial design cycle performed by a designer. The product model car carrier is used as illustration for which virtual design was generated. The loading and unloading sequence of the model for the prototype was generated using automated reasoning techniques and was completed by interactively animating the product in the virtual environment before complete design was built. By using the VDP process critical issues like loading, unloading, Australian Design rules (ADR) and clearance analysis were done. The process would save time, money in physical sampling and to large extent in complete math generation. Since only schematic models are required, it saves time in math modelling and handling of bigger size assemblies due to complexity of the models. This extension of VDP process for design evaluation is unique and was developed, implemented successfully. In this paper a Toll logistics and J Smith and Sons car carrier which is developed under author’s responsibility has been used to illustrate our approach of generating design validation via VDP.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Study Process Questionnaire (Biggs, 1987) has been widely used in studies investigating learning behaviours in tertiary education. Many of the studies that have used the instrument have investigated the construct validity of the SPQ using a variety of factor analytic methods and techniques in an atheoretical way. Contrary to this method, Burnett and Dart (1997) argued that the hypothesised structure of a scale should be used when assessing the construct validity of an existing instrument. This study investigated the factor structure of the SPQ using a theoretical approach and found strong support for the three approaches to learning structure of the instrument.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In construction, inter-organisational relationships are of the highest importance. Ethical practice and behaviour is a means for improving inter-organisational relationships by providing a clear understanding of the rights and obligations of all parties, improving productivity, affecting long-term business dealings, and influencing quality, time and costs. Therefore, the ability to build sustainable relationships grounded in ethical practice is important to the construction industry. Establishing ethical standards at the beginning of the procurement process provides an ethical platform for the project life cycle and the relationship between procurers and contractors. Therefore it is important to determine what the ethical issues are in the Australian construction industry from members of the industry themselves; including clients. This “bottom up” approach is not a particularly new concept. Ever since the Gyles Royal Commission in 1992 there has been a considerable effort by government agencies to develop policies to improve the ethical behaviour of the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A curriculum for a university-level course called Business Process Modeling is presented in order to provide guidance for the increasing number of institutions who are currently developing such contents. The course caters to undergraduate and post graduate students. Its content is drawn from recent research, industry practice, and established teaching material, and teaches ways of specifying business processes for the analysis and design of process-aware information systems. The teaching approach is a blend of lectures and classroom exercises with innovative case studies, as well as reviews of research material. Students are asked to conceptualize, analyze, and articulate real life process scenarios. Tutorials and cheat sheets assist with the learning experience. Course evaluations from 40 students suggest the adequacy of the teaching approach. Specifically, evaluations show a high degree of satisfaction with course relevance, content presentation, and teaching approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ability to assess a commercial building for its impact on the environment at the earliest stage of design is a goal which is achievable by integrating several approaches into a single procedure directly from the 3D CAD representation. Such an approach enables building design professionals to make informed decisions on the environmental impact of building and its alternatives during the design development stage instead of at the post-design stage where options become limited. The indicators of interest are those which relate to consumption of resources and energy, contributions to pollution of air, water and soil, and impacts on the health and wellbeing of people in the built environment as a result of constructing and operating buildings. 3D object-oriented CAD files contain a wealth of building information which can be interrogated for details required for analysis of the performance of a design. The quantities of all components in the building can be automatically obtained from the 3D CAD objects and their constituent materials identified to calculate a complete list of the amounts of all building products such as concrete, steel, timber, plastic etc. When this information is combined with a life cycle inventory database, key internationally recognised environmental indicators can be estimated. Such a fully integrated tool known as LCADesign has been created for automated ecoefficiency assessment of commercial buildings direct from 3D CAD. This paper outlines the key features of LCADesign and its application to environmental assessment of commercial buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative networks have come to form a large part of the public sector’s strategy to address ongoing and often complex social problems. The relational power of networks, with its emphasis on trust, reciprocity and mutuality provides the mechanism to integrate previously dispersed and even competitive entities into a collective venture(Agranoff 2003; Agranoff and McGuire 2003; Mandell 1994; Mandell and Harrington 1999). It is argued that the refocusing of a single body of effort to a collective contributes to reducing duplication and overlap of services, maximizes increasingly scarce resources and contributes to solving intractable or 'wicked’problems (Clarke and Stewart 1997). Given the current proliferation of collaborative networks and the fact that they are likely to continue for some time, concerns with the management and leadership of such arrangements for optimal outcomes are increasingly relevant. This is especially important for public sector managers who are used to working in a top-down, hierarchical manner. While the management of networks (Agranoff and McGuire 2001, 2003), including collaborative or complex networks (Kickert et al. 1997; Koppenjan and Klijn 2004), has been the subject of considerable attention, there has been much less explicit discussion on leadership approaches in this context. It is argued in this chapter that the traditional use of the terms ‘leader’ or ‘leadership’ does not apply to collaborative networks. There are no ‘followers’ in collaborative networks or supervisor-subordinate relations. Instead there are equal, horizontal relationships that are focused on delivering systems change. In this way the emergent organizational forms such as collaborative networks challenge older models of leadership. However despite the questionable relevance of old leadership styles to the contemporary work environment, no clear alternative has come along to take its place.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This appendix describes the Order Fulfillment process followed by a fictitious company named Genko Oil. The process is freely inspired by the VICS (Voluntary Inter-industry Commerce Solutions) reference model1 and provides a demonstration of YAWL’s capabilities in modelling complex control-flow, data and resourcing requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter describes how the YAWL meta-model was extended to support the definition of variation points. These variation points can be used to describe different variants of a YAWL process model in a unified, configurable model. The model can then be configured to suit the needs of specific settings, e.g. for a new organization of project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Historically, asset management focused primarily on the reliability and maintainability of assets; organisations have since then accepted the notion that a much larger array of processes govern the life and use of an asset. With this, asset management’s new paradigm seeks a holistic, multi-disciplinary approach to the management of physical assets. A growing number of organisations now seek to develop integrated asset management frameworks and bodies of knowledge. This research seeks to complement existing outputs of the mentioned organisations through the development of an asset management ontology. Ontologies define a common vocabulary for both researchers and practitioners who need to share information in a chosen domain. A by-product of ontology development is the realisation of a process architecture, of which there is also no evidence in published literature. To develop the ontology and subsequent asset management process architecture, a standard knowledge-engineering methodology is followed. This involves text analysis, definition and classification of terms and visualisation through an appropriate tool (in this case, the Protégé application was used). The result of this research is the first attempt at developing an asset management ontology and process architecture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A configurable process model provides a consolidated view of a family of business processes. It promotes the reuse of proven practices by providing analysts with a generic modelling artifact from which to derive individual process models. Unfortunately, the scope of existing notations for configurable process modelling is restricted, thus hindering their applicability. Specifically, these notations focus on capturing tasks and control-flow dependencies, neglecting equally important ingredients of business processes such as data and resources. This research fills this gap by proposing a configurable process modelling notation incorporating features for capturing resources, data and physical objects involved in the performance of tasks. The proposal has been implemented in a toolset that assists analysts during the configuration phase and guarantees the correctness of the resulting process models. The approach has been validated by means of a case study from the film industry.