438 resultados para international Grid projects
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
In recent years there has been a noticeable move by various public institutions, such as public service broadcasters and community media organisations, to capture and disseminate the voices and viewpoints of ‘ordinary people’ through inviting them to share stories about their lives. One of the foremost objectives of many such projects is to provide under-represented individuals and groups with an opportunity to express and represent themselves; as such, the capture and broadcast of ‘authentic voices’ is a central value. This paper discusses the notion of ‘authentic voice’, and questions the framing role of public media organisations in storytelling projects that aim to provide individuals with space for self-expression and self-representation. It considers the ways in which tensions arise on multiple levels when individuals are asked to express and represent themselves within projects and spaces that are managed by institutions. This paper begins by discussing the challenges and opportunities that arise within storytelling projects that are facilitated by public institutions and community media arts organisations, and that aim to amplify the voices of “ordinary people” (Thumim, 2009). It examines ways in which ‘voice’ is facilitated, curated, broadcast and distributed within such projects, particularly questioning the ways in which project facilitation and the curation of stories for public broadcast can both help and hinder the amplification of ‘authentic voice’. Furthermore, we seek to discuss how ‘authentic voice’ is defined, and what is involved in the process of amplification. The paper moves on to discuss a case study in order to demonstrate some of the tensions that are evident within a storytelling project that is managed by a public institution – Australia’s national broadcaster – and the ways these tensions impact upon the capture and broadcast of an ‘authentic voice’ for project participants. The Australian Broadcasting Corporation’s (ABC) ‘Heywire’ project is a storytelling competition and website that aims to ‘give voice’ to 16-22 year olds who live in rural, regional and remote parts of Australia. Looking at tensions that exist on organisational, political and philosophical levels within the Heywire project reveals a number of conflicts of interest and objectives between the institution and project participants. This leads us to question whether institutionally-managed storytelling projects can effectively support individuals to have an ‘authentic voice’, and whether struggles of aims and objectives diminish the personal benefits that people may derive from expressing and representing themselves within such projects.
Resumo:
The establishment and continuity of two international comparative assessments of science learning—the IEA’s TIMSS project and the OECD’s PISA project—have meant that there are now high-status reference points for other national and more local approaches to assessing the efficacy of science teaching and learning. Both projects, albeit with very different senses of what the outcome of science learning should be, have contributed positively and negatively to the current state of assessment of school science. The TIMSS project looks back at the science that is commonly included in the curricula of the participating countries. It is thus not about established school science nor about innovations in it. PISA is highly innovative looking, prospectively forward to see how students can use their science learning in everyday life situations. In this chapter some of these positives and negatives are discussed.
Resumo:
It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.
Resumo:
This paper addresses challenges part of the shift of paradigm taking place in the way we produce, transmit and use power related to what is known as smart grids. The aim of this paper is to explore present initiatives to establish smart grids as a sustainable and reliable power supply system. We argue that smart grids are not isolated to abstract conceptual models alone. We suggest that establishing sustainable and reliable smart grids depend on series of contributions including modeling and simulation projects, technological infrastructure pilots, systemic methods and training, and not least how these and other elements must interact to add reality to the conceptual models. We present and discuss three initiatives that illuminate smart grids from three very different positions. First, the new power grid simulator project in the electrical engineering PhD program at Queensland University of Technology (QUT). Second, the new smart grids infrastructure pilot run by the Norwegian Centers of Expertise Smart Energy Markets (NCE SMART). And third, the new systemic Master program on next generation energy technology at østfold University College (Hiø). These initiatives represent future threads in a mesh embedding smart grids in models, technology, infrastructure, education, skills and people.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.
Resumo:
There has been a greater focus on strengthening evaluation capacity building (ECB) within development organisations in recent years. This can be attributed in part to the growing appreciation of the value of participatory and collaborative forms of evaluation. Evaluation is increasingly seen as an ongoing learning process and an important means of strengthening capacity and improving organisational performance (Horton et al., 2003:7). While there are many benefits of using participatory methodologies in ECB projects, our experiences and a review of the literature in this area highlight the many challenges, issues and contradictions that can affect the success of such ECB efforts. We discuss these issues, drawing on our learnings from the ongoing participatory action research (PAR) project 'Assessing Communication for Social Change’ (AC4SC). This four year project, which began in 2007, is a collaboration between communication and development academics and evaluation specialists from two Australian universities and communication for development practitioners and monitoring and evaluation (M&E) staff in the NGO Equal Access Nepal (EAN). The aim is to develop, implement, and evaluate a participatory methodology for assessing the social change impacts of community radio programs produced by EAN. It builds on previous projects that used ethnographic action research (EAR) methodology (Tacchi et al., 2007).
Resumo:
"In this chapter the authors present a critique of Participatory Evaluation as worked in development projects, in this case, in Nepal. The article works between established claims that Participatory Evaluation builds capacity at programmatic and organisational levels, and the specific experiences of these claims in the authors’ current work. They highlight the need to address key difficulties such as high turn-over of staff and resulting loss of capacity to engage in Participatory Evaluation, and the difficulty of communication between academic as compared with local practical wisdoms. A key issue is the challenge of addressing the inevitable issues of power inequities that such approaches encounter. While Participatory Evaluation has been around for some time, it has only enjoyed more widespread recognition of its value in comparatively recent times, with its uptake in international development environments. To this extent, the practice is still in its early stages of development, and Jo, June and Michael’s work contributes to strengthening and more comprehensively understanding it. With regard to the meta-theme of this publication, this chapter is an example of how context not only influences the methodology to be used and the praxis of how it is to be used, but contributes to early explication of the core nature of an emerging methodology."
Resumo:
Gross value of cons truction work in the repair , maintenance, minor alte ration and addition (RMAA) sector in Hong Kong has expanded dramatically by 58% from 1998 to 2007, accounting for over 53% of the whole construction market in 2007. Unfortunately, the portion of industrial accidents arising from this sector also increased substantially during the same period. It is important to improve the safety performance of the RMAA sector. This paper has set out the objectives to examine safety statistics of RMAA works; to compare them with those of green field projects; and more importantly, to highlight potential hurdles en countered in the process of comparison and finally to provide effective recommendations for overcoming these impediments. To strive for continuous safety improvement of RMAA works, comparable safety statistics should be compiled for this sector.
Resumo:
Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.
Resumo:
Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.
Resumo:
As the end of the Cold War approached in 1989, Caroline Thomas argued: “It is important that the discipline [International Relations, IR] should address the issue of disease and more broadly, health, not simply to facilitate containment of disease transmission across international borders but also because central notions of justice, equity, efficiency and order are involved” (1989:273).1 Ten years later, Craig Murphy echoed these sentiments. Murphy (2001: 352) proposed that IR had yet to grapple with the political consequences of growing inequality between the world’s rich and poor, and areas such as health—where these inequalities were most stark—should become the field’s core business. How IR’s theories and methods would approach these issues was less clear. Bettcher and Yach (1998) cautioned that IR would be unable to develop progressive research projects that explored global health diplomacy as a global public good without adopting new perspectives and methods. Others warned that the expansion of security studies into areas such as global health would weaken the intellectual coherency of the field (Walt 1991:213). Taking its cue from the recent Ng and Prah Ruger (2011) study, this paper returns to these concerns to briefly explore key trends and potential future concerns of research in IR on health...
Resumo:
Occupational segregation is a major source of labour market rigidity and economic inefficiency due to a waste of human resources. Organisations are repeatedly recognised as gendered constructs exhibiting sustained work segregation, income and status inequality, as well as cultural and individual images of gender, and these are perpetuated through their processes, practices and pressures (Acker, 1990). A large percentage of Australia’s workforce is now employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. For a continued strong performance in this economy, organisations that employ project personnel will need to consider how they address inclusivity and equality in diversity in project based temporary organisations to ensure the supply of high quality project professionals into the future. This paper investigates the inclusion processes experienced and exercised by men and women working in temporary organisations in project situations through a review of reports on the inclusion processes experienced by 60 project managers and project workers in three project based industries in Australia. Results indicate that temporary organisations are not implementing equality and diversity management strategies at the macro level and project workers are accepting this lack of recognition. However inclusivity and equality at the micro level of the team is seen as vital.