106 resultados para workflow scheduling
Resumo:
Workflow patterns have been recognized as the theoretical basis to modeling recurring problems in workflow systems. A form of workflow patterns, known as the resource patterns, characterise the behaviour of resources in workflow systems. Despite the fact that many resource patterns have been discovered, people still preclude them from many workflow system implementations. One of reasons could be obscurityin the behaviour of and interaction between resources and a workflow management system. Thus, we provide a modelling and visualization approach for the resource patterns, enabling a resource behaviour modeller to intuitively see the specific resource patterns involved in the lifecycle of a workitem. We believe this research can be extended to benefit not only workflow modelling, but also other applications, such as model validation, human resource behaviour modelling, and workflow model visualization.
Resumo:
Information security policies play an important role in achieving information security. Confidentiality, Integrity, and Availability are classic information security goals attained by enforcing appropriate security policies. Workflow Management Systems (WfMSs) also benefit from inclusion of these policies to maintain the security of business-critical data. However, in typical WfMSs these policies are designed to enforce the organisation’s security requirements but do not consider those of other stakeholders. Privacy is an important security requirement that concerns the subject of data held by an organisation. WfMSs often process sensitive data about individuals and institutions who demand that their data is properly protected, but WfMSs fail to recognise and enforce privacy policies. In this paper, we illustrate existing WfMS privacy weaknesses and introduce WfMS extensions required to enforce data privacy. We have implemented these extensions in the YAWL system and present a case scenario to demonstrate how it can enforce a subject’s privacy policy.
Resumo:
Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.
Resumo:
While there are many similarities between the languages of the various workflow management systems, there are also significant differences. One particular area of differences is caused by the fact that different systems impose different syntactic restrictions. In such cases, business analysts have to choose between either conforming to the language in their specifications or transforming these specifications afterwards. The latter option is preferable as this allows for a separation of concerns. In this paper we investigate to what extent such transformations are possible in the context of various syntactical restrictions (the most restrictive of which will be referred to as structured workflows). We also provide a deep insight into the consequences, particularly in terms of expressive power, of imposing such restrictions.
Resumo:
This thesis addresses the process simulation and validation in Business Process Management. It proposes that the hybrid Multi Agent System (MAS) / 3D Virtual World approach is a valid method for better simulating the behaviour of human resources in business processes, supporting a wide range of rich visualization applications that can facilitate communication between business analysts and stakeholders. It is expected that the findings of this thesis may be fruitfully extended from BPM to other application domains, such as social simulation in video games and computer-based training animations.
Resumo:
Railway crew scheduling problem is the process of allocating train services to the crew duties based on the published train timetable while satisfying operational and contractual requirements. The problem is restricted by many constraints and it belongs to the class of NP-hard. In this paper, we develop a mathematical model for railway crew scheduling with the aim of minimising the number of crew duties by reducing idle transition times. Duties are generated by arranging scheduled trips over a set of duties and sequentially ordering the set of trips within each of duties. The optimisation model includes the time period of relief opportunities within which a train crew can be relieved at any relief point. Existing models and algorithms usually only consider relieving a crew at the beginning of the interval of relief opportunities which may be impractical. This model involves a large number of decision variables and constraints, and therefore a hybrid constructive heuristic with the simulated annealing search algorithm is applied to yield an optimal or near-optimal schedule. The performance of the proposed algorithms is evaluated by applying computational experiments on randomly generated test instances. The results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time for large-sized problems.
Resumo:
In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning,mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.
Resumo:
A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.
Resumo:
Addressing the Crew Scheduling Problem (CSP) in transportation systems can be too complex to capture all details. The designed models usually ignore or simplify features which are difficult to formulate. This paper proposes an alternative formulation using a Mixed Integer Programming (MIP) approach to the problem. The optimisation model integrates the two phases of pairing generation and pairing optimisation by simultaneously sequencing trips into feasible duties and minimising total elapsed time of any duty. Crew scheduling constraints in which the crew have to return to their home depot at the end of the shift are included in the model. The flexibility of this model comes in the inclusion of the time interval of relief opportunities, allowing the crew to be relieved during a finite time interval. This will enhance the robustness of the schedule and provide a better representation of real-world conditions.
Resumo:
Behavioral models capture operational principles of real-world or designed systems. Formally, each behavioral model defines the state space of a system, i.e., its states and the principles of state transitions. Such a model is the basis for analysis of the system’s properties. In practice, state spaces of systems are immense, which results in huge computational complexity for their analysis. Behavioral models are typically described as executable graphs, whose execution semantics encodes a state space. The structure theory of behavioral models studies the relations between the structure of a model and the properties of its state space. In this article, we use the connectivity property of graphs to achieve an efficient and extensive discovery of the compositional structure of behavioral models; behavioral models get stepwise decomposed into components with clear structural characteristics and inter-component relations. At each decomposition step, the discovered compositional structure of a model is used for reasoning on properties of the whole state space of the system. The approach is exemplified by means of a concrete behavioral model and verification criterion. That is, we analyze workflow nets, a well-established tool for modeling behavior of distributed systems, with respect to the soundness property, a basic correctness property of workflow nets. Stepwise verification allows the detection of violations of the soundness property by inspecting small portions of a model, thereby considerably reducing the amount of work to be done to perform soundness checks. Besides formal results, we also report on findings from applying our approach to an industry model collection.
Resumo:
Formal representations of business processes are used for analysis of the process behavior. Workflow nets are a widely used formalism for describing the behavior of business processes. Structure theory of processes investigates the relation between the structure of a model and its behavior. In this paper, we propose to employ the connectivity property of workflow nets as an angle to their structural analysis. In particular, we show how soundness verification can be organized using biconnected components of a workflow net. This allows for efficient identification and localization of flaws in the behavior of workflow nets and for supporting process analysts with diagnostic information
Resumo:
Over about the last decade, people involved in game development have noted the need for more formal models and tools to support the design phase of games. It is argued that the present lack of such formal tools is currently hindering knowledge transfer among designers. Formal visual languages, on the other hand, can help to more effectively express, abstract and communicate game design concepts. Moreover, formal tools can assist in the prototyping phase, allowing designers to reason about and simulate game mechanics on an abstract level. In this paper we present an initial investigation into whether workflow patterns – which have already proven to be effective for modeling business processes – are a suitable way to model task succession in games. Our preliminary results suggest that workflow patterns show promise in this regard but some limitations, especially in regard to time constraints, currently restrict their potential.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.