232 resultados para BPM lifecycle


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper consists of a detailed case narrative on how a leading Australian Finance organisation has utilised contemporary Business Process Management (BPM) concepts for improving the IT incident management processes within the whole organisation. The target audience includes practitioners who are interested in BPM case studies and Academics who may be seeking case studies for innovative teaching practices.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Service-Oriented Architectures (SOAs), software systems are decomposed into independent units, namely services, that interact with one another through message exchanges. To promote reuse and evolvability, these interactions are explicitly described right from the early phases of the development lifecycle. Up to now, emphasis has been placed on capturing structural aspects of service interactions. Gradually though, the description of behavioral dependencies between service interactions is gaining increasing attention as a means to push forward the SOA vision. This paper deals with the description of these behavioral dependencies during the analysis and design phases. The paper outlines a set of requirements that a language for modeling service interactions at this level should fulfill, and proposes a language whose design is driven by these requirements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Process Management (BPM) has been identified as the number one business priority by a recent Gartner study (Gartner, 2005). However, BPM has a plethora of facets as its origins are in Business Process Reengineering, Process Innovation, Process Modelling, and Workflow Management to name a few. Organisations increasingly recognize the requirement for an increased process orientation and require appropriate comprehensive frameworks, which help to scope and evaluate their BPM initiative. This research project aims toward the development of a holistic and widely accepted BPM maturity model, which facilitates the assessment of BPM capabilities. This paper provides an overview about the current model with a focus on the actual model development utilizing a series of Delphi studies. The development process includes separate studies that focus on further defining and expanding the six core factors within the model, i.e. strategic alignment, governance, method, Information Technology, people and culture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper is a detailed case narrative on how a Faculty of a leading Australian University conducted a rigorous process improvement project, applying fundamental Business Process Management (BPM) concepts. The key goal was to increase the efficiency of the faculty’s service desk. The decrease of available funds due to reducing student numbers and the ever increasing costs associated with service desk prompted this project. The outcomes of the project presented a set of recommendations which leads to organizational innovation having information technology as an enabler for change. The target audience includes general BPM practitioners or academics who are interested in BPM related case studies, and specific organisations who might be interested in conducting BPM within their service desk processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A range of influences, both technical and organizational, has encouraged the widespread adoption of Enterprise Systems (ES). The integrated and process-oriented nature of Enterprise Systems has led organizations to use process modelling as a means of managing the complexity of these systems, and to aid in achieving business goals. Past research illustrates how process modelling is applied across different Enterprise Systems lifecycle phases. However, no empirical evidence exists to evaluate what factors are essential for a successful process modelling initiative, in general or in an ES context. This research-in-progress paper reports on an empirical investigation of the factors that influence process modelling success. It presents an a-priori process modelling critical-success-factors-model, describes its derivation, and concludes with an outlook to the next stages of the research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Service Management describes the emerging discipline dedicated to the IT-enabled management of services as corporate assets. Business Service Management deals with the service orientation of the organisation and the provisioning and use of business services. The term business service describes an autonomous transformational capability that is offered to and consumed by external or internal customers for their benefit. The prefix ‘business’ stresses that such a service has a market value, requires the ability to be managed internally as a corporate asset and that its implementation is technology-agnostic. While business services (or so called capabilities) have attracted the attention of many vendors and organisations, a lack of understanding of the activities required for the successful management of such business services remains a critical issue. In order to fill this gap, a framework consisting of Service Lifecycle Management, Service Value Management, Service Relationship Management and Service Enablement is proposed. This Framework has the potential to provide organisations with the much needed guidance in their attempts to convert current IT-driven service initiatives into successful service-centric business models.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The endeavour to obtain estimates of durability of components for use in lifecycle assessment or costing and infrastructure and maintenance planning systems is large. The factor method and the reference service life concept provide a very valuable structure, but do not resolve the central dilemma of the need to derive an extensive database of service life. Traditional methods of estimating service life, such as dose functions or degradation models, can play a role in developing this database, however the scale of the problem clearly indicates that individual dose functions cannot be derived for each component in each different local and geographic setting. Thus, a wider range of techniques is required in order to devise reference service life. This paper outlines the approaches being taken in the Cooperative Research Centre for Construction Innovation project to predict reference service life. Approaches include the development of fundamental degradation and microclimate models, the development of a situation-based reasoning ‘engine’ to vary the ‘estimator’ of service life, and the development of a database on expert performance (Delphi study). These methods should be viewed as complementary rather than as discrete alternatives. As discussed in the paper, the situation-based reasoning approach in fact has the possibility of encompassing all other methods.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BIM (Building Information Modelling) is an approach that involves applying and maintaining an integral digital representation of all building information for different phases of the project lifecycle. This paper presents an analysis of the current state of BIM in the industry and a re-assessment of its role and potential contribution in the near future, given the apparent slow rate of adoption by the industry. The paper analyses the readiness of the building industry with respect to the product, processes and people to present an argument on where the expectations from BIM and its adoption may have been misplaced. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perceptions and expectations of BIM.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

While Business Process Management (BPM) is an established discipline, the increased adoption of BPM technology in recent years has introduced new challenges. One challenge concerns dealing with process model complexity in order to improve the understanding of a process model by stakeholders and process analysts. Features for dealing with this complexity can be classified in two categories: 1) those that are solely concerned with the appearance of the model, and 2) those that in essence change the structure of the model. In this paper we focus on the former category and present a collection of patterns that generalize and conceptualize various existing features. The paper concludes with a detailed analysis of the degree of support of a number of state-of-the-art languages and language implementations for these patterns.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Process Management (BPM) has increased in popularity and maturity in recent years. Large enterprises engage use process management approaches to model, manage and refine repositories of process models that detail the whole enterprise. These process models can run to the thousands in number, and may contain large hierarchies of tasks and control structures that become cumbersome to maintain. Tools are therefore needed to effectively traverse this process model space in an efficient manner, otherwise the repositories remain hard to use, and thus are lowered in their effectiveness. In this paper we analyse a range of BPM tools for their effectiveness in handling large process models. We establish that the present set of commercial tools is lacking in key areas regarding visualisation of, and interaction with, large process models. We then present six tool functionalities for the development of advanced business process visualisation and interaction, presenting a design for a tool that will exploit the latest advances in 2D and 3D computer graphics to enable fast and efficient search, traversal and modification of process models.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: Exercise is widely promoted as a method of weight management, while the other health benefits are often ignored. The purpose of this study was to examine whether exercise-induced improvements in health are influenced by changes in body weight. Methods: Fifty-eight sedentary overweight/obese men and women (BMI 31.8 (SD 4.5) kg/m2) participated in a 12-week supervised aerobic exercise intervention (70% heart rate max, five times a week, 500 kcal per session). Body composition, anthropometric parameters, aerobic capacity, blood pressure and acute psychological response to exercise were measured at weeks 0 and 12. Results: The mean reduction in body weight was −3.3 (3.63) kg (p<0.01). However, 26 of the 58 participants failed to attain the predicted weight loss estimated from individuals’ exercise-induced energy expenditure. Their mean weight loss was only −0.9 (1.8) kg (p<0.01). Despite attaining a lower-than-predicted weight reduction, these individuals experienced significant increases in aerobic capacity (6.3 (6.0) ml/kg/min; p<0.01), and a decreased systolic (−6.00 (11.5) mm Hg; p<0.05) and diastolic blood pressure (−3.9 (5.8) mm Hg; p<0.01), waist circumference (−3.7 (2.7) cm; p<0.01) and resting heart rate (−4.8 (8.9) bpm, p<0.001). In addition, these individuals experienced an acute exercise-induced increase in positive mood. Conclusions: These data demonstrate that significant and meaningful health benefits can be achieved even in the presence of lower-than-expected exercise-induced weight loss. A less successful reduction in body weight does not undermine the beneficial effects of aerobic exercise. From a public health perspective, exercise should be encouraged and the emphasis on weight loss reduced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Business Process Management (BPM) in recent years has become a highest priority area for most organizations. Since this concept is multidisciplinary, success in this endeavour requires considering different factors. A number of studies have been conducted to identify these factors; however, most are limited to the introduction of high-level factors or to the identification of the means of success within only a specific context. This paper presents a holistic framework of success factors as well as the associated means for achieving success. This framework introduces nine factors, namely culture, leadership, communication, Information Technology, strategic alignment, people, project management, performance measurement and methodology. Each of these factors are characterized further by defining some sub-constructs and under each sub construct the means for achieving success are also introduced. This framework including means for achieving success can be useful for BPM project stakeholders in adequately planning the initiative and checking the progress during the implementation.